PREVENTIVE MAINTENANCE PM-Freq (Q/H/Y) :___________________

ACTION TAKEN STATUS


CHECK POINTS CHECKED REMARKS
S.NO YES NO  
1 Record the Status of IC -1 / BC/ IC -2 before switching off the Board.          
Ensure that incoming supply is switched off at upstream End & CB isolated .
2
         
3 Record serial number & name plate details          
4 Inspect for damages in MCCB ‘s & Pad lock set.
         
5 Perform a operational check of all selector switches , MCB’s , MCCB’s .& Pad lock.          
6 Check the healthiness of incoming supply LED circuit fuses ( R-Y-B)          
Perform a functional check of NO /NC contacts changeover and check the tightness of
7
all terminals at Aux Cont/ Add On Cont.
Check the CT’s Secondary Tightness at Ammeter end and also in Ammeter Selector switch
8
         

         
         
         

         
         