Sunteți pe pagina 1din 1

0.

60
10 MM Ø GRAB
0.50 4'' THK. CHB
HANDLE
0.40
OUTLET INLET
INLET 0.40 0.60
0.60
6'' Ø PVC PIPE
OUTLET
6'' Ø PVC PIPE
PLAN
3-10 MM Ø TEMP. BAR
DETAIL OF CATCH BASIN
SCALE 1: 10 MTS. 12mm Ǿ GRAB HANDLE
MH CO MH CO
0.10
AIR SPACE
0.30
3.00 SCUM LEVEL
2.00 1.00 6'' THK CHB
12mm Ǿ VERT. BAR SPACED
4'' THK. PVC
AT .60M W/ 10mm Ǿ HOR.
SPACED AT EVERY 3 LAYER
OF CHB.
1.80 LEACHING
DIGESTIVE CHAMBER WELL
1.50 0.40 3-12 mm Ǿ BASE W/ 10mm Ǿ
SPACED AT .20M
MH MH
FINE
2.60 GRAVEL
12 MM Ø TEMP BARS
SPACED AT .15M. BOTHWAY 0.40 0.40 0.40
10MMØ TEMP. BARS
PLAN SPACED @ .13
M.O.C. B.W.
DETAIL OF SEPTIC TANK
SCALE 1: 40 MTS.
GENERAL PLUMBING NOTES:
1. ALL PLUMBING WORKS HEREIN SHALL BE EXECTUED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL PLUMBING CODE AND THE RULES AND REGULATION OF THE LOCAL MUNICIPAL/CITY
ORDINANCE.
2. COORDINATE SANITARY AND WATER LAYOUT WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS BEFORE PROCEEDING WITH THE WORK. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY
DISCREPANCY FOUND THEREIN.
3. PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION REQUIRED FOR PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE ENGINEER AND/OR OWNER CONCERNED.
4. SANITARY AND DRAINAGE LINES SHALL HAVE A MINIMUM SLOPE OF (1%).
5. ALL INDIVIDUAL BRANCHES SHALL BE VENTED UNLESS OTHERWISE NOTED.
6. DIMENSIONS ARE IN MILLIMETER (MM) UNLESS OTHERWISE INDICATED.
7. SIZES OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE APPROVED PLANS.
8. ALL EXISTING UTILITIES AT SITE SHALL E VERIFIED AND COORDINATED THE WORKS WITH SEWER EFFLUENT DISPOSAL AND WATERLINE SERVICES CONNECTING POINT.
9. THE WORK THROUGHOUT SHALL BE EXECUTED IN THE BEST AND MOST THOROUGH MANNER KNOWN TO SATISFACTION OF THE ENGINEER.
10. PIPES FOR ALL WATER LINES SHALL BE AS OF THE BRAND APPROVED BY THE ENGINEER AND/OR OWNER CONCERNED AND SHALL BE TESTED AT 150PSI FOR A PERIOD OF TWO(2) HOURS BEFORE
BACKFILLING OR COVERING.
800
11. PIPES FOR SANITARY LINES SHALL BE "PVC" PIPES SERIES 1000 (HIGH IMPACT). HOWEVER, USEreD SERIES 600 IF SERIES 1000 ARE NOT AVAILABLE.
12. PIPES FOR AIR VENTILATION LINES SHALL BE "PVC" PIPES SERIES 600. AIR VENTILATION LINES SHALL BE ROUGHING-IN INSIDE THE "CHB" WALL AND GOES ABOVE THE REST ROOM CEILING TOWARD THE
CENTER OF THE STEEL LOUVER, WITH COWL AT THE END.
13. GRADES OF HORIZONTAL PIPING: RUN ALL HORIZONTAL PIPINGS IN PERFECT ALIGNMENT AND AT A FORM GRADE OF NOT LESS THAT 2%.
14. CHANGE IN DIRECTION: ALL CHANGE IN DIRECTION SHALL BE MADE BY THE SIXTEENTH BENDS. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL, A SINGLE 81 BEND COMBINATION MAYBE
USED ON VERTICAL STACKS AND SHORT QUARTER BEND MAYBE USED ON WATER LINE, TEE AND CROSSES MAYBE USED IN VENT PIPES.
15. PROHIBITED FITTING: NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL OR PIPES AND USE OF SADDLE HUB AND BEND ARE PROHIBITED.
16. PIPE CLEAN OUT: CLEAN OUTS ARE REQUIRED FOR THE FOLLOWING CONDITION EVERY CHANGE IN HORIZONTAL DIRECTION TWENTY TWO AND ONE HALF DEGREES [22 21 ]
A.ONE AND HALF METER (1.5M) INSIDE THE PROPERTY LINE BEFORE
B.EVERY 15M. IN HORIZONTAL RUN OF PIPES.
C.PIT THE END OF ANY HORIZONTAL PIPE LINE.
SCHOOL : NAME: PROJECT TITLE : INSTRUCTOR: SHEET NO.
JS CAGAYAN STATE UNIVERSITY Jesser Ramses A. Soller SEPTIC TANK PLAN AND SECTION DETAILS ENGR. JOWELL JOHN TALOSIG 1
1
CARIG SUR, TUGUEGARAO CITY BS CIVIL ENGINEERING IV THREE-STOREY RESIDENTIAL BUILDING PICE

S-ar putea să vă placă și