Sunteți pe pagina 1din 4

INDUSTRIAL SAFETY MCQ

1-Probability of the event that might occur X Severity of the event if it occurs =
(A) Accident
(B) Hazard
(C) Risk
(D) None of the above
 
2-Industrial safety management if that branch of management which is concerned with
______ hazards from the industries.
(A) Reducing
(B) Controlling
(C) Eliminating
(D) All of the above
 
3-The following is indirect cost of accident
(A) Money paid for treatment of worker
(B) Compensation paid to worker
(C) Cost of lost time of injured worker
(D) All of the above
 
4-The following is(are) physical hazard agent(s)
(A) Falls
(B) Electricity
(C) Inhalation
(D) All of the above
 
5-Check list for Job Safety Analysis (JSA) consists of
(A) Work area, material, machine, tools
(B) Men, machine, material, tools
(C) Men, machine, work area, tools
(D) Men, work area. Material, tools
 
6-A safety programme consists of
(A) Three E’s
(B) Four E’s
(C) Five E’s
(D) Six E’s
 
7-For household wiring and small units, the following should be used for safety measure
(A) MCB
(B) ACB
(C) OCB
(D) MCCB
 
8-Which of the following colour is used for radiation hazard?
(A) Red
(B) Orange
(C) Green
(D) Purple
 
9-Decibel (db) is a unit used to measure
(A) Light
(B) Sound
(C) Frequency
(D) None of the above
 
10-The following is (are) are generally provided with limit switch to prevent motion beyond
preset limit
(A) Hoists
(B) Conveyors
(C) Machine tables
(D) All of the above
 
11-The following is (are) used as safety device(s) in machines
(A) Fail safe
(B) Safety interlocks
(C) Limit switches
(D) All of the above
 
12-Class-A fire consists of fire due to
(A) Wood
(B) Oil
(C) Transformer
(D) Chemical
 
13-Water is used to extinguish
(A) Class-A fires
(B) Class-B fires
(C) Class-C fires
(D) All of the above
 
14-The following class of fire occur in electrical equipment
(A) Class-A fires
(B) Class-B fires
(C) Class-C fires
(D) All of the above
 
15-The following extinguisher is suitable for cotton or other textile fire
(A) Water
(B) Soda acid
(C) Foam
(D) Dry chemicals
 
16-_____ is best suited to extinguishing oil or flammable liquid fire.
(A) Soda acid
(B) Vaporizing liquid
(C) Foam
(D) Dry chemical
MAINTAINANCE
1-Maintenance consist of the following action(s)
(A) Replace of component
(B) Repair of component
(C) Service of component
(D) All of the above
 
2-The time elapsed from the point the machine fails to perform its function to the point it is
repaired and brought into operating condition is known as
(A) Down time
(B) Break Down time
(C) Both (A) and (B)
(D) Idle time
 
3-The down time cost consists of
(A) Loss of production
(B) Wages paid to the workers
(C) Reduction in sales
(D) All of the above
 
4-The following is not a classification of maintenance
(A) Corrective maintenance
(B) Timely maintenance
(C) Scheduled maintenance
(D) Preventive maintenance
 
5-Belt of an electric motor is broken, it needs
(A) Corrective maintenance
(B) Scheduled maintenance
(C) Preventive maintenance
(D) Timely maintenance
 
6-The following is (are) scheduled maintenance
(A) Overhauling of machine
(B) Cleaning of tank
(C) Whitewashing of building
(D) All of the above
 
7-Scheduled maintenance is _______ between breakdown maintenance and the preventive
maintenance.
(A) Joint
(B) Compromise
(C) Bridge
(D) In
 

8-Equipment history cards are meant to record


(A) The way equipment behaves
(B) Total down time of the equipment
(C) The rate at which different components wear off
(D) All of the above
 
9-The ____ goes on increasing with the increase in degree of maintenance efforts.
(A) Cost of down time
(B) Cost of spares and maintenance
(C) Labour and Overhead Cost
(D) All of the above
 
10-With the increase in preventive maintenance cost, breakdown maintenance cost
(A) Increases
(B) Decreases
(C) Remain same
(D) Any of the above
 
11-A systematic approach for maintenance is
(A) Problem – Cause – Diagnosis – Rectification
(B) Problem– Diagnosis – Cause – Rectification
(C) Problem – Measure – Diagnosis – Rectification
(D) Problem– Diagnosis – Measure – Rectification
 
12-(Down time in hours / Available hours) =
(A) Maintenance effectiveness
(B) Frequency of breakdown
(C) Effectiveness of maintenance planning
(D) None of the above
 
13-(Number of breakdowns / Available machine hours) =
(A) Maintenance effectiveness
(B) Frequency of breakdown
(C) Effectiveness of maintenance planning
(D) None of the above
 
14-Total productive maintenance aims at
(A) Less idle time
(B) Increase in productivity
(C) Zero down time
(D) None of the above
 
15-Total Productive maintenance (TPM) approach has the potential of providing almost a
seamless integration between
(A) Production and Quality
(B) Quality and Maintenance
(C) Production and Maintenance
(D) All of the above
 