P6EX
XTRACTT (beta
a) 
Rel. 19‐NOV‐0
09 
Importan nt Notes: 
‐ SDK shou uld be installed in yourr computer. 
‐ P6EXTRA ACT Excel file is designeed for 2007 format only. 
‐ P6EXTRA ACT Access ffile can be oopened by b both Accesss 2003 & 20 007. 
‐ P6EXTRA ACT.mdb should be exttracted to C C:/ otherwisse the queryy in the exceel file will 
look for ssome location which yo ou have to manually seet‐up. 
‐ P6EXTRA ACT.xlms can be saved anywhere in the comp puter. 
‐ P6EXTRA ACT.xlms co ontains maccro (it’s safee, don’t worrry) so pleasse make surre that 
security llevel is set tto low. 
‐ You may modify datta in the exccel sheet beecause it’s just utilizingg the pivot ttable and 
reports tools. 
 
Disclaime er: 
        The pprogrammerr has spent effort to make sure that tthis simple program doess extract the correct dataa 
for s‐curve, cash‐flow and resourcces spread an
nalysis, howeever, may no
ot be held responsible for any loss an
nd 
damage arising from u using it. 
 
HOW
W TO UTTILIZE P6EXTRA
P ACT.mdb 
   
   
 
  1| Log‐in with P6 username and paassword 
 
 
 
 
 
  2| Chooose the project that you want to extract the 
  data fro
om. (format: “Prroject ID – Projject Name”)
 
  3| Chooose the spread interval (“W”‐ weekly and “M
M” – 
monthlyy) then click EXTTRACT. 
 
 
 
4| Clickk UPDATE ACTIVVITIES to updatte the s‐curve aand 
 
cash flow
w sheet in the P
P6EXTRACT.xlsm
m (excel 2007 
  format)..  
 

5| Clickk UPDATE RESO
OURCES to updaate the resourcces 
spread d
data sheet in th
he P6EXTRACT.xxlsm (excel 200
07 
format)..  
adrianne.diasanta@gm
mail.com  

 
 

HOW
W TO UTTILIZE P6EXTRA
P m 
ACT.xlsm
 
  1| Click O
Options 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2| Clickk Enable this Coontent
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
  3| Click S‐CURVE t
C urve 
tab to view S‐cu
 
adrianne.diasanta@gm
mail.com  

 
 
 
 
 
 
       
 
 
 
 
 
 
 
 
 
 
  4| Click CAASH FLOW tab tto view cash floow 
  analysis 
graphical a
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  5| CClick RESOURCEES tab to view rresource 
  grap
phical analysis.

 
 

TROUBLESHO
OOTING 
adrianne.diasanta@gm
mail.com  

 
A) ODBC –co
onnection to ‘Primavera P
P6 SDK’ faileed 
 
 
 
 
 
 
 
 
 
So
olution: 
 
 
 

    1| Go to Toolls ÆDatabase U
Utilities Æ Linked 
Table Manageer 
 

 
2| Choose “Select All” 
 

 
3| Choose “OK” 
 

 
adrianne.diasanta@gmail.com  

 
4| Choose your Primavera P6 SDK 
  connection. 

This will linked all the tables now to your SDK Connection. 