Ref Site Model RTT-POLE-3m

1 Project Management 5300000


2 Logistics
3 Site AC Power Permitting 500000
Civil, Mechanical and Electrical Works -
4 5678000
Rooftop - Outdoor BTS Base
5 Pole Foundation 1122000
6 Pole Erection Works 850000

Total 13450000
RTT-POLE-6m RTT-POLE-9m

5300000 5300000

500000 500000

5678000 5729000
1122000 1683000
1190000 1530000

13790000 14742000
1 ROOFTOP- PROJECT MANAGEMENT
Ref. SCOPE OF WORKS DESCRIPTION
PROJECT MANAGEMENT
Management of the end to end roll-out of the project in accordance with Customers requirements and processes,
works includes but not limited to the following:
Provision of Skilled and appropriately trained resources in the regions such Draftspersons, Engineers,
Fabricators, Riggers, Project Managers, Planning and Installation Engineers, and Supervisors to
undertake the work
Provision of Site Supervisors to be onsite at all times to oversee and coordinate the on site works.
Management and coordination of all staff, subcontractors and suppliers involved in the works.
1 Provision of all necessary safety training and safety equipment to staff (Including Helmets, Safety
Harnesses, etc.) to undertake the works.
Attend project meetings and provide progress reports and updates as required.
Risk Management
Quality Control, Inspection and Audit
Site Verification and Acceptance
Co-ordination, Escalation and Tracking
UOM QTY Unit Price
(Kyat)

1 lot 5300000
2 LOGISTICS
Ref. SCOPE OF WORKS DESCRIPTION UOM
LOGISTICS
Transportation of Tower+CKD Shelter (3m x 4m x 2.8m)+Generator (10-25 KVA)+Relevant accessories that are
2.1 supplied by Ericsson required for Civil work as per the BOQ from E/// warehouese in Yangon to sites within 1
Yangon City only
Transportation of Tower+Generator (10-25 KVA)/CKD Shelter (3m x 4m x 2.8m) +Relevant accessories that are
2.2 supplied by Ericsson required for Civil work as per the BOQ from E/// warehouese in Yangon to sites within 1
Yangon City only
2.3 Transportation of Tower+Relevant accessories that are supplied by Ericsson required for Civil work as per the 1
BOQ from E/// warehouese in Yangon to sites within Yangon City only

Note
Regional factor will be added on logistics costs
For any extra ordinary site with helocopter or other requirement shall be paid extra @ actual basis
For RT Pole
3m/6m/9m
QTY Unit Price
(Kyat)

lot $ 1,190,000

lot $ 1,105,000

lot $ 1,020,000
3 ROOFTOP -POWER CONNECTION
Ref. SCOPE OF WORKS DESCRIPTION UOM
SITE AC POWER PERMITTING
Facilitation for Right of Way- Permanent/Temporary Power for installation
of Power Poles, Temporary Power Agreement / Memorandum of
Agreement.
- (preparation, application, processing of any and all relative activity in
securing the permanent power connection with electric company)
- secure approved right of way (row) for the installation of power line
system. This includes the trimming, removal, uprooting of trees and other
3 lot
possible obstructions
- facilitation and submission of power contract agreement, MOA, meter
base, meter no., meter base serial no., transformer and its corresponding
warranty between the customer and electric company
(This price is only for the service provided to obtain the power connection
and is exclusive of any or every Governtment or other related fees which
will be paid @ actual)
QTY Unit Price
(Kyat)

1 500000
4

4.1
4.2
4.3
4.4

4.5

4.6
4.7

4.8

4.9

4.10

4.11
4.12
4.13
4.14

4.15

4.16

4.17
ROOFTOP- CIVIL, MECHANICAL AND ELECTRICAL IMPLEMENTATION

SCOPE OF WORKS DESCRIPTION


GENERAL REQUIREMENT
SITE ENGINEERING
Mobilization / Demobilization
Structural Building Analysis including report
Site specific detail design package (site layouts, sections, equipment location, etc.)
Structural Design for pole and BTS foundation and Certification (Professional Engineer endorsement)
DOCUMENTATION
Site Folder, As-built, COC, Digital Photos ,Certificates, test results etc. on completion
SITE DEVELOPMENT WORKS - OUTDOOR
SITE CLEARING WORKS
Site Cleaning after Construction (Rooftops) includes restoration of affected areas
Supply and Install Waterproofing membrame on Roofdeck
SUPPLY AND INSTALL I-BEAM FOR OUTDOOR BTS BASE
Supply and install steel foundation I-beams for outdoor equipment includes:
- supply and installation of Chemical Anchor Bolts (Hilti or approved equivalent)
- Scabbling of existing concrete to expose reinforcement.
- Concrete works to cast in the hold-down bolts
- All waterproofing and sealing works
SITE AC WORKS
POWER SERVICE ENTRANCE
Supply and install OverHead Power Cable THW 2x16 sq.mm. 750V. In PVC conduit Dia. 3/4" From Meter to
MDB With Accessories and fixing
MDB
Supply and install of Main Distribution Box 50AT100AF, 1Phase; Enclosure: IP55;
SITE GROUNDING WORKS
Supply & Installation of lightning rod >= 1.2 m. on Pole top
Supply & Installation of ground rods in the pit which will be on the ground, 20mm dia. X 3000mm long copper clad, copper earth
electrodes
Supply and Install 50 sqmm stranded bare copper wire for ground ring (at pole and Enclosure) including caldweld works, inside PVC
pipe including fixings
Supply and Construct 300x300x400mm inside dimension, Ground test pit complete with galvanized steel plate cover with handle and
lock
Supply and Install 300mm x 100mm x 6mm copper plate with 32 pre-drilled holes busbar pure copper
- Complete w/ stainless bolts/nuts/ washers· Crimp type terminal lugs (stainless steel/copper/bronze) for connecting the ground wire to
the collect bar· Apple Insulator w/ mounting bolts & brackets.
OUTDOOR CABLE LADDER
Supply and install cable tray with cover 400mm wide, inclusive of fixing accessories
Optional
SUPPLY AND INSTALL STEEl PLATFORM FOR OUTDOOR BTS BASE
A steel gridded platform is to be supplied that is capable of supporting the main equipment from Ericsson. This will be installed on
rooftop. Dimensions are 2mx3m, weight of equipment and maintenance engineers will be 600kg
Unit Price RTT-POLE-3m RTT-POLE-6m RTT-POLE-9m
UOM (Kyat) QTY QTY QTY

lot 85000 1 1 1
lot 510000 1 1 1
lot 510000 1 1 1
lot 510000 1 1 1

lot 255000 1 1 1

lot 51000 1 1 1
sq. m. 34000 1 1 1

lot 170000 1 1 1

m 25500 40 40 40

set 2210000 1 1 1

set 340000 1 1 1
set 68000 1 1 1
m 10200 50 45 40
set 51000 1 1 1

set 119000 2 2 2

m 238000 6 6 6

Set 170000
RTT-POLE-3m RTT-POLE-6m RTT-POLE-9m
Total Price Total Price Total Price
5780000 5729000 5678000

85000 85000 85000


510000 510000 510000
510000 510000 510000
510000 510000 510000

255000 255000 255000

51000 51000 51000


34000 34000 34000

170000 170000 170000

1020000 1020000 1020000


0 0 0

0 0 0
340000 340000 340000
68000 68000 68000
510000 459000 408000
51000 51000 51000

238000 238000 238000

1428000 1428000 1428000


5 POLE Foundation UOM Qty

cu.m. 0.2
5.1 Pole 3m_Dia 6 inch

cu.m. 0.2
5.2 Pole 6m_Dia 6 inch

cu.m. 0.3
5.3 Pole 9m_Dia 6 inch
SCOPE OF WORKS:

- Supply and Construction of Reinforced Concrete Pedestal,


works includes but not limited to the following:
- formworks and plastering works
- non-shrink grout
- supply and installation of Chemical Anchor Bolts (Hilti
or approved equivalent) for guyed tower and deadman
- Scabbling of existing concrete to expose reinforcement.
- Concrete works to cast in the hold-down bolts
- All waterproofing and sealing works
- Provision for material testing
- Provision for Structural Certification

Concrete strength as a minimum


3000 PSI@ 28 days – All antenna support structure foundation works
3000 PSI@ 28 days – Equipment plinth and support structures
2400 PSI @ 28 days – Any slab on fill, boundary wall foundation and other works

1 Cement used is to be Portland Cement Type-1 ASTMC-150


Aggregates are to conform to ASTM C33 07 – Standard
2 Specification for Concrete
Aggregates and as a minimal conforms as follows:-
Fine Aggregate – well graded, clean and free from sand
and organic
Coarse and other
Aggregate detrimental
– well material size of
graded, maximum
20mm, for Greenfield footings this can be maximum
40mm
Ready Mix Concrete will be in accordance with ASTM
C94/94M – 07 Standard
3 Specification for Ready Mixed Concrete

Reinforcement
>16 mm dia; fy=60,000 PSI
<12 mm dia; fy=40,000 PSI

Provide Non Shrink Grout


Unit Price Total Price
(Kyat) (Kyat)
estimate only 5610000 1122000

estimate only 5610000 1122000

estimate only 5610000 1683000

and other works


Unit Price
6 ROOFTOP POLE ERECTION UOM Qty (Kyat)
6.1 Pole 3m_Dia 6 inch lot 1 850000
6.2 Pole 6m_Dia 6 inch lot 1 1190000
6.3 Pole 9m_Dia 6 inch lot 1 1530000
SCOPE OF WORKS:
- Installation and Erection works will comply with the requirements of
the AISC – American Institute of Steel Construction.
- In the assembly of towers and guyed mast all parts are to fit
smoothly into positions without any deformation or bending
- Assembly will be subjected to bolt tightening test and verticality test
Total Price
(Kyat)
850000
1190000
1530000