I. BACKROUND INFORMATION
Specifications:
1.1 Landfill area with clay liner at least 75 cm thick with a permeability not more than
1x10-7cm/sec or a composite liner consisting of at least 1.5cm thick High Density
Polyethylene (HDPE) membrane over at least 60 cm thickness of compacted clay
materials with permeability not more than 1x10-6 cm/sec as prescribed by DENR
Administrative Order No. 10 Series of 2006 for Final Disposal Category 3
1.2 Leachate Holding Pond with geomembrane liner of HDPE of at least 1.5mm thick with
a permeability of 1x10-14 cm/sec, underlain by a low permeability compacted soil layer
or at least 0.30 m thick as provided in the Implementing Rules and Regulations (IRR)
of RA 9003
2. Sustainable Composting Project/ Facility (15-22 cubic meters per day): Primary
Separation/Sorting Area for unloaded waste, Mixing area for raw materials, Primary
Fermenter building for composting machine, Storage Building for secondary fermentation
and Stockyard Building/Production Area
Project Status Operational
A. RECORDS COMPLIANCE
Compliance Requirement Status (Accomplishment)
Please Attached Photo documentation ( with
timestamp and Geographical Coordinates)
1. Record of weights/volumes, types and origin /source of
wastes accepted. See appendix A.1
2
B. OPERATIONS COMPLIANCE
2. Signage Installation
3
toxic hazardous waste (THW) or health care waste (HCW)
8. Does the establishment implement no open burning?
9. Is there provision for aftercare following site restoration and
closure?
10. Are waste pickers prohibited at the immediate disposal
area?
Monitoring and maintenance of SLF Supporting Facilities
1. Regular Maintenance of the access roads
b. Is there safe and adequate drinking water supply for the site
personnel?
2. Embankment/cell separation
3. Drainage Facility
4. Gas venting
5. Leachate collection
4
Prepared by: Reviewed by: