Documente Academic
Documente Profesional
Documente Cultură
2013
PACiS and MiCOM Product
BCU-C264 PACiS OI
MICOM-Relay
Meters
C264 80TE
Schneider Electric - Energy Automation - 13/7/2010 4
• MiCOM C264 Front Face-Overview
Large graphic Display control
Pre-affected LED
Navigation
keys
Local/Remote
command
Settable LED
LEFT/RIGHT ENTER
switch panels
PAGE
UP/DOWN
scroll Lists
LOCAL/
REMOTE
Events
panel
Input/Output
panel
Disturbance
Schneider Electric - Energy Automation - 13/7/2010 Record panel 8
• LCD Bay Panels
On Bay Panel, Operator can :
Access other bay panels by pressing on G
or G
INITIALISATION
Major hardware
Tests OK and no Tests OK and at failure or
DB available least 1 DB incoherent DB
available structure
Operator Major
hardware
failure
TEST
Major software failure
When ?
At start-up of the computer
in runtime computer
PACiS SMT
MiCOM C264Computer
SBUS
Download into Stand-by database
Synchronises
through SBUS
SBUS
SNTP
Synchronisation SERVER
signal
PRIORITY 1 Synchronizes
LBUS
through LBUS
Synchronisation Protections
IED
signal from SCADA
PRIORITY 2
Each device can receive IRIG-B
Schneider Electric - Energy Automation - 13/7/2010 18
• SBUS – IEC61850 Agency
Agency = software module giving SBUS Clients and SBUS
Server services
SBUS IEC61850