Sunteți pe pagina 1din 8

Client SWCC

Location
AL-SHARIF GROUP
Contractor Contract No.
HOLDING
Sheet No.
Site Test MOTOR PROTECTION
Record RELAY Page 1 of

1. GENERAL DETAILS
Panel Ref CT Ratio 100/1
Relay Type ARGUS-7SR1102 In 1
Manufacturer REYROLLE VT Ratio 2.
Serial No. BF1912506976 Vn
No. of contacts: 3BI+5BO Drawing/Sheet No
Order - No. 7SR1702-3NA87-1CAO-Z 100-250 VDC
Auxiliary Voltage
Software Revision 2436H80012R4f-2b#671c 100-230 V 50/60 Hz
88V DC Threshold
Opto-coupler supply: Frequency (fn) 60 Hz
(Rated 110-250VDC)
VISUAL INPECTION:

ITEM DESCRIPTION REMARKS


1 Inspect Physical Damage/Defects Yes N/A
2 Verify the relay as per Approved Drawing Yes N/A
3 Verify the connection as per approved drawing Yes N/A
4 Relay grounding Connection Yes N/A
5 Tightness of all connections Yes N/A
6 CT shorting at relay end Yes N/A

3. ELECTRICAL TESTS:

ITEM DESCRIPTION REMARKS


1 Human Machine Interface [ HMI ] checked. Yes N/A
2 Test switch checked for correct function. Yes N/A
3 Binary Input checked Yes N/A
4 Checked all binary output configured as per scheme Yes N/A
5 Checked all configured LED’s as per scheme Yes N/A
6 Disturbance Report Function checked Yes N/A
7 Reset of indications checked. Yes N/A
8 Auxiliary power supply checked for rating and polarity Yes N/A
9 Date and Time in the relay Yes N/A

Test Performed by: Test Witnessed by: Date of Test


Name:
Signature:
Client SWCC

Location
AL-SHARIF GROUP
Contractor Contract No.
HOLDING
Sheet No.
Site Test MOTOR PROTECTION
Record RELAY Page 2 of

3.1 BINARY INPUT TESTING:

Input No Terminal No Description Remarks


BI-01 B2 & B4 Ok
BI-02 B6 & B8 Ok
BI-03 B10 & B12 Ok

3.2 BINARY OUTPUT TESTING:

Output No Terminal No Description Remarks


A2 & A3 Ok
BO-1
A2 & A1 Ok
A5 & A4 Ok
BO-2
A5 & A6 Ok
BO-3 A7 & A8 Ok
BO-4 A9 & A10 Ok
BO-5 A11 & A12 Ok

3.3 LED’s TESTING:

LED No Description Remarks


LED 1 Ok
LED 2 Ok
LED 3 Ok
LED 4 Ok
LED 5 Ok
LED 6 Ok
LED 7 Ok
LED 8 Ok
LED 9 Ok

4. MEASUREMENTS:
4.1 CURRENT MEASUREMENT:

Applied Current Measured Current in Primary (A) Remarks


Phase
(A) R Y B N
R-Y-B 25%
R-Y-B 50%

Test Performed by: Test Witnessed by: Date of Test


Name:
Signature:
Client SWCC

Location
AL-SHARIF GROUP
Contractor Contract No.
HOLDING
Sheet No.
Site Test MOTOR PROTECTION
Record RELAY Page 3 of

R-Y-B 75%
R-Y-B 100%
Sequence Components at 3Φ Currents:
Positive Sequence Current I1 : 1.00 x In
Negative Sequence Current I2 : 0.00 x In
Zero Sequence Current I0 : 0.00 x In

4.2 VOLTAGE MEASUREMENT:

Applied Voltage Measured Voltage (kV) Remarks


Phase
(V) R Y B N
R-Y-B 25%
R-Y-B 50%
R-Y-B 75%
R-Y-B 100%

Sequence Components at 3Φ Voltages:


Positive Sequence Voltage V1 : V
Negative Sequence Voltage V2 : V
Zero Sequence Voltage V0 : V

4.3 POWER MEASUREMENT:

Applied Values Calculated Values Measured Values Remarks


3ø Current – A P= MW P= MW
3ø Voltage – (Ph-Ph) Q= MVAR Q= MVAR
S= MVA S= MVA
PF = PF =
Accuracy : ± 3.0% of Pn, Where Pn = Vn*In
PF Accuracy : ± 0.05, Frequency Accuracy: ± 10mHz
P=√3*V*I*CosΦ Q=√3*V*I*SinΦ S=√3*V*I PF= CosΦ

5. OVERCURRENT PROTECTION:

5.1 INTENTANEOUS OVER CURRENT(50-1):


50-1 : 2.5xIn 50-1 Dir Ctrl : Non-Directional
50-1 Delay : 0.05S NA

Pickup Current Measured Op.Time (ms)


Phase Set Current (A) Remarks
(A) @ 2Is
R

Test Performed by: Test Witnessed by: Date of Test


Name:
Signature:
Client SWCC

Location
AL-SHARIF GROUP
Contractor Contract No.
HOLDING
Sheet No.
Site Test MOTOR PROTECTION
Record RELAY Page 4 of

Y
B
RYB
5.2 TIME DELAYED OVER CURRENT(51-1):

Pickup Calculated Operating Measured Operating


IEC Set Current
Phase Current Time (Sec) Time (Sec) Remarks
CURVE (A)
(A) 2Is 5Is 2Is 5Is
RYB
RYB
RYB
Pickup Tolerance: 105% Is, ±4% or ±1% of In (Refer Page No-146)
IDMT Operation Time Tolerance: ±5% of absolute or ± 30ms + Start Time 20ms @ 2xIs(Ref.Page-147)

6. THERMAL OVERLOAD PROTECTION(49):

Thermal Protection Common settings


49 Char IEC 49 Thermal Restart Mode Capacity
49 Tauh Heating constant 10 Min 49 NPS Weighting Average
49 Taus Starting Constant 1 x Tauh 49 Itheta Thermal Overload 1.05 x In
49 Tauc Cooling Constant 5 x Tauh 49 Motor Start current 1.05 x Itheta
49 Hot/Cold Ratio setting 50% 49 End of Start 1.00 x Itheta
49 capacity Alarm Setting 90% 49 Motor Stop Current 0.10 x Itheta
49 Restart Inhibit Mode Auto 49 Motor Stop delay 0.00 Sec
Calculation:
In = 1.0 A
Itheta Calculation
Itheta = 1.05 x In
Itheta = 1.05 x 1
Itheta = 1.05 A
Motor Start Current Calculation
Motor Start Current = 1.05 x Itheta
Motor Start Current = 1.05 x 1.05
Motor Start Current = 1.1025 A
Motor End of Start Current Calculation

Test Performed by: Test Witnessed by: Date of Test


Name:
Signature:
Client SWCC

Location
AL-SHARIF GROUP
Contractor Contract No.
HOLDING
Sheet No.
Site Test MOTOR PROTECTION
Record RELAY Page 5 of

End of Start Current = 1.00 x Itheta


End of Start Current = 1.00 x 1.05
End of Start Current = 1.05 A
Motor Stop Current Calculation
Motor Stop Current = 0.10 x Itheta
Motor Stop Current = 0.10 x 1.05
Motor Stop Current = 0.105 A

Applied Calculated Operating Measured Operating Time @ Remarks


Phase
Current (A) Time (Sec) 2 x Itheta (sec)
2.10∟0°
RYB 2.10∟240° 172.60 173.3 Ok
2.10∟120°

τ = Starting Time constant (In this case)


I = Applied Equivalent Current
H/C= Hot/Cold Ratio
IP = Prior Load Current
Is = Set Overload Current (Itheta)

600*ln { 12-(1-0.5)*0
-1.05*1.05

7. STALL PROTECTION(14):
Stage-1: 14-1

Settings:
Gn-14-1 Setting 2.0 x In
Gn-14-1Control Running
Gn-14-1 delay 5.0 Sec

Expected Operating Time @


P/U Current Prefault Current Injected Current
Operating 2 x Is Remarks
Setting (A) (A)
Time (sec)
2.0 x In 0.6∟0° 2.5∟0° 5.0 5.03 Ok

Test Performed by: Test Witnessed by: Date of Test


Name:
Signature:
Client SWCC

Location
AL-SHARIF GROUP
Contractor Contract No.
HOLDING
Sheet No.
Site Test MOTOR PROTECTION
Record RELAY Page 6 of

0.6∟240° 2.5∟240°
0.6∟120° 2.5∟120°

Pickup Tolerance: 100% Is, ±5% or ±1% of In


Operation Time Tolerance: ± 1% or ±10ms + Element basic operating time 35 ms @ 2xIs, ±10ms
Ref.Page no:133

8. PHASE UNBALANCE PROTECTION(46):


Settings:
46 Type : NPS 46 Char : 46
46 Setting : 0.1 x Itheta 46 Min Operate Time :1
46 TMS :1
Calculation:
46 Set Value = 0.1 x Itheta
Itheta = 1.05 x In (Thermal Protection)

Operating Time @ 2 x Is Remarks


Phase Set Current (A) Pickup Current(I2)
(sec)
R x In
Y x In
B x In
RYB x In
Pickup Tolerance: 100% Is, ±5% or ±1% of In
Operation Time Tolerance: ± 5% Absolute or ± 30ms + Element basic Operating Time 60 ms @ 2xIs
Procedure:
For 1Φ Pickup:
Apply 1Φ current less than 3 x Set Value and slowly increase until relay trip.
For 3Φ Pickup:
Apply 3Φ current less than set value with reversal angle of any 2Φ (0°, 120°, 240°) and increase the
currentslowly until relay trip.
Trip Time Formula:

Here I2 = Negative Sequence Current


Iϴ = Itheta Thermal Overload
tm = Minimum Operate Time
Trip Time Calculation:

Test Performed by: Test Witnessed by: Date of Test


Name:
Signature:
Client SWCC

Location
AL-SHARIF GROUP
Contractor Contract No.
HOLDING
Sheet No.
Site Test MOTOR PROTECTION
Record RELAY Page 7 of

46 Set Value = 0.1 x Itheta


Iϴ = 1.05 x In,
Minimum Operate Time (tm) = 1.0 Sec
I2 = 0.105 x In (Pickup Value)
t = (1.0/ (0.105xIn/1.05xIn)2) x 1.0
t = 100.0 sec

9. UNDER CURRENT PROTECTION(37):


Stage-1: 37-1

37-1 Setting : 0.25 x In 37-1 delay : 2.00 Sec


37-1 U/C Guard : Yes 37-1 Start Option : All (3 Phase)

Operating Remarks
Applied Set Current Pickup Drop Off
Phase Time @ 0.125
Current (A) Current Current
x In (Sec)
R 5∟0° 1.25
Y 5∟240° 1.25
B 5∟120° 1.25
Pickup Tolerance: 100% Is, ±5% or ±1% of In
Operation Time Tolerance: ± 1% or ±10ms + Element basic operating time 50 ms @ 0.5xIs, ±10ms
Procedure:
Apply 3Φ Nominal current in all phases.
Reduce the 3Φ current gradually to below set value until relay trip.
Measure the time at 50% of set current value
U/C Guard setting reference is Motor Stop current = 0.1 x Itheta (Thermal Protection)

10. START TIME SUPERVISION(48):

11. START CONTROL TEST (66):


Settings:
Gn-66 Max Number of starts 2
Gn-66 Max Starts Period 30min
Gn-66 Start inhibit Delay 60min
Gn-66 Time Between Start 5min

Maximum Start 66-Start Counter Reset to Maximum Number of Start Measured max number
Period zero with in max Start Period of start
Test Performed by: Test Witnessed by: Date of Test
Name:
Signature:
Client SWCC

Location
AL-SHARIF GROUP
Contractor Contract No.
HOLDING
Sheet No.
Site Test MOTOR PROTECTION
Record RELAY Page 8 of

After Max Start Period


30min 2 2
Elapsed

MeasuredTime Start Inhibit Delay After Measured Restart Inhibit


Time Between Start
Between Start Max Number of Start Timer
5min 5min 60min 60 in

Test Performed by: Test Witnessed by: Date of Test


Name:
Signature: