Size 6 m. x 6 m.
(Kyat)
1 Project Management 9900000
2 Logistics -Tower/Shelter/Genset 2400000
3 Site AC Power Permitting 500000
Civil, Mechanical and Electrical Works-GF
5 13729540
Outdoor
7 Tower Foundation Works 31050000
8 Tower Erection Works 4500000
9 Tower Painting Works 3375000
Total 65454540
SST-30M
Medium/Light
5 m. x 5 m.
(Kyat)
9900000
2400000
500000
13268925
15468750
2700000
2250000
46487675
GREENFIELD OUTDOOR- PROJECT MANAGEMENT
Ref. SCOPE OF WORKS DESCRIPTION
PROJECT MANAGEMENT
Management of the end to end roll-out of the project in accordance with Customers requirements and
processes, works includes but not limited to the following:
Provision of Skilled and appropriately trained resources in the regions such Draftspersons,
Engineers, Fabricators, Riggers, Project Managers, Planning and Installation Engineers, and
Supervisors to undertake the work
Provision of Site Supervisors to be onsite at all times to oversee and coordinate the on site works.
Management and coordination of all staff, subcontractors and suppliers involved in the works.
1 Provision of all necessary safety training and safety equipment to staff (Including Helmets, Safety
Harnesses, etc.) to undertake the works.
Attend project meetings and provide progress reports and updates as required.
Risk Management
Quality Control, Inspection and Audit
Site Verification and Acceptance
Co-ordination, Escalation and Tracking
UOM QTY Unit Price
(Kyat)
1 lot 9900000
2 LOGISTICS
Ref. SCOPE OF WORKS DESCRIPTION UOM
LOGISTICS
Transportation of Tower+CKD Shelter (3m x 4m x 2.8m)+Generator (10-25 KVA)+Relevant accessories that are
2.1 supplied by Ericsson required for Civil work as per the BOQ from E/// warehouese in Yangon to sites within 1
Yangon City only
Transportation of Tower+Generator (10-25 KVA)/CKD Shelter (3m x 4m x 2.8m) +Relevant accessories that are
2.2 supplied by Ericsson required for Civil work as per the BOQ from E/// warehouese in Yangon to sites within 1
Yangon City only
2.3 Transportation of Tower+Relevant accessories that are supplied by Ericsson required for Civil work as per the 1
BOQ from E/// warehouese in Yangon to sites within Yangon City only
Note
Regional factor will be added on logistics costs
For any extra ordinary site with helocopter or other requirement shall be paid extra @ actual basis
For GF Tower
30m-50m
QTY Unit Price
(Kyat)
lot $ 2,400,000
lot $ 2,250,000
lot $ 2,100,000
GREENFIELD OUTDOOR-POWER CONNECTION
Ref. SCOPE OF WORKS DESCRIPTION UOM
SITE ACQUISITION
SITE AC POWER PERMITTING
Facilitation for Right of Way- Permanent/Temporary Power for installation of Power Poles,
Temporary Power Agreement / Memorandum of Agreement.
- (preparation, application, processing of any and all relative activity in securing the permanent
power connection with electric company)
3 - secure approved right of way (row) for the installation of power line system. This includes the
lot
trimming, removal, uprooting of trees and other possible obstructions
- facilitation and submission of power contract agreement, MOA, meter base, meter no., meter base
serial no., transformer and its corresponding warranty between the customer and electric company
(This price is on ly for the service provided to obtain the power connection and is exclusive of any
or every Governtment or other related fees which will be paid @ actual)
QTY Unit Price
(Kyat)
1 500000
4
Ref
CIVIL, MECHANICAL AND ELECTRICAL
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17
GREENFIELD OUTDOOR- CIVIL, MECHANICAL AND ELECTRICAL IMPLEMENTATION
m 3400 30 30 102000
set 119000 3 3
357000
set 340000
SST-30M Medium/Light
5 m. x 5 m.
Total Price
13268925
255000
2040000
510000
510000
850000
19125
85000
0
935000
102000
4250000
2210000
340000
408000
346800
51000
357000
GREENFIELD TOWER FOUNDATION UOM
1 Foundation for SST Self Support Tower 30m Light Load _160kmh cu.m.
2 Foundation for SST Self Support Tower 30m Light Load _210kmh cu.m.
3 Foundation for SST Self Support Tower 30m Medium Load _160kmh cu.m.
4 Foundation for SST Self Support Tower 30m Medium Load _210kmh cu.m.
5 Foundation for SST Self Support Tower 45m Light Load _160kmh cu.m.
6 Foundation for SST Self Support Tower 45m Light Load _210kmh cu.m.
7 Foundation for SST Self Support Tower 45m Medium Load _160kmh cu.m.
8 Foundation for SST Self Support Tower 45m Medium Load _210kmh cu.m.
SCOPE OF WORKS:
- Supply and Construction of Reinforced Concrete Mat Foundation, with reinforcing bars, works
includes but not limited to the following:
- excavation and backfilling works
- shoring and dewatering
- formworks and plastering works
- lean concreting
- supply of gravel bedding
- non-shrink grout
- Provision for material testing
- Provision for Structural Certification