Relationship B e t w e e n B r e a k a g e P a r a m e t e r s and
P r o c e s s Variables in Ball Milling - An Industrial
Case Study
ABSTRACT
Narayanan, S.S., Lean, P.J. and Baker, D.C., 1987. Relationship between breakage parameters
and process variables in ball milling - an industrial case study. Int. J. Miner. Process., 20: 241-251.
The performance of the secondary ball mill at the New Broken Hill Consolidated Ltd. concen-
trator is analysed using the perfect mixing model and an ore-specific breakage distribution func-
tion. This function was determined from single-particlebreakage tests using a computer-monitored
twin pendulum apparatus.
The ratio of the breakage rate to the normalized discharge rate, r/d*, determined for the ball
mill using the ore-specific breakage distribution function for a range of grinding conditions is
related to the mill power consumption. The mill power consumption is related to the percentage
of mill volume occupied by the ball charge and to the percentage of solids in the mill feed.
INTRODUCTION
t R od M i l l
I I Z44m [ ~'-44m [
Fig. 1. A schematic diagram of the NBHC grinding circuit. Analogue outputs: C1, C2 =control of
returns to grinding circuit (RGC) ; C5, C6 = control of ore feed rate.
sump. The addition of RGC ( returns to the grinding circuit; Fig. 1 ) was stopped
during this investigation. This RGC stream carries small yet variable solid
flows such as floor clean up in a large quantity of water. Therefore, control by
water addition alone will have a negligible effect on solids flow but allows steady
state operation.
The data from the NBHC grinding circuit were collected over a wide range
of operating conditions. The flow rate and the size distribution data for the
various streams collected during this study were mass balanced using a com-
puter program available at the Julius Kruttschnitt Mineral Research Centre.
The flow rates and the size distributions of the mass balanced mill feed and
mill discharge data from this study were analysed using a perfect mixing model
( Whiten, 1976 ) and an ore-specific breakage distribution function.
The modern ball mill models describe a ball mill performance using the basic
concepts of brekage rate, breakage distribution and material transport func-
tions ( Austin et al., 1984; Herbst et al., 1982; Whiten, 1976; Narayanan, 1987 ).
All these models use arbitrary or experimentally determined breakage distri-
bution and material transport functions and correlate the breakage rate
parameters with ball milling variables. A detailed comparison of the modern
ball mill models is given in another publication ( Lynch et al., 1986). Since the
243
RANGE OF OPERATINGVARIABLESSTUDIED
The normal operating feed rate of this grinding circuit was 130 tonnes/hour
and the normal ball charge volume was 42.0%. The grinding mill performance
at three ball charge volumes, 37.43, 42.03 and 45.16%, was investigated. Three
feed rates, 105, 130 and 155 tonnes/hour, were studied at each ball charge vol-
ume. These feed rates are the new feed rates to the grinding circuit, i.e. the rod
mill feed rate. A summary of the process variables tested in this study is given
in Table I.
In each survey, the rod mill feed rate, water additions, cyclone overflow den-
sity and cyclone pressure were logged using a Data General computer system.
They were monitored for two hours before the commencement of sampling.
When the circuit reached the steady state condition, indicated by the above
variables remaining constant over the two hour period, the rod mill discharge,
cyclone underflow, ball mill discharge and cyclone overflow streams were sam-
pled over a period of one hour. The ball charge volume, Cv, was determined by
stopping the mill and measuring the distance between the level of the ball
charge and the overflow trunnion. From this measurement and the inside
diameter of the mill, the angle subtended by the ball charge and the percent of
the mill volume occupied by the ball charge were determined using the method
proposed by Arbiter and Harris (1982).
An important observation was that with the increase in the fresh feed rate
to the grinding circuit, the percent solids in the cyclone underflow also increased.
This may be due to the increase in the flow rates of solids which results in
lower residence times for solids. Hence, some particles were not broken at higher
244
TABLE 1
A summary of the grinding circuit surveys conducted at the concentzator of New Broken Hill
Consolidated Limited
Test Circuit feed Cyclone Ball mill feed Ball mill Charge volume
no. rate underflow rate power (', ~
(tonnes/h) ( % solids ) (tonnes/h ) t kWh ) ( ~; !
* 1Percentage of the mill volume occupied by the ball charge including voids.
*~Additional balls inadvertently added to the ball mill.
feed rates and were recirculating in the circuit which influenced the cyclone
underflow density. Another observation was that the power consumption
decreased with increase in the fresh feed rate as shown in Fig.2.
The simplest case of modelling ball mills is by considering the mill as one
perfectly mixed segment ( Whiten, 1976). The grinding process in such a per-
550.00 ...................................
~ 500.00
k--
450.00
4o000
30000
I00.00 120"00 140.0 160-00
CIRCUIT NEW FEED RATE (TONNES/HOUR)
Fig. 2. T h e relationship between the ball mill power consumption and the grinding circuit new
feed rate at three ball charge volumes for the N B H C ball mill.
245
fectly mixed mill can be described in terms of the mass balance of each size
fraction. If n size fractions, usually in a geometric series, are considered, with
1 representing the largest size fraction and n representing the submesh frac-
tions, the equation for the rate of change of the ith size fraction is:
where [i is the mass flow rate of that size fraction in the feed (tonnes/hour);
ri is the breakage rate of that size fraction (1/time); si is the mass of that size
fraction in the mill contents (tonnes); b~j is the mass fraction of the particles
appearing from the breakage of the j t h size fraction and distributed to ith size
fraction; and di is the discharge rate of that size fraction (1/time).
The ith size fraction in the mill product Pi (tonnes/h) is determined from:
gi ~- di Si (2)
The discharge rate d~ is normalized using the volumetric flow rate of the mill
feed V ( solids and water, m3/h ), mill length L ( m ) and mill diameter D ( m )
in an equation of the form:
di =di*(4V/D2L) (3)
The mill contents term S~ can be eliminated by combining the eqns. 1, 2 and
3. Then the ball mill performance can be described by the ratio rJd~* and bii
values.
Usually, a normalized breakage distribution vector with components bi is
used. This concept is based on the assumption that particles of various sizes
break in a similar manner and the b~ values determined for one particle size
can be used for all other particle sizes. In this study, an ore-specific breakage
distribution function determined from single particle breakage tests (Naray-
anan, 1985; Narayanan and Whiten, 1985 ) was used in the analysis. Therefore,
the variation in the ball mill performance can be described by the systematic
changes in the ri/di* function with process conditions.
r/d* and the particle size is described by a smooth cubic spline function with
continuous first and second derivatives. The extrapolation above the maxi-
mum knot value (1.673 ram) or below the minimum knot value (0.106 ram)
is linear with a zero second derivative.
Using the mass balanced data for the mill teed and the mill discharge, the
r/d* values at these three knots are determined by a non-linear fitting program
(Kavetsky and Whiten, pets. commun., 1982). This computer program cal-
culates the particle size distribution in the mill product from the mill teed by
adjusting the three r/d* values at the spline knots such that the sum of' squares
of the residuals between the observed and the predicted particle size distribu-
tions in the mill discharges are minimised.
It was found that the breakage parameters R1, R2 and R3 are related to the
mill power consumption, P (kW), by the following regression equations:
R1=ln(r/d*)o.lo6mm=1.9868*10-4(+/-0.0000382) * (P) (4)
TABLE II
Ore-specific breakage distribution function for the NBHC ore determined from single particle
breakage tests
The accuracy and the application of the two relationships outlined in the
previous section need to be considered separately. The percentage of relative
errors in the power draft measurements is usually lower than the errors
encountered in the measurement of other ball milling variables. However, the
248
J!
Q /"
jrJ
//~. J
I-
O~ 7
~o 450.00
400.00
t- i e ~ ~ i
~_,3500O
!
30000 L I L
300.00 550-00 400. O0 450.00 SO0.O0 f~0.00
OBSERVED POWER CONSUMPTION (KW)
Fig. 3. Comparisonof the observedball mill power consumptionwith the predictions from the
relationship betweenthe mill powerconsumption,ball chargevolumeand percent solids in the
mill feed.
major variable influencing the power consumption of a ball mill is the ball
charge volume. Hence two separate relationships have been proposed from this
analysis.
The first relationship predicts the variation of the breakage parameter, r/d*,
values with the ball mill power consumption through the eqs. 4, 5 and 6. This
relationship was found to give acceptable predictions for the performance of
the NBHC ball mill. An analysis of the accuracy of the mill discharges pre-
dicted from this relationship is presented in a later section.
The second relationship is between the power consumption and the grinding
process variables such as ball charge volume and percent solids. This relation-
ship is expressed by eq. 7. The standard deviations of the coefficients of the
ball charge volume, Cv, and the percent solids, S%, are relatively high at
approximately 20%. This can be due to the inherent errors in the measurement
of the ball charge volume and the difficulty experienced in assessing the num-
ber of various diameter balls present in an industrial ball mill which influences
the nature of ball load. Even though eq. 7 can be used to predict the variation
of mill power with the grinding process variables, further work to develop a
general relationship by analysing similar data from a number of secondary ball
mills is in progress.
The eqs. 4, 5 and 6 predict the spline knot values for the r/d*-particle size
relationship from the mill power consumption. Such a relationship can be used
249
for simulation and control purposes. The accuracy of this relationship can be
analysed by comparing the mill discharges predicted from this relationship
with the observed data.
The In (r/d*) spline knot values determined from the eqs. 4, 5 and 6 and the
laboratory bi values were used in the perfect mixing model to predict the mill
discharge for the nine surveys. The relative error on the volumetric flow rates
of the ith size fraction for jth data set, Eo, was calculated from:
Eii = [ VPij( O ) - VPij( C ) ] / V P o (O) (8)
where V P 0 ( 0 ) and V P o ( C ) are the volumetric flow rates of the ith size frac-
tion in the observed and the calculated mill discharges, respectively, for t h e j t h
data set.
For each size fraction, there will be j errors from the j data sets. In this case
j is equal to nine. The mean and the standard deviation of the j errors for each
size fraction were calculated. If the proposed model is accurate and does not
have any bias, the mean of the errors for each size fraction will be zero. Oth-
erwise, a bias between the model and the observed data can be suspected and
the magnitude of the bias depends on the magnitude of the difference. How-
ever, small differences between the model predictions and the experimental
data may not necessarily be significant.
Since the observed data will contain small random errors, the mean of the
errors for a size fraction should be close to zero. The standard deviation of the
errors for a size fraction should be small, but larger than the corresponding
mean value. Under these conditions, the model predictions are acceptable.
However, if the mean of the errors for a size fraction is approximately zero but
the standard deviation is large relative to the magnitude of the data, it may
suggest that the observed data contains large random errors in that size fraction.
The mean and standard deviations of the errors E 0-for the 14 size fractions
from the nine grinding circuit surveys are given in Table III. Except for the
first two coarsest fractions, the mean of the errors for each size fraction is close
to zero. The standard deviation of each of the errors is larger than its corre-
sponding mean value. In the nine surveys conducted under a wide range of
conditions, the amount of material in the two coarsest fractions was less than
2%. Thus, the mass flow rates of these two coarser fractions is relatively insig-
nificant. The presence of errors in the two coarsest fractions will not signifi-
cantly influence the accuracy of the model predictions. It can be concluded
from this analysis that the relationship developed between the breakage
parameters and the mill power consumption, using the ore-specific breakage
distribution function, gives acceptable predictions and does not have any sig-
nificant bias.
CONCLUSIONS
The performance of the NBHC secondary ball mill was successfully ana-
lysed using the perfect mixing model and the ore-specific breakage distribution
25t~
' F A B L E III
A s u m m a r y of t h e a c c u r a c y a n a l y s i s of t h e p o w e r r/d*modetpredietionsfortheNBHCsecondar}
ball mill d a t a
Size f r a c t i o n M e a n of t h e errors S t a n d a r d d e v i a t i o n o~
(ram) from nine data t h e errors f r o m n i n e
sets d a t a sets
ACKNOWLEDGEMENTS
The authors would like to thank the staff of the New Broken Hill Limited
for their co-operation. Thanks also go to Professor A.J. Lynch, Dr. W.J. Whi-
ten, Dr. D.J. Mckee, Dr. A. Kavetsky and Dr. P.D. Bush for many valuable
discussions. The research work was carried out from the Australian Mineral
Industries Research Association's grant to the Julius Kruttschnitt Mineral
Research Centre and their continued support is gratefully acknowledged.
251
REFERENCES
Arbiter, N. and Harris, C.C., 1982. Scale-up and dynamics of large grinding mills - a case study.
In: A.L. Mular and G.V. Jergensen (Editors), Design and Installation of Comminution Cir-
cuits. SME/AIME, New York, N.Y., pp. 491-508.
Austin, L.G, Klimpel, R.R. and Luckie, P.T., 1984. Process engineering of size reduction: ball
milling. SME/AIME, New York, N.Y., pp. 181-230.
Herbst, J.A., Siddique, M., Rajamani, K. and Sanchez, E., 1982. Population balance approach to
ball mill scale-up: bench and pilot scale investigations. Trans. SME/AIME, 272: 1945-1954.
Laplante, A.R. and Redstone, J., 1983. Modelling of grinding kinetics in Sidbec-Normines Port-
Cartier pelletizing plant. Mini symposium on grinding performance of large ball mills II, Salt
Lake City, Utah, SME/AIME, New York, N.Y., pp. 13-26,
Lynch, A.J., Whiten, W.J. and Narayanan, S.S., 1986. Ball mill models: their evolution and pres-
ent status. In: P. Somasundaran (Editor), Advances in Mineral Processing, Arbiter Sympo-
sium. SME/AIME, Littleton, Colo., pp. 48-66.
Narayanan, S.S., 1985. Development of a laboratory single particle breakage technique and its
application to ball mill modelling and scale-up. Ph.D. thesis, University of Queensland, 209
pp., unpublished.
Narayanan, S.S., 1987. Modelling the performance of industrial ball mills using single particle
breakage data. Int. J. Miner. Process., 20: 211-228.
Narayanan, S.S. and Whiten, W.J., 1985. Determination of comminution characteristics of ores
from single particle breakage tests. Trans. Inst. Min. Metall., Section C, submitted manuscript.
Whiten, W.J., 1976. Ball mill simulation using small calculators. Proc. Australas. Inst. Min. Metall.,
258: 47-53.