DAILY SITE REPORT

Date 4/6/2019 Contractor's Name AJAMY OIL & GAS


CONSTRUCTION OF GBETIOKUN STORAGE AREA
Project MOORING AND BREASTING DOLPHINS; EPF Site Location GBETIOKUN, JETTY AREA
ANCHORAGE
PILING WORKS FOR MOORING, BREASTING
Scope Contract No.
DOLPHINS
Day on Site Day 35 Third-Party Inspection Company SECOND ADAMS
Site Hours worked 10 hrs TPI Name: Nwoha Peter

WORK ACTIVITIES:

EQUIPMENT AND STATUS


PILING RIG:
Summary of Work Activities - Delmac D19-32:STATUS: Working
- Delmac D19-42: STATUS:Working
WELDING MACHINE
-Lincoln Electric Vintage 400 : STATUS: Under Maintenance
-Lincoln Arc Weld Sam 400 : STATUS : WORKING

Concerns Still waiting for the excavation barge taken to the rig to be retuned to the MD1 cluster area.

Description of Picture

Picture Picture

Picture Picture

Picture Picture

.
Picture Picture

COMMENT: - Storage Area Breasting Dolphin piling - 100% complete


- Storage Area Mooring Dolphin piling - 75% complete
- Storage Area Mooring Bollard Pilling - 100% complete
CLIENT/OWNER: ELCREST EXPLORATION AND PRODUCTION NIGERIA LIMITED
CONTRACT No.:
PROJECT: CONSTRUCTION OF STORAGE AREA MOORING AND BREASTING DOLPHINS; EPF AN
SCOPE: ENGINEERING, PROCUREMENT AND CONSTRUCTION AND INSTALLATION
Work Force Applied: (Site Works - Red) Mark "x" where resource is not applicable
SUPERVISION EMPLOYED No.
MANAGEMENT
Project Manager
Construction surpervisor
Project Engineer
QC Supervisor
Fitters Forman
Safety Officer
Community Relations Officer
Piling master

OPERATIVES EMPLOYED
NDT Technicians
Welder Coded
Fabricator/Fitter
Grinders

Plant/Crane/Operators (2 in fabshop)
Artisans, Carpenters Chain man etc.
Mechanic
Instrument Tech
Electrical Tech
Skilled Labor/Rigger (4 at fab shop)
Unskilled community Labor
Painters, Blaster
Driver
Scaffolder
Storeman
Security/Safety Staff
Lead Suveyor
Surveyor assist
Piling tech
CLIENT/OWNER REP.
NAME :
SIGNATURE:
DATE:
PLORATION AND PRODUCTION NIGERIA LIMITED

STORAGE AREA MOORING AND BREASTING DOLPHINS; EPF ANCHORAGE


REMENT AND CONSTRUCTION AND INSTALLATION
Red) Mark "x" where resource is not applicable
EQUIPMENT & TOOLS No.
EMPLOYED
Electric power generator - 50 to 100 kva
Concrete mixer
Diesel tank 3000 liters
Oxy/Acetylene cutting set
9 Inches Power Grinder and brushes
4-1/2 inches Power Grinder
Electrode Quiver
Fitters Tool box complete with hand tools
Welders Tool box complete with hand tools
Electrical and instrumentation toll box c/w Hand tools
Pipe / metal locator
Leveling instrument
Crawler hydraulic excavator D317
8-man accommodation cabins
4-man accommodation cabins/office
Kitchen cabin
Mess/recreational room cabin
Storage container
Waste Basket
Spades, Shovels, Pick axes, etc.
Head pans, Matchets
Air compressor 375
Swamp Excavator
Wheel loader
CAT grader
Compactor roller
4WD tipper truck
Barge - 1,000 tonne capacity
Tugboat -1000hp
Pipe cold cutter Tools 14 to 20”
Personnel Boat
Water tank 2,000 liters Gee Pee
DED Welding set 400 amp c/w welding cable, handle and
earth clamp
Flat bed truck
Measuring tapes (50m)
Scaffold Tube 20 ft
Scaffold Clips
Scaffold Planks
Ladder
Sick bay
Piling rig, complete with crane
Chain block 1-1/2 Tons to 3 Tons
Lifting belt 4” wide
Heavy duty socket tool box
Light duty socket tool box
Fill pump 150 cm3/h
H.P. pump
Pressure/Temperature Barton Recorder
Pressure Gauge 4”
Painter hand tool set
Airless spray pump + accessories
Airless spray painting set
Crawler crane 120T
Low bed Truck 80 Ton ( lact unit transportation)
35 ton crane
Fork lift
Abrasive blasting Set
450 amp electric welding set
THIRD-PARTY REP
NAME :
SIGNATURE:
DATE:
PF ANCHORAGE

CONSUMMABLE MATERIALS No.


EMPLOYED
Electrode E 6010 - 5/32" x 50lbs
Electrode E 6010 - 1/8" x 50lbs
Electrode E 7010 - 5/32" x 50lbs
Electrode E 7010 - 1/8" x 50lbs
Electrode E 7018 - 5/32" x 50lbs
Electrode E 7018 - 1/8" x 50lbs
Electrode M.S. x 5kg
Oxygen x 7.5 cu.mt. bottle
Acetylene x 6 cu.mt. bottle
Power Brush
9" Grinding Disc
9" Cutting Disc
7" Grinding Disc
7" Cutting Disc
4.5" Grinding Disc
4.5" Cutting Disc
Paint
Thinner

Paint Brush
Porland cement 50(kg) bag
Sharp Sand (m3)
crusch garnite (m3)
Stone base 0-50 (m3)
Cement
CONTRACTOR's REP.
NAME :
SIGNATURE:
DATE:
WEIGHT
S/N ACTIVITY
FACTOR

STORAGE AREA MOORING & BREASTING DOLPHINS;


Points
EPF ANCHORAGE
A Construction of Mooring Dolphins
1 Setting out, survey, site preparation 10
2 6 Nos. Piled Legs of MD-1, rebar and concrete grouting 54
3 6 Nos. Piled Legs of MD-2, rebar and concrete grouting 54
4 6 Nos. Piled Legs of MD-3, rebar and concrete grouting 54
5 6 Nos. Piled Legs of MD-4, rebar and concrete grouting 54
6 Pile Caps Welding and NDT 12
7 Sacrificial Anodes installation on 4 x 6-legged MDs 24
Shop Fabrication of MD-1 Topside (Bend plate, rebar, 2 nos.
8 40
bollards)
Shop Fabrication of MD-2 Topside (Bend plate, rebar, 2 nos.
9 40
bollards)
Shop Fabrication of MD-3 Topside (Bend plate, rebar, 2 nos.
10 40
bollards)
Shop Fabrication of MD-4 Topside (Bend plate, rebar, 2 nos.
11 40
bollards)
Site Installation of MD-1 (welding, rebar, concrete works) Topsides
12 50
and Accessories
Site Installation of MD-2 (welding, rebar, concrete works) Topsides
13 50
and Accessories
Site Installation of MD-3 (welding, rebar, concrete works) Topsides
14 50
and Accessories
Site Installation of MD-4 (welding, rebar, concrete works) Topsides
15 50
and Accessories
16 NDT, Touch-Up Painting of 4 nos. Mooring Dolphins 80
B Construction of Breasting Dolphins (Storage Vessel)
17 Setting out, survey 10
18 4 Nos. Piled Legs of BD-1 12
19 4 Nos. Piled Legs of BD-2 12
20 4 Nos. Piled Legs of BD-3 12
21 Pile Caps Welding and NDT 8
22 Sacrificial Anodes installation on 3 x 4-legged MDs 12
Shop Fabrication of BD-1 Topside (upper, lower sections, breasting
23 50
plate, pre-cut timber installation, ladder)
Shop Fabrication of BD-2 Topside (upper, lower sections, breasting
24 50
plate, pre-cut timber installation, ladder)
Shop Fabrication of BD-3 Topside (upper, lower sections, breasting
25 50
plate, pre-cut timber installation, ladder)
Site Installation of BD-1 (welding, rebar, concrete works) Topsides
26 50
and Accessories
Site Installation of BD-2 (welding, rebar, concrete works) Topsides
27 50
and Accessories
Site Installation of BD-3 (welding, rebar, concrete works) Topsides
28 50
and Accessories
29 NDT, Touch-Up Painting of 3 nos. Breasting Dolphins 60
C Construction of Breasting Dolphins (EPF Area)
30 Setting out, survey 10
31 3 Nos. Piled Legs of BTP-1 9
32 3 Nos. Piled Legs of BTP-2 9
33 Pile Caps Welding and NDT 3
34 Sacrificial Anodes installation on 3 x 4-legged MDs 6
Shop Fabrication of BTP-1 Topside (upper, lower sections,
35 60
breasting plate, pre-cut timber installation x 2, ladder)
Shop Fabrication of BTP-2 Topside (upper, lower sections,
36 60
breasting plate, pre-cut timber installation x 2, ladder)
Site Installation of BTP-1 (welding, rebar, concrete works) Topsides
37 50
and Accessories
Site Installation of BTP-2 (welding, rebar, concrete works) Topsides
38 50
and Accessories
39 NDT, Touch-Up Painting of 2 nos. Breasting Dolphins 40
D Construction of EPF Mooring Pins
40 Setting out, survey 10
41 1 Nos. Piled Leg of MP-1 3
42 2 Nos. Piled Leg of MP-2 3
43 3 Nos. Piled Leg of MP-3 3
44 4 Nos. Piled Leg of MP-4 3
45 5 Nos. Piled Leg of MP-5 3
46 6 Nos. Piled Leg of MP-6 3
47 Shop Fabrication of BTP-1 Topside (Bollards) 20
48 Shop Fabrication of BTP-2 Topside (Bollards) 20

49 Site Installation of BTP-1 (welding, rebar, concrete works) Topsides 30

50 Site Installation of BTP-1 (welding, rebar, concrete works) Topsides 30

51 NDT, Touch-Up Painting of 6 nos. Mooring Pins 30


Summary 1128
OVERALL PROGRESS ACHIEVED TO DATE:
DATE:
ACHIEVED ACHIEVED WEIGHTED
TASK WEIGHT TASK
PROGRESS PROGRESS

Points %

0 0.0 0.0% ONLY EDIT COLUM HIGHLIGHTED IN YELLOW


0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%
100
100 10.0 0.9%
100 12.0 1.1%
100 12.0 1.1%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%
0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

100 10.0 0.9%


100 3.0 0.3%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%
0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%

0 0.0 0.0%
3.0% 34.0 3.0%
3%