Gravity Sewers Spreadsheet

Project Name: Unknown Sewer Project Review Engineer: ETC Date: 2/21/12

Manhole Stations Δ Length of Pipe Check for Length Slope Invert Check for Slope*
Main or Line Slope (%)
From To (ft) ≤ 400 ft Elevation Out (ft) Elevation In (ft) Δ Elevation (ft) Slope (ft/ft) ≤ 0.004
Main A Ex MH A1 107.31 OK 457.77 450.15 7.62 0.0710 OK 7.10
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
Gravity Sewers Spreadsheet
Project Name: Unknown Sewer Project Review Engineer: ETC Date: 2/21/12

2 1 Where: V = velocity (ft/s)


Mannings formula: k k = 1.486
V = R3 S 2 n = Manning's coefficient (0.013)
n R = hydraulic radius (ft)
S = slope (ft/ft)
A A = cross sectional area of flow (ft2)
R= P = wetted perimeter (ft)
P
10 CSR 20-8.120(5)(D)1. -- All sewers shall be designed and constructed to give mean velocities, when flowing full, of not less than 2 ft/s.
10 CSR 20-8.120(5)(D)5. -- High velocity protection. – Where velocities greater than 15 ft/s are attained, special provision shall be made to protect against displacement by
erosion and impact.

Check for Check if Support is


Diameter
Main or Line Unit Variable n Area (ft2) P (ft) R2/3 (ft) S1/2 (ft/ft) V (ft/s) Velocity Needed
(in)
≤ 2 ft/s > 15 ft/s
Main A 1.486 0.013 8.0 0.3491 2.0944 0.3029 0.2665 9.22 OK NO
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
1.486 0.013 OK YES
Gravity Sewers Spreadsheet
Project Name: Unknown Sewer Project Review Engineer: ETC Date: 2/21/12

New Collection Systems:


Present Population: 200
Predicted Population (20-year planning period): 1,000 10 CSR 20-8.110(4)(C )3.

Design average flow: 100,000.00 gpd = Predicted Population x 100 gpd/capita


10 CSR 20-8.110(4)(C )4.C.(I)
Peaking factor: 1.39 = (18 + √Predicted Population) / (4 + √Predicted Population)
10 CSR 20-8.110(4)(C )4.C.(II) - Figure 1.
Design peak hourly flow: 139,300.70 gph = Peaking factor x Design average flow gpd
10 CSR 20-8.110(4)(C )4.C.(II)

Design average BOD5: 170.00 lbs BOD5/day = Predicted Population x 0.17 lbs BOD 5/day/capita
10 CSR 20-8.110(4)(C )5.C.(I)
Design average SS: 200.00 lbs SS/day = Predicted Population x 0.20 lbs SS/day/capita
10 CSR 20-8.110(4)(C )5.C.(I)

Existing Collection Systems:

*Slope 10 CSR 20-8.120(5)(D)1.:


Nominal Sewer Size (in) Minimum Slope (ft/100 ft)
8 0.40
10 0.28
12 0.22
14 0.17
15 0.15
16 0.14
18 0.12
21 0.10
24 0.08
27 0.067
30 0.058
33 0.052
36 0.046
39 0.041
42 0.037

Instructions for Spreadsheet:


• Font in blue denotes input from the plans and specifications.
• "Check for Slope*" column in the Slope tab is set for an 8" pipe with a minimum slope of 0.004 ft/ft. The equation can be changed to reflect the appropriate
pipe size according to the chart located on this page.
• Citations from the proposed amendment to 10 CSR 20-8.120 will be effective February 29, 2012.
• To add more rows to the tables developed, highlight the last row in the table. Place the cursor on the right, bottom corner of the last highlighted cell, click
on this position and drag down to create more rows. This will maintain the formatting and equations embedded in the cells.