Documente Academic
Documente Profesional
Documente Cultură
Size 14 m. x 18 m. 12 m. x 16 m.
(Kyat) (Kyat)
1 Project Management 9900000 9900000
2 Logistics -Tower/Shelter/Genset 3750000 3000000
3 Site AC Power Permitting 500000
Civil, Mechanical and Electrical Works-GF
4 31918180 28482480
Indoor
5 Tower Foundation Works 340950000 268950000
6 Tower Erection Works 7200000 5700000
7 Tower Painting Works 5700000 4650000
10 m. x 14 m. 9 m. x 12 m. 9 m. x 9 m.
(Kyat) (Kyat) (Kyat)
9900000 9900000 9900000
3000000 2400000 2400000
lot 9900000
2 LOGISTICS
Ref. SCOPE OF WORKS DESCRIPTION UOM
LOGISTICS
Transportation of Tower+CKD Shelter (3m x 4m x 2.8m)+Generator (10-25 KVA)+Relevant accessories that are
2.1 supplied by Ericsson required for Civil work as per the BOQ from E/// warehouese in Yangon to sites within 1
Yangon City only
Transportation of Tower+Generator (10-25 KVA)/CKD Shelter (3m x 4m x 2.8m) +Relevant accessories that are
2.2 supplied by Ericsson required for Civil work as per the BOQ from E/// warehouese in Yangon to sites within 1
Yangon City only
2.3 Transportation of Tower+Relevant accessories that are supplied by Ericsson required for Civil work as per the 1
BOQ from E/// warehouese in Yangon to sites within Yangon City only
Note
Regional factor will be added on logistics costs
For any extra ordinary site with helocopter or other requirement shall be paid extra @ actual basis
For GF Tower For GF Tower For Tower
30m-50m 50m-80m >100 m
QTY Unit Price Unit Price Unit Price
(Kyat) (Kyat) (Kyat)
1 500000
Ref
CIVIL, MECHANICAL AND ELECTRICAL
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26
GREENFIELD INDOOR - CIVIL, MECHANICAL AND ELECTRICAL IMPLEMENTATION
lot 340000 1 1 1 1
lot 2040000 1 1 1 1
lot 510000 1 1 1 1
lot 510000 1 1 1 1
lot 850000 1 1 1 1
m 102000 61 53 45 0
set 340000 1 1 1 0
lot 2040000 1 1 1 1
lot 340000 1 1 1 1
m 25500 30 30 30 30
set 2210000 2 2 1 1
set 340000 1 1 1 1
set 68000 6 6 6 6
m 10200 83 74 66 58
set 51000 1 1 1 1
set 119000 3 3 3 3
m 238000 7 6 5 4
sq. m. 42500 1 1 1 1
cu. M. 44200 1 1 1 1
set 1700000 1 1 1 1
set 2210000 1 1 1 1
set 2550000 1 1 1 1
lot 1190000 1 1 1 1
SST-30M Medium/Light SST-100M Heavy SST-80M Heavy SST-60M Heavy SST-45M Medium/Light
9 m. x 9 m. 14 m. x 18 m. 12 m. x 16 m. 10 m. x 14 m. 9 m. x 12 m.
QTY Total Price Total Price Total Price Total Price
31918180 28482480 23152300 17368390
1
1
1
SST-30M Medium/Light
9 m. x 9 m.
Total Price
15331365
340000
2040000
510000
510000
0
850000
61965
255000
3029400
2040000
340000
0
765000
2210000
0
340000
408000
510000
51000
357000
714000
5 GREENFIELD TOWER FOUNDATION UOM
1 Foundation for SST Self Support Tower 30m Light Load _160kmh cu.m.
Foundation for SST Self Support Tower 30m Light Load _210kmh cu.m.
2
Foundation for SST Self Support Tower 30m Medium Load _160kmh cu.m.
3 Foundation for SST Self Support Tower 30m Medium Load _210kmh cu.m.
Foundation for SST Self Support Tower 45m Light Load _160kmh cu.m.
4
Foundation for SST Self Support Tower 45m Light Load _210kmh cu.m.
5 Foundation for SST Self Support Tower 45m Medium Load _160kmh cu.m.
Foundation for SST Self Support Tower 45m Medium Load _210kmh cu.m.
6
Foundation for SST Self Support Tower 60m_Medium Load _160kmh cu.m.
7 Foundation for SST Self Support Tower 60m_Medium Load _210kmh cu.m.
Foundation for SST Self Support Tower 60m_Heavy Load _160kmh cu.m.
7
Foundation for SST Self Support Tower 60m_Heavy Load _210kmh cu.m.
8 Foundation for SST Self Support Tower 80m_Heavy Load _160kmh cu.m.
Foundation for SST Self Support Tower 80m_Heavy Load _210kmh cu.m.
9
Foundation for SST Self Support Tower 100m_Heavy Load _160kmh cu.m.
10 Foundation for SST Self Support Tower 100m_Heavy Load _210kmh cu.m.
SCOPE OF WORKS:
- Supply and Construction of Reinforced Concrete Mat Foundation, with reinforcing bars, works
includes but not limited to the following:
- excavation and backfilling works
- shoring and dewatering
- formworks and plastering works
- lean concreting
- supply of gravel bedding
- non-shrink grout
- Provision for material testing
- Provision for Structural Certification
SCOPE OF WORKS:
- Installation and Erection works will comply with the requirements of the AISC –
American Institute of Steel Construction.
- In the assembly of towers and poles all parts are to fit smoothly into positions without
any deformation or bending
- Assembly will be subjected to bolt tightening test and verticality test
Unit Price Total Price
Qty (Kyat) (Kyat)
1 2700000 2700000
1 2700000 2700000
1 3000000 3000000
1 3000000 3000000
1 3750000 3750000
1 3750000 3750000
1 4050000 4050000
1 4050000 4050000
1 4500000 4500000
1 4500000 4500000
1 4800000 4800000
1 4800000 4800000
1 5700000 5700000
1 6000000 6000000
1 7200000 7200000
1 7500000 7500000
7 GREENFIELD TOWER PAINTING UOM
7.1 SST Self Support Tower 30m Light Load _160kmh lot
7.2 SST Self Support Tower 30m Light Load _210kmh lot
7.3 SST Self Support Tower 30m Medium Load _160kmh lot
7.4 SST Self Support Tower 30m Medium Load _210kmh lot
7.5 SST Self Support Tower 45m Light Load _160kmh lot
7.6 SST Self Support Tower 45m Light Load _210kmh lot
7.7 SST Self Support Tower 45m Medium Load _160kmh lot
7.8 SST Self Support Tower 45m Medium Load _210kmh lot
7.9 SST Self Support Tower 60m_Medium Load _160kmh lot
7.10 SST Self Support Tower 60m_Medium Load _210kmh lot
7.11 SST Self Support Tower 60m_Heavy Load _160kmh lot
7.12 FSST Self Support Tower 60m_Heavy Load _210kmh lot
7.13 SST Self Support Tower 80m_Heavy Load _160kmh lot
7.14 SST Self Support Tower 80m_Heavy Load _210kmh lot
7.15 SST Self Support Tower 100m_Heavy Load _160kmh lot
7.16 SST Self Support Tower 100m_Heavy Load _210kmh lot
SCOPE OF WORKS:
- Painting shall conform to the ICAO and CAA regulations for the region
deployed.
- One layer of undercoat used to ensure adherence between primer and zinc
coating surface of steel
- Minimum 2nr layer of top coat compatible with undercoat and primer
- All painting shall be guaranteed for a minimum of 5 years from date of
application against peeling, blistering and fading
Unit Price Total Price
Qty (Kyat) (Kyat)
1 1800000 1800000
1 1800000 1800000
1 1800000 1800000
1 1800000 1800000
1 2250000 2250000
1 2250000 2250000
1 2550000 2550000
1 2550000 2550000
1 3450000 3450000
1 3450000 3450000
1 3750000 3750000
1 3750000 3750000
1 4650000 4650000
1 4650000 4650000
1 5700000 5700000
1 5700000 5700000