PORTS DESCRIPTION WITH LPG TERMINALS LPG

LINE SYSTEM
PORT OPERATION REDUCERS CONDITIONS REMARKS
SIDE
8” X 300
System – I,2 Three compressors units in operation. Hot gas
STS LOADING 8” X 300
PORT to be provided from Mother vessel.
6″ X 300
System - 1 PORT Average discharging rate is 850 mt/h. Hot gas
DAHEJ, INDIA DISCHARGING 10” X 150
SIDE to be provided by vessel.
Average discharging rate is 300 mt/h. Hot gas
System - 2 STBD
QASIM, PAKISTAN DISCHARGING 8″ X 300 to be provided by vessel. Using 2 pumps,
SIDE
booster pump, heater.
System - 2 STBD
Average discharging rate is 460 mt/h. Hot gas
MUMBAI, INDIA DISCHARGING SIDE/ 10″ X 300
to be provided by vessel. Using 4 pumps.
PORT SIDE
System – 2 STBD
SIDE
JNPT, INDIA DISCHARGING 8" X 300
System – 1(?)
PORT SIDE
Discharging rate is 250 mt/h, Disch press
NEW MANGALORE, System - 1 STBD
DISCHARGING 6” X 300 max 10 Bar, tempr 5°C. Hot gas to be
INDIA,BERTH 12 SIDE
provided by vessel.
PORTBANDAR, System - 1 PORT
DISCHARGING 8″ X 300 Using 2 pumps, booster pump, heater.
INDIA SIDE
TUTICORIN, INDIA System - 2 PORT
DISCHARGING 8″ X 300
ARM SIDE
TUTICORIN, INDIA System - 1 PORT
DISCHARGING 8″ X 300
HOSE SIDE
KARLSHAMN-SWEDEN. LINE-2. Rate 180 mt/h, tempr -34.Max Press 0.6 bar
LOADING 8” X 300 ASA.
HOSE WITH CRANE. STDD-SIDE. Blowing 30min 1 compressor.
LINE-1.
Rate 480mt/h.
MELLITAH. PORT-SIDE. 10” X 300 ASA Pr Rate 480 mt/h,tempr -38,Max Pressure 0.2
LOADING. Temp.-38
ARM-Prop.C3. LINE-1. 10’’ X 150 ASABut. bar. Blowing. 40-min. 2-Compr.
Max.Pressure.0.2br.
STBD-SIDE.
Rate 220mt/h.
BRINDIZI. LINE-2.
DISCHARGING. 8” X 300 ASA. Temp.+2. Blowing. 2-Hours. 2-Compr.
ARM-Prop.C3. PORT-SIDE.
Max.Pressure.10-12br.
Rate 400mt/h.
VLORE-ALBANIA. LINE-1. 8” X 300 ASA. LIQ
DISCHARGING Temp.-7. Blowing. 2-hours. 2-Compr.
ARM-Prop.C3. PORT-SIDE. 4” X 300 ASA VAP
Max.Pressure. 13br.
STENUNGSUND- LOADING. LINE-1. 10” X 300 ASA. Rate. 500mt/h. Blowing. 20-30 min.1-Compr.
SWEDEN. STBD-SIDE. Temp.-38.
ARM-Prop.C3. Max.Pressure. 0.5br.
ARZEW-ALGERIA. LINE-2.
Rate. 750mt/h.
ARM-Prop.C3. PORT-SIDE
LOADING. 12” X 150 ASA. Temp. -43. Blowing 30-min. 1-Compr.
TERMINAL-S1. LINE-1
Max.Pressure. 0.9br.
TERMINAL-S2 PORT-SIDE
Rate. 230mt/h. Using 1-booster pump.
NAPOLI-ITALIA. LINE-2.
DISCHARGING. 8” X 300 ASA. Temp. +3. Blowing 1-hours. 2-Compr.
ARM-Prop.C3. PORT-SIDE.
Max.Pressure. 10-12br. 1-Compr on 50%. 2nd-Compr on 100%.
Rate. 140 mt/h.
Temp.No Less +1.
RAVENA-ITALIA. LINE-2.
DISCHARGING. 8” X 300 ASA. Max.Pressure. 15br. Blowing 1-Hours. 2-Compr.
ARM-Prop.C3. PORT-SIDE.
Ave.Pressure. 13br.

Rate. 280mt/h.
Temp. -25.
LIVORNO-ITALIA. LINE-1. Blowing 40-min. 2-Compr.
DISCHARGING. 8” X 300 ASA. Max.Pressure. 13br.
ARM-Prop.C3. PORT-SIDE. Using 2-booster pumps
Ave.Pressure. 11.5br.

LINE-1.2.
STS-GAZ SUPPLIER. LOADING. 8” X 300 ASA. Blowing 10-15min.
PORT-SIDE.
LINE-1.LIQU. Rate. 800-1000 mt/h.
ARZEW-ALGERIA. 12” X 150 ASA.
LINE-2.VAPO. Temp. -38.
ARM-Prop.C3. LOADING. 12” X 150 ASA.
LINE-2.LIQU. Max.Pressure. 0.5-1.0 Without blowing.
TERMINAL-D1. 12” X 150 ASA.
PORT-SIDE. br.
LOADING- LINE-2.
STS-GAZ-IMPERIAL 8” X 300 ASA Blowing 10-15min.
DISCHARGING. PORT-SIDE.
Rate. 1000 mt/h.
BRAEFOOT BAY. UK. LINE-1.LIQU.
12” X 300 ASA. Temp. -39.5 Blowing 5-10 min. from terminal to Tank N.2l
TERMINAL-SHELL. LOADING. LINE-1.VAPO.
12” X 300 ASA. Max.Pressure. 0.5-2.5 only ARM whith Nitrogen.
ARM-Prop.C-3. PORT-SIDE.
br.
Rate 350 mt/h.
LINE- Temp. +4.
LAVERA-GEOGAZ. DISCHARGING. 10” X 300 ASA. No Blowing.
PORT-SIDE. Max.Pressure. 19.5 br.
Ave.Pressure. 8.5br.
Rate 340 mt/h.
LINE- Temp. +5.
LAVERA-PRIMAGAZ. DISCHARGING. 10” X 300 ASA. No Blowing.
PORT-SIDE. Max.Pressure. 19.5 br.
Ave.Pressure. 4.5br.
LINE-
LAVERA-PIER”G”. DISCHARGING. 10” X 300 ASA.
STBD-SIDE.
Rate 500 mt/h.
STS-GAZ-LIBERTY DISCHARGING. LINE-PORT SIDE. 8” X 300 ASA. Blowing 2 Compresors, 15 min
Temp. -41.

KAARSTOE, LINE-1
LOADING 12’’ X 150 ASA
NORWAY STBD-SIDE
Rate 150 mt/hr
ALEXANDRIA, LINE-2, Using 2 D.W., 1-booster pump, & Heater
DISCHARGING 8’’ X 300 ASA Tempr. 10-15°C
EGYPT PORT SIDE Blowing 2 Compr 30 min
Press max 10 Bar
LEBANON LINE-2. LIQU 8” X 300 ASA. Tempr.7-8 °C
DISCHARGING Blowing . from terminal only ARM
BEIRUT LINE.2VAPOR 6” X 150 ASA. Press max 10
RATE 300 MT/HR
DORTIOL LINE-2 LIQU LINE 8” X 300 ASA. MIXING IN CROSSOVER, 2 DEEPWELLS, 2
DISCHARGING Tempr.+4,-4 °C
TURKIE 2 BOOSTERS, HEATER, NO BLOW
Press max 12 BAR
MAX Rate 300 mt/h
ALANIA MIXING, 2 DEEPWELLS, 1 BOOSTER, HEATER,
DISCHARGING LINE-2 LIQ.LINE 8” X 300 T: +10/+40
TURKIE NO BLOW
P max: 11 bar
MAX Rate 350 mt/h
DORTIOL MIXING, 3 DEEPWELLS, 2 BOOSTER, HEATER,
DISCHARGING LINE-2 LIQ.LINE 8” X 300 T: -5/+5
TURKIE NO BLOW
P max: 12 bar
ZUETINA
LOADING LINE-1 LIQ.LINE 6” X 300 MAX rate 350 mt/h No blowing, drain 2h
LIBYA