Sunteți pe pagina 1din 3

METHOD STATEMENT AND PROCEDURE FO

ITEM NO

3
7
14
16
2
6
10
4
8
12
11
13

5
9
15
METHOD STATEMENT AND PROCEDURE FOR E&I CONST

DESCRIPTION OF PROCEDURE

Method Statement for Constuction of communication duck bank and Cable Pulling / Laying for communication
Method Statement for Field Instrument Installation
Menthod Statement for communication Equipment installation ( LAN, VOICE , data )
Menthod Statement for Paging and Siren system installation
Method Statement for Cable Pulling / Laying for Power, Control and Instrument Cables
Method Statement for Electrical & Instrument Junction  Box Installation
Method Statement for cable gland installation
Method Statement for Cable Tray Installation
Method Statement for Grounding installation above ground & underground
Method Statement for MCC, MV and LV switchgear, UPS , DC system Installation
Method Statement For Splicing (Jointing) and Termination of Medium Voltage Cables
Method Statement for Prcocess Control System Installation
Method Statement for Electrical ( transformer, power panel, lighting, etc) and Instrument ( FACP, HVAC DDC ,
Equipment Installation
Method Statement for Electrical & Instrument above Ground /under ground RGS Conduit Installation
Method Statement for splicing & termination of low voltage cable (up to 1KV)
Menthod Statement for TETRA system installation
STRUCTION ACTIVITY

ASSIGNED TO TARGET DATE OF SUBMISSION

Abdullah Al-Obaidan 12-Sep-20


Abdullah Al-Obaidan 15-Sep-20
Abdullah Al-Obaidan 19-Sep-20
Abdullah Al-Obaidan 22-Sep-20
Afzal Asif 12-Sep-20
Afzal Asif 15-Sep-20
Afzal Asif 19-Sep-20
Afzal Khan 12-Sep-20
Afzal Khan 15-Sep-20
Afzal Khan 19-Sep-20
Afzal Khan 22-Sep-20
Muhammad Usman 19-Sep-20

Sachin Francis 12-Sep-20

Sachin Francis 15-Sep-20


Sachin Francis 19-Sep-20
Sachin Francis 22-Sep-20