Project Name : Kompleks Sukan Mini Jabi Factor of Safety

Location : Jabi
Boreholes No : BH1 Fs (skin) = 2.0
Date : October 2018 Fb (Bearing) = 3.0

MEYERHOF Formulae : K1 K2

(Skin) Ps = K1 x Nav x As SAND 2.0 400


(Bearing) Pb = K2 x Nb X Ab SILT 1.7 250
(Ult. Load) Pu = Ps + Pb CLAY 3.0 63
(All. Load) Pa = Ps/Fs + Pb/Fb

(To calculate allowable soil bearing capacity)


Pile type used = 250 mm R.C Square Pile
Skin area, As = 1.5 m2/m run
Base area, Ab = 0.0625 m2

Depth Soil K1 K2 SPT Nave Skin Total Base Ultimate Allowable


Type N Fric, Ps Skin Load, Pb Load, Pu Load, Pa
(KN) (KN) (KN) (KN) (KN)
max load 546.9 KN
1.5 SILT 1.7 250 8 4 10.20 10.20 125.00 135.20 46.77 ASTAKA
3.0 SAND 2.0 400 10 9 27.00 37.20 250.00 287.20 101.93
4.5 SILT 1.7 250 14 12 30.60 67.80 218.75 286.55 106.82
6.0 SILT 1.7 250 12 13 33.15 100.95 187.50 288.45 112.98
7.5 SILT 1.7 250 12 12 30.60 131.55 187.50 319.05 128.28
9.0 SILT 1.7 250 13 12.5 31.88 163.43 203.13 366.55 149.42
10.5 SAND 2.0 400 13 13 39.00 202.43 325.00 527.43 209.55
12.0 SAND 2.0 400 14 13.5 40.50 242.93 350.00 592.93 238.13
13.5 SAND 2.0 400 17 15.5 46.50 289.43 425.00 714.43 286.38
15.0 SILT 1.7 250 20 18.5 47.18 336.60 312.50 649.10 272.47
16.5 SILT 1.7 250 21 20.5 52.28 388.88 328.13 717.00 303.81
18 SILT 1.7 250 20 20.5 52.28 441.15 312.50 753.65 324.74
19.5 SILT 1.7 250 21 20.5 52.28 493.43 328.13 821.55 356.09
21 SILT 1.7 250 31 26 66.30 559.73 484.38 1044.10 441.32
22.5 SILT 1.7 250 31 31 79.05 638.78 484.38 1123.15 480.85
24 SILT 1.7 250 38 34.5 87.98 726.75 593.75 1320.50 561.29 > 546.9KN can terminate pile at 24m.
25.5 SILT 1.7 250 31 34.5 87.98 814.73 484.38 1299.10 568.82
27 SILT 1.7 250 31 31 79.05 893.78 484.38 1378.15 608.35
28.5 SILT 1.7 250 31 31 79.05 972.83 484.38 1457.20 647.87
minate pile at 24m.