Contractor’s Site

Layout & Logistic


BSR 100
BUILDING CONSTRUCTION 1

1
2
Sub-topic

5.0 Introduction
5.1 Objective of Site Layout
5.2 Advantages of Site Layout
5.3 Information needed for Site Layout
5.4 Requirements
5.5 Planning
5.6 Failure Analysis
5.7 Plant, Equipment & Machine
3
4
5.O Introduction

What is Construction Site?


- Construction site is an area of land or fraction
of a land that has been identified for the
purpose of building or engineering works,
whether the size of a small area or large.
- Therefore, the site is an area of construction
work, other than to place the site facilities,
plant and place of storage of construction
materials and equipment .
5
Introduction (cont’d)

 At construction sites, various forms of


construction work will be carried out to
produce a building or engineering structure,
large or small depending on the size of the
building.

6
5.1 Objectives of Site
Layout
 Determine the placement of facilities and
basic requirements on construction sites.
 Work plan and identify appropriate
construction methods.
 To ensure a smooth and safe movement
(sequence of operation).
 Meet the standards in Safety Act at
Workplace (1974).

7
8
5.2 Advantages of Site
Layout
 To ensure the distance and position as
possible in the workplace, plant and storage
and other facilities.
 An optimal space planning work.
 Minimize the handling of construction
material or components.
 Preparing a safe & proper space for materials
storage and construction plant.
 For the purpose of workplace & worker
safety.
9
Additional Notes – Preparation
Process for Site Layout
Parking

Storage Access
area Road

Needs
&
Position
Temporary
Hoarding Road
Temporary
Building
- Site office
- Resident
- Store
- Canteen 10
11
5.3 Information needed for
site layout

Main road, access


Total site area Physical condition
road

Water, electric
supply & Adjoining city / Surrounding
telecommunication town condition
system

12
5.3 Information needed for site
layout (cont’d)

Project detail Plan

Construction Action during


site accident &
organization safety signage
13
5.4 Requirements

Construction area

Site accommodation

Storage area

Safety control

14
5.5 Planning
Geography Project period &
Condition / Needs of money needed
current labour, during
condition of equipment & preliminaries for
construction materials. site
site. accommodation.

Types of
Type &
Construction
approximate
& total work
area of site.
done.

15
5.6 Failure Analysis for Site
Planning
Accidents at
construction
site.

Health &
safety of Theft or loss
worker is of materials.
neglected.

Intrusion
Late from outside
completion. and
sabotage.

Smooth
movement of
the work site
affected.
16
17