Sunteți pe pagina 1din 4

Resume Synopsis

Personal Details
Name of candidate Lalit Kothiya
Date of Birth 17.11.1983
Degree in (BE - IC) Instrumentation &
Education
Control
Current Location Surat
Confirmation that you have not been
approached before by any other Yes
consultant or directly by the company.
Work Experience
L & T Technology Services Limited as
Organization, Designation
Project Lead – IAM
Total Experience 11 Years
Reporting To / Repotees DGM / 1 Engineer
due to Personal Reasons & Health Issues
Reason for Change
Left job
Compensation Details:
Last CTC 10.5LPA
Variable component in current salary
Expected CTC 25% Hike
Notice Period Immediate
LALIT KOTHIYA [Instrumentation & Control]
E-Mail: lalitbeic@gmail.com
lalit.kothiya@outlook.com
Ph +919879840915

________________________________________________________________________________________
CURRICULAM VITAE
EDUCATIONAL QUALIFICATIONS
 Degree in (BE - IC) Instrumentation & Control Engineering from Vishwakarma Govt Engineering
College. Affiliated with Gujarat Tech. University. Approved by AICTE.
 Degree completed in year 2007 with 61.90%
 H.S.C., (Mathematics, Science with 72.50%) In April 2003
 S.S.C., (English with 90.33%) In April 2001
WORK COMPENDIUM
________________________________________________________________________________________
10+ Years of experience in the field of Instrumentation & Control System Engineering, Installation, Testing,
commissioning as well Operation & Maintenance & Material Management.
 Oil and Gas Projects-Refinery Off gas Cracker, Hydrocarbon/ Natural gas
 Instrumentation Projects- Installation, Testing & Commissioning, Planning – Reliability and
Maintenance, DCS/ESD/PLC Packages System
 SAP – PM & MM ERP
 Data Control – ASSAI Admin, Cloud, Share Point
________________________________________________________________________________________
WORK EXPERIENCE
L & T Technology Services Limited [Dec 2018 to Feb 2019]
Project Lead – IAM - Information Asset Management Professional in Smart Manufacturing Projects
Shell Offshore Division
 Document management and Data Management associated with Oil and Gas green field and
brown field projects
 Proficient in EDMS & EDW systems combined with knowledge of the entire EPCM project
information lifecycle
 Knowledge of IM tools like ASSAI, SharePoint, and EDW.
 Understanding on implementing procedures for all aspects of Document Control within the
Capital Project.
 Knowledge on project document control against project procedures for internal and external
design and vendor documents, and project correspondence.
 Proficient in Data Quality checks and reporting on completeness, correctness and consistency of
Engineering Data and Documents
______________________________________________________________________________________
RIL-Reliance Industries Limited Jamnagar Refinery [10th Sep 2015 to 22nd Oct 2018]
Post Held: Manager - Engineering & Maintenance
Department: ROGC-Refinery off Gas Cracker Unit – Instrumentation
 Review Various Engineering Drawing & Document like P&Ids, GAD, Loop Scheme, Instrument
Location layout & Make BOM, Co-ordination with Purchase Dept. For Material management
 Perform Project Management activities that include conceptualization, Scope Definition, Estimation
of resources, Planning & Scheduling, Execution and Progress Monitoring & Control, Co-ordinate &
Attend Project Progress & Training meetings.
 Provide instrumentation & System expertise to PMT for Capex & MoC projects by providing core
support in Project management, Basic & Details Engineering, Engineering coordination during
procurement, construction and commissioning, with the perspective of Instrumentation System
 DCS & ESD System –Invensys make Foxboro DCS, Archesta /ESD - Triconex, Foundation Field bus
System.
 Woodward Governing System, Anti Surge Control System-CCC, Honeywell F&G System.
 Preparation of HOTO, PC&C Documentation for Instrumentation System.
 SAP MM, PM, Inventory Modelling, Material management, Procurement, Inventory Control Plant
Maintenance Planning.
 Carry out job hazard analysis and ensure compliance to safety requirements.
 Precommissioning /commissioning of constructed facilities and troubleshooting of the same.
 Supervise instrumentation maintenance jobs Scheduling, Planning including troubleshooting of DCS,
PLCs etc.
 Successfully completed flawless Commissioning of World’s Largest Refinery off Gas cracker plant.
Enterprise Resource Planning (ERP) preferably SAP (Project & Steady State)
 Review equipment drawings, bill of materials and ensure accuracy of material data & specifications
 Explores and proposes the usage of the most suitable preservation methodologies and their
implementation in order to maintain the life of stored material.
 Handles mass data packages of line items, long-term contracts and purchase requisition to maintain
efficient data management in relation with inventory cell.
 Ensures inventory level and technical parameters of required material to meet the requirements of
Material Requirements Planning (MRP).
 Provides input into budget preparations under the guidance of the Lead Maintenance.
________________________________________________________________________________
ATUL Limited - Valsad Chemical Complex [Feb-2012 to Jun-2012](RFC-Started own company)
Post Held: Sr. Executive – Instrumentation & Control System
Department: Engineering and Maintenance
 DCS Yokogawa Centum VP, Siemens S7
 Review Various Engineering Drawing & Document like P&Ids, GAD, Loop Scheme, Instrument
Location layout & Make BOM, Co-ordination with Purchase Dept. For Material management
 E&I interface, MCC, IRP, PDB, MEDB, UPS, and HVAC Supply Distribution etc.
 Review/preparation of site Quality assurance plans and Quality checks as per QAP,
 Carry out job hazard analysis and ensure compliance to safety requirements
 Resolve construction and project progress related issues if any
 Precommissioning /commissioning of constructed facilities and troubleshooting of the same.
 Supervise instrumentation maintenance jobs including troubleshooting of DCS, PLCs etc.
_________________________________________________________________________________
Aarvi Encon Limited [6th Jul 2010 to 15th Feb 2012]
Post Held: E & I Engineer: Client GSPL
 Review of P & ID’s makes BOM, instrument location layouts, loop drawings, hook-up drawings.
 Review Technical bid analysis, vendor document review for E&I scope as per technical specifications.
 Witness all Types Of activities calibration of PT, TT, FT, PS, DPS, RTD, T/C, GOV, HOV Temperature &
Pressure Gauges, Fire & Gas Detection System
 Installation of PLC & SCADA (Invensys make) Operating system for Measurement & Control various
Tempe, Pressure, Flow Data & Summary of all Parameter records and its Troubleshooting
 Approval of various job procedures of pipeline activities For Cathodic Protection both TCP/PCP,
Installation, testing & Commissioning
 Engineering co-ordination for the project Involve in pre-commissioning and commissioning activities.
_________________________________________________________________________________
Gujarat Gas Company Ltd Hazira [May 2009 to Jun 2010]
Post Held: C & I Engineer. (TPC role - Aeicorp Technology (P) Ltd.) – Mora Control Station
 Troubleshoot & solved the problem with all field instrument & PLC, SCADA, occurring during
operation of packages. With proper communicate with team & control room as well client. All work
would carry out with work permit as need & Safety norms.
 Ensure meeting HSSE targets: Near miss, Hazard, work place inspection, BBS observation and Safety
interventions for self and team. Carry out actions for closeout of Hazards and WPI observations
 E&I interface, MCC, IRP, PDB, MEDB, UPS, and HVAC Supply Distribution etc.
Operation execution, client co-ordination, material management, manpower handling, billing of sub-
contractors.
_________________________________________________________________________________
SUZLON Energy Limited Pune [Oct 2007 to 24th April 2009]
Post Held: Engineer – Commissioning, GET
 Worked as Commissioning Department as an Engineer at Jaisalmer & Kutchh Site
 Planning & coordination: Acted as liaison to corroborate plans between contractors and base
 To load the software in the PLC controller. Buchman GmBH
 Working with PLC relay and controller. Brief knowledge of PLC controller, drives and PLC logic.
 Worked on Pitch Control system such as pitching of blades, switch setting, Calibration of blade,
programming of Drives.
 Worked with different types of sensor likes temperature sensor, limit switch, speed sensor, vibration
sensor and wind sensor.
 Quality Work: check all components and their setting as per given format.
 Operation work: To troubleshoot & solved the problem those occurring during commissioning.
________________________________________________________________________________________
AWARDS & ACHIVEMENTS:
 Ranked Second in Reasoning & Math’s Quiz competition at College level.
 Awarded several prizes in cultural events in inter college competitions.
 Participated in Inter College Cricket Tournament of the “University of Gujarat” organized by Shri
Vishwakarma Engg. College, Gandhinagar in the year 2006-2007
________________________________________________________________________________________
PERSONAL DETAILS
NAME : LALITKUMAR DHIRAJLAL KOTHIYA
DATE OF BIRTH : 17.11.1983
NATIONALITY : INDIAN
ADDRESS FOR COMMUNICATION : 24, Laxmiwadi Society, NaniVed, Gurukul Road, Surat-
: 395004-Gujarat
MARITAL STATUS : Married
CATEGORY : GENERAL
RELIGION : HINDU.
PASSPORT NO. : S4235677
________________________________________________________________________________________
CERTIFICATION
I, under signed, certify that to the best of my knowledge and belief, this Bio-Data correctly describes my
qualification, experience and me.

Date & Place LALITKUMAR DHIRAJLAL KOTHIYA

S-ar putea să vă placă și