6 Foundation loads
6.1 Foundation loads for the outrigger crane with climbing equipment
Parameters
Out of service -1122.9 71.3 605.5 0.0
Technical
In service 1988.6 19.6 801.0 347.9
4 21.0
Out of service -1128.1 76.9 622.2 0.0
In service 2063.5 20.8 817.6 347.9
5 24.0
Out of service -1134.2 82.5 638.9 0.0
In service 2145.2 22.1 834.3 347.9
6 27.0
Out of service -1141.4 88.1 655.5 0.0
In service 2234.0 23.4 850.9 347.9
7 30.0
Out of service -1149.7 93.7 672.2 0.0
In service 2330.1 24.7 867.6 347.9
8 33.0
Out of service -1159.1 99.3 688.8 0.0
In service 2434.2 25.9 884.3 347.9
9 36.0
Out of service 1425.7 104.9 705.5 0.0
In service 2546.5 27.2 900.9 347.9
10 39.0
Out of service 1764.5 110.5 722.2 0.0
In service 2667.7 28.5 917.6 347.9
11 42.0
Out of service 2125.5 116.1 738.8 0.0
In service 2798.5 29.7 934.2 347.9
12 45.0
Out of service 2509.9 121.6 755.5 0.0
In service 2939.5 31.0 950.9 347.9
13 48.0
Out of service 2918.9 127.2 772.1 0.0
In service 3091.5 32.3 967.6 347.9
14 51.0
Out of service 3353.9 132.8 788.8 0.0
In service 3255.5 33.5 984.2 347.9
15 54.0
Out of service 3816.6 138.4 805.5 0.0
In service 3432.7 34.8 1000.9 347.9
16 57.0
Out of service 4308.7 144.0 822.1 0.0
In service 3624.3 36.1 1017.5 347.9
17 60.0
Out of service 4832.6 149.6 838.8 0.0
Parameters
Out of service -1304.5 71.3 579.4 0.0
Technical
In service 2027.8 19.6 772.2 266.9
4 21.0
Out of service -1310.2 76.9 596.0 0.0
In service 2102.5 20.9 788.8 266.9
5 24.0
Out of service -1317.1 82.5 612.7 0.0
In service 2183.9 22.1 805.5 266.9
6 27.0
Out of service -1325.0 88.1 629.4 0.0
In service 2272.3 23.4 822.2 266.9
7 30.0
Out of service -1334.2 93.7 646.0 0.0
In service 2368.0 24.7 838.8 266.9
8 33.0
Out of service -1344.7 99.3 662.7 0.0
In service 2471.4 25.9 855.5 266.9
9 36.0
Out of service -1356.5 104.9 679.3 0.0
In service 2583.0 27.2 872.1 266.9
10 39.0
Out of service 1571.5 110.5 696.0 0.0
In service 2703.4 28.5 888.8 266.9
11 42.0
Out of service 1929.5 116.1 712.7 0.0
In service 2833.1 29.7 905.5 266.9
12 45.0
Out of service 2310.4 121.6 729.3 0.0
In service 2972.8 31.0 922.1 266.9
13 48.0
Out of service 2715.2 127.2 746.0 0.0
In service 3123.3 32.3 938.8 266.9
14 51.0
Out of service 3145.3 132.8 762.6 0.0
In service 3285.5 33.6 955.4 266.9
15 54.0
Out of service 3602.3 138.4 779.3 0.0
In service 3460.5 34.8 972.1 266.9
16 57.0
Out of service 4087.9 144.0 796.0 0.0
In service 3649.5 36.1 988.8 266.9
17 60.0
Out of service 4604.1 149.6 812.6 0.0
Parameters
Technical
Out of service -1270.0 71.3 520.7 0.0
In service 2135.6 19.6 707.6 204.1
4 21.0
Out of service -1275.0 76.9 537.3 0.0
In service 2210.0 20.9 724.3 204.1
5 24.0
Out of service -1280.9 82.5 554.0 0.0
In service 2290.8 22.2 740.9 204.1
6 27.0
Out of service -1287.9 88.1 570.7 0.0
In service 2378.5 23.5 757.6 204.1
7 30.0
Out of service -1295.9 93.7 587.3 0.0
In service 2473.3 24.7 774.3 204.1
8 33.0
Out of service -1305.0 99.3 604.0 0.0
In service 2575.6 26.0 790.9 204.1
9 36.0
Out of service -1315.4 104.9 620.6 0.0
In service 2685.8 27.3 807.6 204.1
10 39.0
Out of service 1603.6 110.5 637.3 0.0
In service 2804.5 28.5 824.2 204.1
11 42.0
Out of service 1960.0 116.1 654.0 0.0
In service 2932.1 29.8 840.9 204.1
12 45.0
Out of service 2338.7 121.6 670.6 0.0
In service 3069.3 31.1 857.6 204.1
13 48.0
Out of service 2740.6 127.2 687.3 0.0
In service 3216.8 32.3 874.2 204.1
14 51.0
Out of service 3167.0 132.8 703.9 0.0
In service 3375.4 33.6 890.9 204.1
15 54.0
Out of service 3619.2 138.4 720.6 0.0
In service 3545.9 34.9 907.5 204.1
16 57.0
Out of service 4098.8 144.0 737.3 0.0
In service 3729.6 36.2 924.2 204.1
17 60.0
Out of service 4607.4 149.6 753.9 0.0
Parameters
Out of service -1294.3 71.3 468.2 0.0
Technical
In service 2076.0 19.6 649.9 127.1
4 21.0
Out of service -1298.8 76.9 484.9 0.0
In service 2148.8 20.9 666.6 127.1
5 24.0
Out of service -1304.3 82.5 501.5 0.0
In service 2227.9 22.2 683.2 127.1
6 27.0
Out of service -1310.6 88.1 518.2 0.0
In service 2313.4 23.4 699.9 127.1
7 30.0
Out of service -1318.0 93.7 534.9 0.0
In service 2405.7 24.7 716.5 127.1
8 33.0
Out of service -1326.3 99.3 551.5 0.0
In service 2505.2 26.0 733.2 127.1
9 36.0
Out of service -1335.8 104.9 568.2 0.0
In service 2612.1 27.3 749.9 127.1
10 39.0
Out of service 1574.6 110.5 584.8 0.0
In service 2727.0 28.5 766.5 127.1
11 42.0
Out of service 1929.1 116.1 601.5 0.0
In service 2850.2 29.8 783.2 127.1
12 45.0
Out of service 2305.2 121.6 618.2 0.0
In service 2982.4 31.1 799.8 127.1
13 48.0
Out of service 2703.9 127.2 634.8 0.0
In service 3124.1 32.3 816.5 127.1
14 51.0
Out of service 3126.2 132.8 651.5 0.0
In service 3276.1 33.6 833.2 127.1
15 54.0
Out of service 3573.4 138.4 668.1 0.0
In service 3439.2 34.9 849.8 127.1
16 57.0
Out of service 4046.8 144.0 684.8 0.0
In service 3614.2 36.1 866.5 127.1
17 60.0
Out of service 4547.8 149.6 701.5 0.0
6.2 Corner pressure for the chassis crane with climbing equipment
A B
D C
A B
D C
Technical Parameters
In service 370.2 639.1 535.1 266.1 452.6 684.0 452.6 221.2 684.0
2 15.5
Out of service 486.1 330.2 330.2 486.1 408.2 298.0 408.2 518.4 518.4
In service 381.9 652.2 531.7 261.4 456.8 696.9 456.8 216.7 696.9
3 18.5
Out of service 490.6 334.1 334.1 490.6 412.3 301.7 412.3 523.0 523.0
In service 393.9 665.7 528.1 256.2 461.0 710.4 461.0 211.5 710.4
4 21.5
Out of service 495.1 337.9 337.9 495.1 416.5 305.4 416.5 527.6 527.6
In service 406.0 679.8 524.2 250.5 465.1 724.8 465.1 205.5 724.8
5 24.5
Out of service 499.7 341.7 341.7 499.7 420.7 308.9 420.7 532.4 532.4
In service 418.4 694.4 520.2 244.2 469.3 739.9 469.3 198.7 739.9
6 27.5
Out of service 504.3 345.3 345.3 504.3 424.8 312.4 424.8 537.2 537.2
In service 431.1 709.6 515.9 237.3 473.5 755.9 473.5 191.1 755.9
7 30.5
Out of service 509.0 348.9 348.9 509.0 429.0 607.1 429.0 250.9 607.1
In service 444.0 725.5 511.3 229.8 477.6 772.7 477.6 182.6 772.7
8 33.5
Out of service 297.7 568.7 568.7 297.7 433.2 649.8 433.2 216.6 649.8
In service 457.2 742.0 506.4 221.6 481.8 790.5 481.8 173.1 790.5
9 36.5
Out of service 276.0 598.6 598.6 276.0 437.3 694.8 437.3 179.8 694.8
In service 470.7 759.2 501.2 212.7 486.0 809.2 486.0 162.7 809.2
TC6520-10E-138Y-A01
10 39.5
Out of service 252.9 630.1 630.1 252.9 441.5 742.4 441.5 140.6 742.4
In service 484.6 777.3 495.7 203.0 490.1 829.0 490.1 151.2 829.0
11 42.5
Out of service 228.2 663.1 663.1 228.2 445.7 792.6 445.7 98.7 792.6
Tower Crane
In service 498.8 796.2 489.8 192.4 494.3 850.0 494.3 138.6 850.0
12 45.5
Out of service 201.8 697.9 697.9 201.8 449.8 845.6 449.8 54.0 845.6
In service 513.5 816.0 483.4 180.9 498.5 872.1 498.5 124.8 872.1
13 48.5
Out of service 173.7 734.3 734.3 173.7 454.0 901.5 454.0 6.5 901.5
塔式起重机操作手册
Operation Manual
2-41
Technical
Parameters
Technical
Parameters
2-42
Case 1(kN) Case 2(kN)
Number of section Hook height (m) Operation status Max reaction (kN)
RA RB RC RD RA RB RC RD
In service 528.5 836.8 476.7 168.5 502.6 895.6 502.6 109.7 895.6
14 51.5
Out of service 143.7 772.6 772.6 143.7 458.1 960.4 458.1 -44.2 960.4
In service 544.1 858.7 469.5 154.9 506.8 920.4 506.8 93.1 920.4
15 54.5
Out of service 111.7 812.9 812.9 111.7 462.3 1022.7 462.3 -98.0 1022.7
In service 560.2 881.8 461.7 140.1 510.9 946.9 510.9 75.0 946.9
16 57.5
Out of service 77.7 855.3 855.3 77.7 466.5 1088.4 466.5 -155.4 1088.4
In service 576.8 906.3 453.4 124.0 515.1 975.0 515.1 55.2 975.0
17 60.5
Out of service 41.4 899.9 899.9 41.4 470.6 1157.8 470.6 -216.5 1157.8
TC6520-10E-138Y-A01
Tower Crane
塔式起重机操作手册
Operation Manual
Technical Parameters
塔式起重机操作手册
Tower Crane Operation Manual
2 2 Packing list
Weight
per
No. Designation Outline L(m) B(m) H(m) Qty
L piece
B (t)
H
Section of
1
counter-jib
L 5.90 1.50 0.63 1.04 1
B
H
Section of
2 B 8.30 1.50 0.63 1.61 1
H
counter-jib
Transportation
L
3 Jib section Ⅰ 10.18 1.49 1.51 1.41 1
B
H
B
H
L
12 Jib section Ⅹ L 0.96 1.49 1.48 0.14 1
B
H
Tower head
13 7.09 1.63 1.90 1.37 1
structure
B
H
L
Slewing mast
14 2.26 1.67 1.90 1.24 1
structure
Weight per
No. Designation Outline L(m) B(m) H(m) Qty
piece (t)
H
L
H
B
16 Climbing frame 7.23 2.75 2.54 3.10 1
L
L
Transportation
17 Trolley 1.80 1.78 0.95 0.40 1
H
L
18 Hook 0.90 0.40 1.64 0.34 1
H
B
Tower section
H
L68A1 L
Tower section
L68B2(only for
H
B
for Anchored
L
Embeded)
Base section
(only for chassis
B
H
定式、行走式)
L
Weight per
No. Designation Outline L(m) B(m) H(m) Qty
piece (t)
Whole beam
H
(only for chassis
B
24 8.94 1.34 0.83 2.21 1
stationary or L
traveling))
Semi-beam B
H
(only for chassis
25 L 4.31 1.27 0.52 1.08 2
stationary or
traveling)
H
Transportation
Hoisting B
26
mechanism L 2.28 1.87 1.20 2.91 1
B
H
Trolleying
27
mechanism L 1.20 0.73 0.59 0.49 1
H
B
H
3 Counter weight
3.1 Configuration for counter weight
The ballast has two specifications,PHZ3000A and PHZ2000,both are cast with reinforced concrete.
For specific dimensions, refer to Fig. 3.2-1a、3.2-1b、3.2-2a、3.2-2b
NOTICE
In the hand book, the size of the Counter-weight is designed as the density is 2400kg/
m3 . It is permited that the direction of the thickness should be adjusted if the density is
not the same to 2400kg/m3.
We suggest weight every ballast exactly, and make the lasting sign on the surface
of them. Permitted weight deviation is 2%, concrete grade no less than C20, Stamped
concrete, the curing period of the counter-weight must not be less than 15 days after
pouring.
Prerequisite
Fig 3.2-1a
(1) PHZ3000
Prerequisite
10 Fixing plate t8 1 Q235B
11 Plate t8 2 Q235B
Fig3.2-1b
NOTICE
Fig3.2-3a
(3) PHZ2000
Prerequisite
10 Fixing plate t8 1 Q235B
11 plate t8 2 Q235B
12 1 C20
Fig3.2-2b
NOTICE
1. Welding rod : E4303(J422);
2. Weld the joint of part 1 and part 3,steel pipe and part 2,part2 and part 4, part 3 and
part 4,part 4 and part 5,firmly together.
3. First,connect the reinforcing fabric with spot welding at the contact point,and put
it into the frame(part6,7,8).Then weld the angle steel frame firmly at the connect
point. Last,connect the reinforcingfabric and the frame with welding.
4. It is necessary to keep the dimensions 300x1220mm and to keep the same level of
the concrete surface as the frame when pouring.
5. Weld the part 9 and the part 10 firmly to the frame in order to fixing the part
1 and steel pipe.Weld part 10 to part 11 firmly.
6. The concrete strength is over c20.The allowable weight variation is 2%.
7. The weight should be printed at the two side of the top of the counter-weight;
8. All parts of the drawing are provided by user.
4 Foundation drawings
4.1 The foundation drawing for the outrigger crane
NOTICE
Foundation drawing for the outrigger crane TC6520-10E is shown as Fig 4.1-1.Its
technical requirement are as follows.
(1) Excavate a trench to hard formation until the ground bearing pressure accords
with the value in the following table, and make the bottom level. And then backfill and
tamp 100mm gravel stratum. After making formwork or laying bricks for the side walls,
pour concrete into pre-made reinforced rod net. The concrete block surface should be
100mm higher than neighbouring ground for the drainage of storm water, then removal the
formwork and backfill the neighbouring ground with gravels.
(2) The depth of the concrete cover of the main reinforcement is 40mm. Fix the
embedded anchors on the locating reinforcement bar and make sure that the verticality
Prerequisite
of the embedded anchors centrelines and horizontal plane is less than 1.5/1000. Concrete
filling rate around the embedded anchors must be over 95%.
(3) The concrete strength grade shall be no less than C35. The curing duration of
concrete is more than 15 days.
(4) If it is difficult to pass through the anchor, the main reinforcing rod can be turned
aside, but must not be reduced or cut off.
(5) NO.6 which must driven 1.5m into the ground. Not connected with the steel
reinforcement of the building foundations.
(6) The NO.10 is insulated copper cable with at least 16mm.
(7) The Foundation is used for TC6520-10E tower crane whose independent height is
65m。The base load is showed in the instruction book.
Prerequisite
Fig 4.1-1a
10 Earthing Cable 1
Fig 4.1-1b
1 Concrete 4 C35
9 Earthing cable 1
Prerequisite
10 Earthing rods 1 Weldment
Fig 4.2-1b
Foundation drawing for the travelling crane TC6520-10E is shown as Fig 4.3-1.Its technical requirement
are as follows.
1. The ground foundation must be tamped solid, its bearing pressure must be larger than 0.2MPa;
2. During working, users should check the track on time : The distance error of 2 tracks is less than
±5mm;Track height error in the same section is less than 5mm; The longitudinal error of the track height is
less than 1/1000,The total height error is less than 10mm。
3. The joints of two tracks should be straggered upon 1500mm.
4. The buffer stop must be setted at the end of the track according to the specific situationof building
site, the buffer for the travel limit switch must be setted on the site shown in the drawing, travel limit test
should be done in advance to ensure its safety in the process of working.
5.Tracks should have the good ground connection .The earth resistance must be less than 4Ω.
6. The account in the specification sheet is counted base on the track which is as long as 100m.
Prerequisite
7. The degree of finish of the machining face is 50 .The degree of finish of the machining hole is 12.5 .
8. The length of cable is the distance which from the fixed point to the further track end plus 15m.
9. Setting 4 anchoring boards outside of the rail track. The boards are used for fixing the crane when the
wind speed is higher;
10.Manufacturing and locating method of the board are showed in the drawing to the drawing, the
location of the equipment based on the practical situation ,the user can also take some other effective and
safe methods to anchor;
11.The main reinforcements on the drawing are twisted steel(HRB335),the hoop reinforcements are
twisted steel(HPB235).
V
H M
h
e c
Prerequisite
L
L
Fig5.1-1 Figure of foundation loads
2(כV+G)
ıB = ıBp
3כLכc
L
c= െe
2
Where
V is the foundation vertical force,
G is the weight of foundation,
σBp is the allowable soil pressure.
Prerequisite
Fig 6-1
Prerequisite
Table 6-1 Components weight and its mounting height
Two method for the install of Embeded Support Pillars: use the allocation crib or the
base section. Allocation crib is recommend .
For the easy to construct, when the bar is baled to a given degree,4 Support Pillars should be assemblage
to the allocation crib 、the allocation crib to the section with 16φ65×164/203 pin、8 φ65×164/203 pin
and 8 4×32 cotter pin. Put the Embeded Support Pillars 、allocation crib and the section which are installed
into the bar-mat reinforcement. see Fig7.2-1.
vertical line
Prerequisite
vertical
allocation crib
earthing
Support Pillars
100
≥1500
≥500
NOTICE
(1) The allocation crib is apolegamic ,and it is suggested;elsereference paragraph
7.2.2 to install Support Pillars.
(2) The number of bar around the Support Pillars could not be reduced.
(3) When the Main reinforcement is hard to pass the Support Pillars, it is permited
that the Main reinforcement can dodge.
For the easy to construct, when the bar is baled to a given degree,4 Support Pillars should be assemblage
to the allocation crib with 8φ65×164/203 pin、4 20×183.5/24 pin and 4 4×32 cotter pin. Put the
Embeded Support Pillars and the base section which are installed into the bar-mat reinforcement. see
Fig7.2-1.
step
Prerequisite
vertical line
Section
vertical
earthing
Support Pillars
100
≥1500
≥500
NOTICE
1) If allocation crib is purchased, we should install the Embeded Support Pillars as
paragraph7.2.1。
(2) In order to that the building won’t influence the Dismantling, it is necessary to
posit the step to the proper direction.
(3)The number of bar around the Support Pillars could not be reduced.
(4) When the Main reinforcement is hard to pass the Support Pillars, it is permited
that the Main reinforcement can dodge。
Gently hoist the whole piece of anchors assembled with the base section as the fig 4.1-1a so that it is in a
vertical position before placing concrete.
(1)The concrete strength grade must not be lower than C35。
(2)Before casting concrete, Hang plumb lines along the center of base section to calibrate the
verticality of the center-line.
(3)Make sure horizontal plane is less than1.5/1000 and the flatness is less than 2mm.
(4)Concrete filling rate around the embedded anchors must be over 95%.
Prerequisite