WORK ACTIVITIES:
Concerns Still waiting for the excavation barge taken to the rig to be retuned to the MD1 cluster area.
Description of Picture
Picture Picture
Picture Picture
Picture Picture
.
Picture Picture
OPERATIVES EMPLOYED
NDT Technicians
Welder Coded
Fabricator/Fitter
Grinders
Plant/Crane/Operators (2 in fabshop)
Artisans, Carpenters Chain man etc.
Mechanic
Instrument Tech
Electrical Tech
Skilled Labor/Rigger (4 at fab shop)
Unskilled community Labor
Painters, Blaster
Driver
Scaffolder
Storeman
Security/Safety Staff
Lead Suveyor
Surveyor assist
Piling tech
CLIENT/OWNER REP.
NAME :
SIGNATURE:
DATE:
PLORATION AND PRODUCTION NIGERIA LIMITED
Paint Brush
Porland cement 50(kg) bag
Sharp Sand (m3)
crusch garnite (m3)
Stone base 0-50 (m3)
Cement
CONTRACTOR's REP.
NAME :
SIGNATURE:
DATE:
WEIGHT
S/N ACTIVITY
FACTOR
Points %
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
100
100 10.0 0.9%
100 12.0 1.1%
100 12.0 1.1%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
3.0% 34.0 3.0%
3%