Sunteți pe pagina 1din 20

Operation and Instruction Manual

2013
PACiS and MiCOM Product
BCU-C264 PACiS OI

C264 40TE C264 80TE

MICOM-Relay

Meters

Px4x Series EDMI MK6e

Schneider Electric - Energy Automation - 13/7/2010 2


C264-BCU

C264 80TE
Schneider Electric - Energy Automation - 13/7/2010 4
• MiCOM C264 Front Face-Overview
Large graphic Display control

Large illuminated display

Pre-affected LED

Navigation
keys

Local/Remote
command
Settable LED

Operating keys Open/Close command

Schneider Electric - Energy Automation - 13/7/2010 5


• LED+Control part Overview
FRONT FACE
C264C 40TE C264M 80TE
(4U-170mm) (4U-170mm)

4/5 System LED


Local Control Panel
12/13 Configurable LED Liquid Crystal Display
12 Push Buttons

Schneider Electric - Energy Automation - 13/7/2010 6


• System LED Overview
FAULTY OFF No fault
ON DB error, Hardware error
LED 0 FLASHING Slow Not used
FLASHING Fast ISaGRAF Fault (cycle too long,Queue overflow, POU faulty

ALARM OFF No Alarm


ON Alarm acknowledged
LED 1 FLASHING Slow Alarm inactive acknowledged
FLASHING Fast At least one alarm not acknowledged

MODE OFF Reboot


ON Operational mode
FLASHING Slow Maintenance mode
LED 2 FLASHING Fast Test mode

POWER OFF power off


ON power on
FLASHING Slow Not used
LED 3 FLASHING Fast Not used

LOCAL/REMOTEOFF All bays are in remote mode


simple HMI ON All bays are in local mode
only FLASHING Slow At least one bay in local mode
LED 4 FLASHING Fast Not used
Schneider Electric - Energy Automation - 13/7/2010 7
• Front Face Buttons
SERVICE
CLEAR/ PAGE
CANCEL

LEFT/RIGHT ENTER
switch panels
PAGE

UP/DOWN
scroll Lists

LOCAL/
REMOTE

SELECTION OPEN/OFF CLOSE/ON

Schneider Electric - Energy Automation - 13/7/2010 8


• LCD Panels Arrangement
Bay panels
BAY_01 Alarms
Measurements panel

Events
panel

Input/Output
panel

Menu Fault panel


Tree
Panel
Services panels :
General Info

Disturbance
Schneider Electric - Energy Automation - 13/7/2010 Record panel 8
• LCD Bay Panels
On Bay Panel, Operator can :
 Access other bay panels by pressing on G
or G

 Select devices for command by pressing on


 Control switching devices :
 Put in “ON” or “CLOSED” by pressing on I

 Put in “OFF” or “OPEN” by pressing on O

 Then for execution (SBO case)

Schneider Electric - Energy Automation - 13/7/2010 10


• LCD Service Panel
General Services :
 MAC @
 Software version
 Database version
 Operating Mode
 ...

Schneider Electric - Energy Automation - 13/7/2010 11


• LCD Other Panels
Other Panels :
 INPUT/OUPUT
Is showing every I/O board channel status

Schneider Electric - Energy Automation - 13/7/2010 12


• LCD Fault Panels
Fault type display
Is showing DISCONN if an IED is not connected
Is showing HARDWARE if an hardware problem (boards, …) occurs

Schneider Electric - Energy Automation - 13/7/2010 13


• Operating Mode Management
Transitions Diagram
Power up / Reboot Automatic Reboot

INITIALISATION
Major hardware
Tests OK and no Tests OK and at failure or
DB available least 1 DB incoherent DB
available structure

MAINTENANCE OPERATIONAL FAULTY

Operator Major
hardware
failure

TEST
Major software failure

HALT After N reboots in M hours


Schneider Electric - Energy Automation - 13/7/2010 14
• Computer Self Checks

Kinds of self checks :


 Hardware (hardware fault)
 Software (software fault)
 Database coherency
 Acquisition and outputs

When ?
 At start-up of the computer
 in runtime computer

Schneider Electric - Energy Automation - 13/7/2010 15


17
• Database Management

PACiS SMT

MiCOM C264Computer

DB1 Current Database


DB2
Stand-By Database

SBUS
Download into Stand-by database

Schneider Electric - Energy Automation - 13/7/2010 16


18
• Time Management

Why needs of time synchronisation?


To “have the same date / time on all connected devices” for :
 the time tagging of events
 the synchronised reports
 the synchronised actions

Time resolution 1ms

Accuracy [-1 ms,+1ms ]

Schneider Electric - Energy Automation - 13/7/2010 17


19
• Time Management
PRIORITY 3 PACiS OI
Operator
Synchronisation
PACiS
GPS Clock Gateway

Synchronises
through SBUS
SBUS
SNTP
Synchronisation SERVER
signal
PRIORITY 1 Synchronizes
LBUS
through LBUS

Synchronisation Protections
IED
signal from SCADA
PRIORITY 2
Each device can receive IRIG-B
Schneider Electric - Energy Automation - 13/7/2010 18
• SBUS – IEC61850 Agency
Agency = software module giving SBUS Clients and SBUS
Server services

MiCOM C264 PACiS GTW

MiCOM C264 PACiS GTW


Applicative Applicative

SBUS Agency SBUS Agency

SBUS IEC61850

SBUS Agency SBUS IED SBUS Agency

PACiS OI no agency PACiS SMT


Applicative Applicative
PACiS OI PACiS S

Schneider Electric - Energy Automation - 13/7/2010 19


Thanks for your attention

Schneider Electric - Energy Automation - 13/7/2010 41

S-ar putea să vă placă și