NOTES

1 ALL DIMENSIONS ARE IN MM


2 DO NOT SCALE THIS DRAWING
3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT
ARCHITECTURAL AND STRUCTURAL DRAWINGS
4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS
AND DIMENSIONS ON SITE BEFORE STARTING WORKS
5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE
ARCHITECT IMMEDIATELY IN WRITING
6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS
PLEASE REFER CONSULTANTS' DRAWINGS
7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING
THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY
OF THE CONTRACTOR

NORTH

PLANTS DOOR SCHEDULE

No. Width Height Lintel Quantity Material/Remarks

GENTS WORKERS ROOM LADIES WORKERS ROOM


WINDOW SCHEDULE

No. Width Height Cill Quantity Material/Remarks

OPENING SCHEDULE

UP
No. Width Height Cill Quantity Material/Remarks

MEETING ROOM
FEMALE TOILET

WAITING AREA WITH LANDSCAPE

STORE ROOM
FINISHES SCHEDULE
No. FLOOR No. WALL No. CEILING

MALE TOILET

DN

UP

C dd/mm/yy

B dd/mm/yy Decscribe modifications

A dd/mm/yy Decscribe modifications

REV DATE COMMENTS

ARCHITECT

CHEEKOTI VIVEK
3RD YEAR SEM 5
YELLOW BATCH
SMEF's BRICK SCHOOL of ARCHITECTURE

PLOT: NUMBER AREA: FRIEND SHIP GARDEN


PROJECT:
ADMINISTRATIVE BLOCK.

DRG. TITLE:

A TITLE :FIRST FLOOR PLAN LINE 1


A-201 LINE 2
SCALE 1: 50 LINE 3
SCALE: 1:50 KEY IN: cad file name
DATE: 14/07/2020 PLOTTED ON: xx/xx/xx
DRAWN BY: CHECKED BY: APPROVED BY:
CHEEKOTI VIVEK

ISSUED FOR: CONSTRUCTION

PROJECT NO. : 1
DRG. NO.: REV.

DRGNo A
NOTES

1 ALL DIMENSIONS ARE IN MM


2 DO NOT SCALE THIS DRAWING
3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT
ARCHITECTURAL AND STRUCTURAL DRAWINGS
4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS
AND DIMENSIONS ON SITE BEFORE STARTING WORKS
5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE
ARCHITECT IMMEDIATELY IN WRITING
6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS
PLEASE REFER CONSULTANTS' DRAWINGS
7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING
THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY
OF THE CONTRACTOR

PLANTS
NORTH

DOOR SCHEDULE

No. Width Height Lintel Quantity Material/Remarks

MANAGERS CABIN

OFFICE STAFF

WINDOW SCHEDULE

No. Width Height Cill Quantity Material/Remarks

UP
FEMALE TOILET PANTRY/CAFE
OPENING SCHEDULE
WAITING AREA WITH LANDSCAPE No. Width Height Cill Quantity Material/Remarks
BACK OFFICE

RECEPTION
MALE TOILET

FINISHES SCHEDULE
No. FLOOR No. WALL No. CEILING

COVERED PASSAGE

UP

C dd/mm/yy

B dd/mm/yy Decscribe modifications

A dd/mm/yy Decscribe modifications

REV DATE COMMENTS

ARCHITECT

CHEEKOTI VIVEK
3RD YEAR SEM 5
YELLOW BATCH
SMEF's BRICK SCHOOL of ARCHITECTURE

PLOT: NUMBER AREA: FRIEND SHIP GARDEN


PROJECT:
ADMINISTRATIVE BLOCK.

DRG. TITLE:

A TITLE :GROUND FLOOR PLAN LINE 1


A-201 LINE 2
SCALE 1: 50 LINE 3
SCALE: 1:50 KEY IN: cad file name
DATE: 14/07/2020 PLOTTED ON: xx/xx/xx
DRAWN BY: CHECKED BY: APPROVED BY:
CHEEKOTI VIVEK

ISSUED FOR: CONSTRUCTION

PROJECT NO. : 1
DRG. NO.: REV.

DRGNo A