CHECK POINTS CHECKED REMARKS S.NO YES NO 1 Record the Status of IC -1 / BC/ IC -2 before switching off the Board. Ensure that incoming supply is switched off at upstream End & CB isolated . 2
3 Record serial number & name plate details 4 Inspect for damages in MCCB ‘s & Pad lock set.
5 Perform a operational check of all selector switches , MCB’s , MCCB’s .& Pad lock. 6 Check the healthiness of incoming supply LED circuit fuses ( R-Y-B) Perform a functional check of NO /NC contacts changeover and check the tightness of 7 all terminals at Aux Cont/ Add On Cont. Check the CT’s Secondary Tightness at Ammeter end and also in Ammeter Selector switch 8