Sunteți pe pagina 1din 19

SST-45M

Ref Site Model-Outdoor


Medium/Light

Size 6 m. x 6 m.
(Kyat)
1 Project Management 9900000
2 Logistics -Tower/Shelter/Genset 2400000
3 Site AC Power Permitting 500000
Civil, Mechanical and Electrical Works-GF
5 13729540
Outdoor
7 Tower Foundation Works 31050000
8 Tower Erection Works 4500000
9 Tower Painting Works 3375000
Total 65454540
SST-30M
Medium/Light

5 m. x 5 m.
(Kyat)
9900000
2400000
500000

13268925
15468750
2700000
2250000
46487675
GREENFIELD OUTDOOR- PROJECT MANAGEMENT
Ref. SCOPE OF WORKS DESCRIPTION
PROJECT MANAGEMENT
Management of the end to end roll-out of the project in accordance with Customers requirements and
processes, works includes but not limited to the following:
Provision of Skilled and appropriately trained resources in the regions such Draftspersons,
Engineers, Fabricators, Riggers, Project Managers, Planning and Installation Engineers, and
Supervisors to undertake the work
Provision of Site Supervisors to be onsite at all times to oversee and coordinate the on site works.
Management and coordination of all staff, subcontractors and suppliers involved in the works.
1 Provision of all necessary safety training and safety equipment to staff (Including Helmets, Safety
Harnesses, etc.) to undertake the works.
Attend project meetings and provide progress reports and updates as required.
Risk Management
Quality Control, Inspection and Audit
Site Verification and Acceptance
Co-ordination, Escalation and Tracking
UOM QTY Unit Price
(Kyat)

1 lot 9900000
2 LOGISTICS
Ref. SCOPE OF WORKS DESCRIPTION UOM
LOGISTICS
Transportation of Tower+CKD Shelter (3m x 4m x 2.8m)+Generator (10-25 KVA)+Relevant accessories that are
2.1 supplied by Ericsson required for Civil work as per the BOQ from E/// warehouese in Yangon to sites within 1
Yangon City only
Transportation of Tower+Generator (10-25 KVA)/CKD Shelter (3m x 4m x 2.8m) +Relevant accessories that are
2.2 supplied by Ericsson required for Civil work as per the BOQ from E/// warehouese in Yangon to sites within 1
Yangon City only
2.3 Transportation of Tower+Relevant accessories that are supplied by Ericsson required for Civil work as per the 1
BOQ from E/// warehouese in Yangon to sites within Yangon City only

Note
Regional factor will be added on logistics costs
For any extra ordinary site with helocopter or other requirement shall be paid extra @ actual basis
For GF Tower
30m-50m
QTY Unit Price
(Kyat)

lot $ 2,400,000

lot $ 2,250,000

lot $ 2,100,000
GREENFIELD OUTDOOR-POWER CONNECTION
Ref. SCOPE OF WORKS DESCRIPTION UOM
SITE ACQUISITION
SITE AC POWER PERMITTING
Facilitation for Right of Way- Permanent/Temporary Power for installation of Power Poles,
Temporary Power Agreement / Memorandum of Agreement.
- (preparation, application, processing of any and all relative activity in securing the permanent
power connection with electric company)
3 - secure approved right of way (row) for the installation of power line system. This includes the
lot
trimming, removal, uprooting of trees and other possible obstructions
- facilitation and submission of power contract agreement, MOA, meter base, meter no., meter base
serial no., transformer and its corresponding warranty between the customer and electric company
(This price is on ly for the service provided to obtain the power connection and is exclusive of any
or every Governtment or other related fees which will be paid @ actual)
QTY Unit Price
(Kyat)

1 500000
4

Ref
CIVIL, MECHANICAL AND ELECTRICAL

4.1
4.2
4.3
4.4

4.5

4.6
4.7

4.8

4.9

4.10

4.11

4.12
4.13

4.14

4.15

4.16

4.17
GREENFIELD OUTDOOR- CIVIL, MECHANICAL AND ELECTRICAL IMPLEMENTATION

SCOPE OF WORKS DESCRIPTION


CIVIL, MECHANICAL AND ELECTRICAL
GENERAL REQUIREMENT
SITE ENGINEERING
Mobilization / Demobilization
Soil Investigation including analysis and report; drilled to a minimum depth of 10m below the surface level, 1 bore hole
Site specific detail design package (site layouts, sections, foundations, fencing, access roads)
Structural Design and Certification (Professional Engineer endorsement)
DOCUMENTATION
Site Folder, As-built, COC, Digital Photos ,Certificates, test results etc. on completion
SITE DEVELOPMENT WORKS - INDOOR
SITE CLEARING WORKS
Clearing and Grubbing, includes removing of trees and shrubs; clearing and disposal of all unsuitable materials within the
site proper; and demolition of existing concrete or wooden structure
Site Cleaning after Construction (Greenfields)
GROUND COVERING
100mm thick gravel (crushed stone)
SITE AC WORKS
POWER SERVICE ENTRANCE
Supply and install OverHead Power Cable NYY 2x16 sq.mm. 750V. From Meter to MDB With Accessories
AVIATION LIGHT SOLAR TYPE
Supply and install Solar Type LED Based Aviation Obstruction Lights, IP65, ICAO Standard, aviation red (top and
midlight for 50m ht - above)
MDB
Supply and install of Main Distribution Box 50AT100AF, 1Phase; Enclosure: IP55;
SITE GROUNDING WORKS
Supply & Installation of lightning rod >= 1.2 m. on tower top
Supply & Installation of ground rods, 20mm dia. X 3000mm long copper clad, copper earth electrodes
Supply and Install 50 sqmm stranded bare copper wire for ground ring (at tower and shelter), electrical panels earthing
and perimeter earthing - wire shall be cadwelded
Supply and Construct 300x300x400mm inside dimension, Ground test pit complete with galvanized steel plate cover with
handle and lock
Supply and Install 300mm x 100mm x 6mm copper plate with 32 pre-drilled holes busbar pure copper
- Complete w/ stainless bolts/nuts/ washers· Crimp type terminal lugs (stainless steel/copper/bronze) for connecting the
ground wire to the collect bar· Apple Insulator w/ mounting bolts & brackets.
Protective Roof for Outdoor RBS
Supply and construct of Zinc covered corrogated sheet, 2m x 3m inclusive of necessary suuport on four
sides located on the tower platform;
PLEMENTATION

Unit Price SST-45M Medium/Light SST-30M Medium/Light SST-45M Medium/Light


LOT SIZE (Kyat) 6 m. x 6 m. 5 m. x 5 m. 6 m. x 6 m.
UOM QTY QTY Total Price
D ELECTRICAL 13729540

lot 255000 1 1 255000


lot 2040000 1 1 2040000
lot 510000 1 1 510000
lot 510000 1 1 510000

lot 850000 1 1 850000

sq. m. 765 36 25 27540


lot 85000 1 1 85000
0
cu. M. 374000 3.6 2.5 1346400

m 3400 30 30 102000

set 4250000 1 1 4250000

set 2210000 1 1 2210000

set 340000 1 1 340000


set 68000 6 6 408000
m 10200 38 34 387600
set 51000 1 1 51000

set 119000 3 3
357000

set 340000
SST-30M Medium/Light
5 m. x 5 m.
Total Price
13268925

255000
2040000
510000
510000

850000

19125
85000
0
935000

102000

4250000

2210000

340000
408000

346800

51000

357000
GREENFIELD TOWER FOUNDATION UOM
1 Foundation for SST Self Support Tower 30m Light Load _160kmh cu.m.

2 Foundation for SST Self Support Tower 30m Light Load _210kmh cu.m.

3 Foundation for SST Self Support Tower 30m Medium Load _160kmh cu.m.

4 Foundation for SST Self Support Tower 30m Medium Load _210kmh cu.m.

5 Foundation for SST Self Support Tower 45m Light Load _160kmh cu.m.

6 Foundation for SST Self Support Tower 45m Light Load _210kmh cu.m.

7 Foundation for SST Self Support Tower 45m Medium Load _160kmh cu.m.

8 Foundation for SST Self Support Tower 45m Medium Load _210kmh cu.m.

SCOPE OF WORKS:

- Supply and Construction of Reinforced Concrete Mat Foundation, with reinforcing bars, works
includes but not limited to the following:
- excavation and backfilling works
- shoring and dewatering
- formworks and plastering works
- lean concreting
- supply of gravel bedding
- non-shrink grout
- Provision for material testing
- Provision for Structural Certification

Concrete strength as a minimum


3,000 PSI @ 28 days – Equipment plinth and support structures
2,500 PSI @ 28 days – Any slab on fill, boundary wall foundation and other works

1 Cement used is to be Portland Cement Type-1 ASTMC-150


2 Aggregates are to conform to ASTM C33 07 – Standard Specification for Concrete
Aggregates and as a minimal conforms as follows:-
Fine Aggregate – well graded, clean and free from sand and organic and other detrimental
material
Coarse Aggregate – well graded, maximum size of 20mm, for Greenfield footings this can
be maximum 40mm
Ready Mix Concrete will be in accordance with ASTM C94/94M – 07 Standard
3 Specification for Ready Mixed Concrete
4 Consider 115 kg/cu.m of steel
Reinforcement
>16 mm dia; fy=60,000 PSI
<12 mm dia; fy=40,000 PSI
Provide Non Shrink Grout
Unit Price Total Price
Qty (Kyat) (Kyat) Remarks
20.63 750000 15468750 estimate only

26.25 750000 19687500 estimate only

30.00 750000 22500000 estimate only

37.40 750000 28048500 estimate only

41.40 750000 31050000 estimate only

51.00 750000 38250000 estimate only

53.00 750000 39750000 estimate only

62.25 750000 46686000 estimate only


GREENFIELD TOWER ERECTION UOM
1 SST Self Support Tower 30m Light Load _160kmh lot
2 SST Self Support Tower 30m Light Load _210kmh lot
3 SST Self Support Tower 30m Medium Load _160kmh lot
4 SST Self Support Tower 30m Medium Load _210kmh lot
5 SST Self Support Tower 45m Light Load _160kmh lot
6 SST Self Support Tower 45m Light Load _210kmh lot
7 SST Self Support Tower 45m Medium Load _160kmh lot
8 SST Self Support Tower 45m Medium Load _210kmh lot
SCOPE OF WORKS:
- Installation and Erection works will comply with the requirements of the AISC –
American Institute of Steel Construction.
- In the assembly of towers and poles all parts are to fit smoothly into positions without
any deformation or bending
- Assembly will be subjected to bolt tightening test and verticality test
Unit Price Total Price
Qty (Kyat) (Kyat)
1 2700000 2700000
1 3000000 3000000
1 3300000 3300000
1 3750000 3750000
1 4500000 4500000
1 5250000 5250000
1 5550000 5550000
1 6000000 6000000
GREENFIELD TOWER PAINTING UOM
1 SST Self Support Tower 30m Light Load _160kmh lot
2 SST Self Support Tower 30m Light Load _210kmh lot
3 SST Self Support Tower 30m Medium Load _160kmh lot
4 SST Self Support Tower 30m Medium Load _210kmh lot
5 SST Self Support Tower 45m Light Load _160kmh lot
6 SST Self Support Tower 45m Light Load _210kmh lot
7 SST Self Support Tower 45m Medium Load _160kmh lot
8 SST Self Support Tower 45m Medium Load _210kmh lot
SCOPE OF WORKS:
- Painting shall conform to the ICAO and CAA regulations for the region
deployed.
- One layer of undercoat used to ensure adherence between primer and zinc
coating surface of steel
- Minimum 2nr layer of top coat compatible with undercoat and primer
- All painting shall be guaranteed for a minimum of 5 years from date of
application against peeling, blistering and fading
Unit Price Total Price
Qty (Kyat) (Kyat)
1 2250000 2250000
1 2550000 2550000
1 2700000 2700000
1 3000000 3000000
1 3375000 3375000
1 3750000 3750000
1 3975000 3975000
1 4050000 4050000