Sunteți pe pagina 1din 12

Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)

Dist: Banaskantha, Gujarat.

SCHEDULE-A
(See Clause 10.1)

SITE OF THE PROJECT

1 The Site

1.1 Site of the Project Highway shall include the land, buildings, structures and road works as
described in Annex-I of this Schedule-A.

1.2 An inventory of the Site including the land, buildings, structures, road works, trees and
any other immovable property on or attached to the Site shall be prepared jointly by the
Authority Representative and the Contractor and such inventory shall form part of the
memorandum referred to in Clause 10.3.1 of the Agreement.

1.3 The alignment plans of the Project Highway are specified in Annex-III.

1.4 The status of the Environmental Clearances obtained or awaited is given in Annex-IV.

Page A - 1
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.

Annex– I
(Schedule-A)
Site for the Project

1 The Site

The site of the Project Highway comprises the section of National Highway 27
commencing from existing km 565.850 to km 569.600 Near Vishwakarma Temple
Deesa to Near APMC Market yard Deesa on Km.339.700 to Km 601.000 of NH-27 in
the State of Gujarat on EPC mode. The land, carriageway and structures comprising the
site are described below:-

2. Land
The Site of the Project comprises the land described below:
Details of Existing ROW on NH-27 As per Strip Maps
Ex.
Ex. RHS in Ex. LHS in
Sl. No. Chainage in Remarks
Meter Meter
Km
Banas Banas
1 565.000
River River
Banas Banas
2 565.050
River River
3 565.100 38.63 27.38
4 565.150 38.33 27.68
5 565.200 37.8 28.2
6 565.250 37.13 28.88
7 565.300 33.5 30
8 565.350 33.5 30
9 565.400 30.5 30.5
10 565.450 31.41 29.59
11 565.500 30.7 30.3
12 565.550 30.23 30.78
13 565.600 30.1 30.9
14 565.650 30.13 30.88
15 565.700 30.05 30.95
16 565.750 28.1 32.9
17 565.800 27.31 33.69
18 565.850 27.65 33.35 Start of Proposed Approach

Page A - 2
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.

19 565.900 28.25 34.75


20 565.950 28 33
21 566.000 28 33
22 566.050 29.37 31.63
23 566.100 29.75 31.25 Km 566.130 Electric wire crossing
24 566.150 29.75 31.25 Start of Proposed Pier
25 566.200 29.75 31.25
26 566.250 29.72 31.29
27 566.300 30.15 30.85
28 566.350 31.5 29.5
29 566.400 32.05 28.95 Km 566.420 Electric wire Crossing
30 566.450 30.9 30.1
31 566.500 30.15 30.85
Existing Km.566.585 Junction of
32 566.550 32.35 28.65
Gayatri Temple
33 566.600 32.35 28.65
34 566.650 31.42 29.58 Slab Culvert
35 566.700 30.6 30.4
36 566.750 30.3 30.7
37 566.800 29.95 31.05
38 566.850 29.48 31.53
39 566.900 28.9 32.1
40 566.950 28.55 32.45
41 567.000 28.55 32.45 Junction of Jalaram Temple
42 567.050 33.15 27.85
43 567.100 33.9 27.1
44 567.150 33.91 27.09
45 567.200 32.6 28.4
46 567.250 30.38 30.63
47 567.300 30.13 30.87 Km 567.327 Box Culvert
48 567.350 29.77 31.23
49 567.400 30 31
50 567.450 28.13 32.87
Page A - 3
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.

51 567.500 27.6 33.4


52 567.550 28.95 32.05
53 567.600 30.5 30.5 Km 567.620 Electric wire Crossing
54 567.650 30.38 30.62 Junction of Ambedkar statue
55 567.700 30.34 30.67 Km 567.695 Electric wire Crossing
56 567.750 30.3 30.7
57 567.800 30.35 30.65
58 567.850 30.3 30.7
59 567.900 30.1 30.9
60 567.950 30.15 30.85 Km 567.969 Slab Culvert
61 568.000 30.15 30.85
62 568.050 30.15 30.85
63 568.100 30.15 30.85
64 568.150 30.15 30.85
65 568.200 30.15 30.85
66 568.250 30.15 30.85
67 568.300 30.15 30.85
68 568.350 30.15 30.85
69 568.400 36.98 24.02
70 568.450 36.98 24.02 Km 568.470 Minor bridge
71 568.500 36.98 24.02
72 568.550 36.98 24.02
73 568.600 36.98 24.02
74 568.650 36.98 24.02
75 568.700 36.98 24.02
76 568.750 36.98 24.02
77 568.800 36.98 24.02
78 568.850 36.98 24.02
79 568.900 36.98 24.02
80 568.950 36.98 24.02
81 569.000 36.98 24.02 Km 568.995 Major bridge
82 569.050 36.98 24.02 Km 569.062 Patan Chowkdi
Page A - 4
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.

83 569.100 36.98 24.02 Km 569.080 APMC Gate


84 569.150 36.98 24.02
85 569.200 36.98 24.02
86 569.250 36.98 24.02
87 569.300 36.98 24.02 End of Proposed Pier
88 569.350 36.98 24.02
89 569.400 36.98 24.02
90 569.450 36.98 24.02
91 569.500 36.98 24.02
92 569.550 36.98 24.02
93 569.600 36.98 24.02 End of Proposed Approach
94 569.650 36.98 24.02
95 569.700 36.98 24.02
96 569.750 36.98 24.02
97 569.800 36.98 24.02
98 569.850 36.98 24.02
99 569.900 36.98 24.02
100 569.950 36.98 24.02
101 570.000 36.98 24.02

Note: - Width of existing ROW as per Strip Maps of NH-27

3. Carriageway

The present carriageway of the Project Highway is 4 lane divided carriageway.

4. Major Bridges

The Site includes the following Major Bridges:

S. Chainage Bridge Type of Structure No. of Width


No. (km) on River Foundation Sub- Super Spans (m)
structure structure with Span
Length
(m)
1 568.890 to Nalla Open Wall Type Solid Slab 17X6.1 11.0
568.995 Pier

Page A - 5
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.

5. Railway Over Bridges (ROB) / Road Under Bridge (RUB)

The Site includes the following ROB/RUB:

S. Chainage Type of Structure No. of Spans Width ROB/


No. (km) Foundation Sub-structure with Span (m) RUB
Length (m)
Nil

6. Grade Separated Structures

The Site includes the following Grade Separators:

S. Chainage Type of Structure No. of Spans with Width


No. (km) Foundation Sub-structure Span Length (m) (m)
Nil
7. Minor Bridges

The Site includes the following Minor Bridges:

S. Chainage Bridge on Type of Structure No. of Spans Width


No. (km) River Foundation Sub- Super- with Span (m)
structure structure Length (m)
1 568.470 Nalla Open Wall Type Solid Slab 4X5.2 11.0

8. Railway Level Crossings:

The Site includes the following railway level crossings:

S. No. Location (km) Remarks


Nil

9. Culverts:

The site has the following culverts:

S. No. Chainage on NH-27 Types of Culvert (Pipe, Width / Dia of


Slab, Box, Arch) structure
1 566.360 Slab 1 x 3.0 x 3.5
m
2 567.969 Slab 1 x 2.0 x 1.4
m
3 567.327 Box 1 x 2 x 1.4
m
4 568.595 Pipe 3 x 0.90 m
5 569.109 Box 1x1m
Page A - 6
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.

10. Bus Bays:

The details of bus bays on the site are as follows:

S. Chainage (m) Length (m) Left Hand Side Right Hand


No. Side
1. 568.785 165 m Nil RHS

11. Truck Lay Byes:

The details of truck lay byes on the site are as follows:

S. Chainage (m) Length (m) Left Hand Side Right Hand


No. Side
Nil

12. Road Side Drains:

The details of road side drains are as follows:

S. Location Type
No. From (km) To (km) Masonry CC (Pucca) Earthen
(Kutcha)
1. 565.300 568.450 RCC drain (1.35X1.0m) with
cover (both sides)

13. Major Junctions:

The details of major junctions are as follows:

S. Chainage on NH-27 Side Type


No.
1 566.585 Right 3 legged Junction
2 566.985 Both side 4 legged Junction
3 567.670 Both side 4 legged Junction
4 569.062 Right 3 legged Junction

Page A - 7
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.

14. Minor Junctions:

The details of minor junctions on NH - 27 are as follows:

S.No. Existing Side Type of Junction


Chainage (Left / Right)
(km)
1 566.740 Left 3 legged Junction

15. Bypasses:

The details of bypasses are as follows:

S. Name of bypass Chainage Length Carriageway


No. (town) (km) (km) Width (m) Type
NIL

16. Details of any other structures:

The details of other structures are as follows:

S. Chainage (km) Type of No. of Spans with Width (m)


No. Structure Span Length (m)
Nil

17. Service Roads:

The following service roads are present in the project corridor:

S. Existing Chainage RHS/LH Average width Desig Remark


No. (km) S (m) n s
or Both Lengt
From To RHS LHS
Sides h
(Km)
1 565.600 568.300 RHS 7.00 2.7
2 565.600 568.350 LHS 7.00 2.75
3 573.367 569.009 LHS 7.00 4.35
4 573.361 569.076 RHS 7.00 4.28

Page A - 8
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.

Annex II
(Schedule-A)
Dates for Providing Right of Way

ROW for complete section of proposed work shall be available as on appointed date.

Page A - 9
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.

Annex – III
(Schedule-A)

Alignment Plans

The existing horizontal alignment of Elevated Corridor shall be generally same as of the Project
Highway except Major Bridge at Km 569+950.

Vertical profile shall be designed by the contractor as per project requirement of single pier having
maximum width of 4.5 meter over which 20.2 meter deck slab width. Minimum height between top of
existing main carriageway and bottom of pier cap should be kept 5.5 meter.

Page A - 10
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.

Annex – IV
(Schedule-A)

Clearances

The following clearances have been obtained or awaited:

Sl.
Clearances Present Status
No.
Not Required (as per Ministry of Environment and Forests
Environment
1 Notification – 2006 and its frequent amendments dated 22 nd
Clearances
August, 2013)
2 Forest Clearance Not Required since no Forest Land involved

Page A - 11
Construction of Elevated Corridor in Deesa on NH-27 (Km 565+850 to Km 569+600)
Dist: Banaskantha, Gujarat.

Appendix A-I
Index Map of the Project attached.

Page A - 12