6243.291
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
160000
10000 10000 10000 12500 12500 12500 12500 12500 12500 12500 12500 10000 10000 10000
AA BB CC DD EE
48725 48726 48727 48728 48729
160000
10000 20000 25000 25000 25000 25000 20000 10000
PART-1
48705
O-06.1
D-01.2 2575x1975
O-06.2 DPR BOUNDARY LINE
A 2575x1975
STA-01
CMRL LAND TAKE FFL+7.140M
9600
9000
STA-F1 W 1800
BOUNDARY T 300
W 1800
R 150 UP ES-1 PLINTH LEVEL
T 300 D-04.1 ABOVE
R 150 6300
D-05.1 ABOVE
B
6185 D-06.1 ABOVE
FFL+6.990M 4400 MS FENCING WITH
7900
12265
11200
2680
2700 PASSAGE LEVEL
495
C TWO
+7.140M
4665
4700
5400
B2 O-06.5 WHEELER FOOT PATH LEVEL
2000
2000 2575x1975 PARKING
UP
B2
D
2209
3900
3130
7500
7500
STEEL GATE GATE
7270
17300
17300
2300
2300
E
L2 L2
48735 O-06.7 48735
7270
TRACK CENTER
+6.990M
7500
7500
T.H. ROAD +7.140M FFL+7.610M O-06.3 LINE ABOVE
2575x1975 ROAD LEVEL
FOOT PATH LEVEL PLINTH LEVEL O-06.4
F
UP 2575x1975
2000
5455
86285
4710
D-01.6
F'
+7.160M UP STA-F2
6810
W 1800
LEVEL ES-2 T 300
UP R 150
G L1
B2 D-05.5
MS FENCING ESCALATOR L1
D-01.4 WITH 450MM UP PIT BELOW
48730 RAIN WATER 48730
D-04.5 HIGH TOE WALL
HARVESTING STA-02
LAND TAKE
9500
H 10110 3698
DPR BOUNDARY LINE D-01.1 +6.990M
D-06.1 ROAD LEVEL
9010
8500
STA-F3
W 2600
T 300
BOUNDARY R 150
L WALL
B1 REFER REVISION LOG MCR SSA KAS 20-03-2020 SYSTRA MVA CONSULTING (INDIA) PVT.LTD.
ELEVATED STATION -4
S220/X/XXXX/XXX/XXXX
B0 GFC SUBMISSION MCR SSA KAS 27-01-2020 CHENNAI METRO RAIL LTD. 5TH FLOOR, GURU ANGAD BHAWAN, MCR
THIRUVOTRIYUR THERADI METRO -STT (GOWRI ASHRAM-SGA)
A5 CRD SUBMISSION HCH SSA SMA 09-08-2018
ADMINISTRATIVE BUILDING, 71, NEHRU PLACE, NEW DELHI-110019 GROUND LEVEL PLAN
CMRL DEPOT, POONAMALLEE HIGH ROAD, PH: 26422844, 26413310 FAX: 26224204 SSA
KOYAMBEDU, CHENNAI - 600107 (INDIA)
A4 CRD SUBMISSION -FIRST ISSUE RKU SSA SMA 27-03-2017 SUBSIDIARY OF:
KAS AS SHOWN 20-04-2016
A3 REFER REVISION LOG RKU JCH SMA 06-12-2016 SYSTRA S.A. - 72-76 RUE HENRY FARMAN 75015 CONSTRUCTION REFERENCE DRAWING
PARIS, FRANCE
DDC101-DD-SGA-AR-DW-48704 B2
THANGAL STATION GOWRI ASHRAM STATION THIRUVOTTIYUR STATION
℄ OF PLATFORM
6243.291
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
160000
10000 10000 10000 12500 12500 12500 12500 12500 12500 12500 12500 10000 10000 10000
AA BB CC DD EE
48725 48726 48727 48728 48729
D-01.2
O-06.1
2575x1975
A
O-06.2
PART-1
2575x1975
STA-01 6585 4
9000
9800
48711
W 1800 FFL+21.260m
7180
DN O-03.1
T 300 UP
R 150 D-04.1 FOURTH FLOOR LEVEL
STA-F1 D-05.1
B W 1800
T 300 D-06.1
10785
R 150
B2 TOC+21.210m
7900
PD-09
O-06.5 FOURTH FLOOR LEVEL
13425
130 sqm
STA-07 2575x1975 EXPANSION JOINT
C DN W 1800 5935 3875
4700
T 300
PLATFORM ABOVE DN PLATFORM ABOVE
2800
R 150 FFL+21.260m
D
1800
3130
FFL+21.260m
FOURTH FLOOR LEVEL
E
223
0
L2 280 L2
00
48735 48735
7270
0 O-06.7 O-06.3
280 2575x1975 2575x1975 TRACK CENTER
STA-10 D-01.6 O-06.4 LINE ABOVE
F W 1800 2575x1975
STA-08
T 300 1060
2000
W 1800
5455
5255
R 150 UP
2000
86285
8780
R 150 10000
F'
4800
6075 2795 2465 4200 2000 4200 10310 STA-F2
8285
6810
7815
2800 O-03.2 4000 T 300
19060 R 150
D-05.5
G L1
DN. UP
L1
48730 D-01.4 48730
D-04.5 14400 STA-06
W 2400
9500
T 300
FFL+21.260m B2 R 150
STA-05
H FOURTH FLOOR LEVEL W 2400
5910 T 300
TOC+21.210m R 150
9010
8500
29825
PD-10
420 sqm
D-06.3
J
D-02
10200
8500
D-06.4 800
ABOVE
D-04.4
6300
K PART-2 D-05.4
48712 D-01.3
8250
DN.
5200
STA-F3
W 2400
UP T 300
L R 150
AA BB CC DD EE
FOURTH FLOOR LEVEL PLAN 48725 48726 48727 48728 48729
SCALE 1:300
GENERAL NOTES
1. ALL LEVELS ARE IN METERS AND ALL THE DIMENSIONS ARE IN MILLIMETERS.
2. GROUND LEVELS, WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN
WALL SCHEDULE ABBREVIATIONS:- REVISION LOG B2 :
FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE.
LEGEND :- AFC AUTOMATIC FAIR COLLECTION 1. ES-01- ONE LIFT REMOVED AND ONE LIFT
3. RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO
STRUCTURAL DESIGN. HOWEVER DIMENSIONS OF ALL INTERNAL ELEMENTS LIKE RCC ROOM SCHEDULE SEC. / ELEV. NAME 1 150 THK. RCC WALL CL CENTER LINE RELOCATE,
CMRL CHENNAI METRO RAIL LIMITED 2. STAIRCASE ADDED REPLACED REMOVED LIFT,
WALLS AND COLUMNS SHALL BE RESTRICTED TO THE MAXIMUM SIZES SHOWN IN THE
2 400 THK. RCC WALL 3. FIRE ESCAPE STAIRCASE REARRANGED
ARCHITECTURAL DRAWINGS. Room Tag Room ID Description E&M ELECTRICAL AND MECHANICAL KEY PLAN
4. ALL MINIMUM INTERNAL CLEARANCES ARE MANDATORY. WALL AND SLAB THICKNESS DRAWING NUMBER ES ENTRY
D-01 Plumbing Shaft Plumbing Shaft 3 300 THK. RCC WALL
SHOULD BE INCREASED OUTSIDE,AS REQUIRED BY DESIGN. ESC ESCALATOR NOTE : THANGAL STATION GOWRI ASHRAM STATION THIRUVOTTIYUR STATION
D-02 FHC Fire Hose Cabinet FFL FINISH FLOOR LEVEL 1. REFER SEPARATE DRAWINGS FOR ENTRY
5. LOCATION AND NOS. OF MAIN COLUMNS SHALL BE AS PER CO-ORDINATED AND RCC WORK 4 200 THK. BLOCK WALL
CONFIRMED STRUCTURAL LAYOUT BY CONTRACTOR. D-04 Electrical Shaft Electrical Shaft LDB LIGHT DISTRIBUTION BOARD STRUCTURE DETAILS
6. INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M 5 300 THK. BLOCK WALL RCC REINFORCED CEMENT CONCRETE 2. FOR WALL TYPE AROUND LIFT SHAFT, LIFT
D-05 S&T Shaft S&T Shaft BLOCK WORK
DESIGN. STA STAIRCASE MATRIX REV-10 TO BE FOLLOWED AS FINAL
D-06 HVAC Shaft HVAC Shaft 6 100 THK. BLOCK WALL TS TRACK STEPS
7. ESCALATOR AND LIFT SIZES ARE INDICATIVE AND FINAL SIZES SHALL BE AS PER
MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO O-03 UnPaid Concourse area UnPaid Concourse area SUNKEN SLAB TOC TOP OF CONCRETE
7 250 THK. RCC WALL
BE AS PER E&M DRAWINGS.
8. REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. O-06 Lift Lift COLUMN 8 230 THK. RCC WALL
9. ACTUAL SIZES OF CUTOUTS AND OPENINGS IN STRUCTURAL SLABS AND WALLS SHALL PD Property Development Property Development
REFERENCE DRAWINGS GENERAL ARRANGEMENT DRAWING
10.
BE AS PER SEM DRAWINGS.
FOR FINISHES REFER FINISHES DRAWING SCHEDULE AND REPORT. STA Public Staircase Public Staircase DRAWING NUMBER DRAWING TITLE
GOOD FOR CONSTRUCTION
11. WATER TANKS AND SUMP PITS AS PER MEP DETAIL DRAWINGS. DDC101-DD-SGA-AR-DW-48703 SCHEDULE AND LEGEND IT IS CERTIFIED THAT THIS DOCUMENT HAS BEEN
12. FOR RAISED FLOOR STAIRCASE TREAD 300MM & RISER 150MM. DDC101-DD-SGA-AR-DW-48770 THIRD LEVEL PLAN
13. FOR EQUIPMENT LAYOUT REFER MEP DRAWINGS. DDC101-DD-SGA-AR-DW-48790 DOOR AND WINDOW SCHEDULE DESIGNED AND CHECKED IN ACCORDANCE WITH DDC DDC101-CHENNAI METRO PH-1 EXTENSION
DDC101-DD-SGA-AR-DW-48894 OPENING CUTOUT SCHEDULE QUALITY ASSURANCE PLAN WASHERMANPET TO WIMCO NAGAR
B2 REFER REVISION LOG MCR SSA KAS 01-10-2020 CHENNAI METRO RAIL LTD. 5TH FLOOR, GURU ANGAD BHAWAN, MCR
THIRUVOTRIYUR THERADI METRO -STT (GOWRI ASHRAM-SGA)
B1 REFER REVISION LOG MCR SSA KAS 20-03-2020
ADMINISTRATIVE BUILDING, 71, NEHRU PLACE, NEW DELHI-110019 FOURTH FLOOR / LINKBRIDGE LEVEL PLAN
CMRL DEPOT, POONAMALLEE HIGH ROAD, PH: 26422844, 26413310 FAX: 26224204 SSA
B0 GFC SUBMISSION MCR SSA KAS 27-01-2020 KOYAMBEDU, CHENNAI - 600107 (INDIA)
SUBSIDIARY OF:
KAS AS SHOWN 09-08-2018 CONSTRUCTION REFERENCE DRAWING
A0 CRD SUBMISSION -FIRST ISSUE HCH SSA KAS 09-08-2018 SYSTRA S.A. - 72-76 RUE HENRY FARMAN 75015
PARIS, FRANCE
DDC101-DD-SGA-AR-DW-48710 B2
THANGAL STATION GOWRI ASHRAM STATION THIRUVOTTIYUR STATION
℄ OF PLATFORM
6243.291
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
160000
10000 10000 10000 12500 12500 12500 12500 12500 12500 12500 12500 10000 10000 10000
AA BB CC DD EE
48725 48726 48727 48728 48729
D-01.2
6515
O-06.1
PART-1 2575x1975
A 4000
48716 O-06.2
STA-01 6585 2575x1975
FFL+25.760m
9000
9800
W 1800
T 300 O-03.1 PLATFORM LEVEL
R 150 D-04.1
FFL+26.060m DN
D-05.1
STA-F1
5645
B W 1800 LEVEL
T 300 D-06.1
A-02.1
R 150
B2
7900
A-03.1 2230
A-04.1 ENTRY
UP
6900
3200 X-RAY
ROOF ABOVE 2700
C STA-07
DN W 1800 4 EXPANSION JOINT
FFL+25.810m FFL+25.810m
4700
5235
D
1800
3130
TS-01 DN EXIT
O-02.1
W 1000 TS-03
D'
SLOPE
SLOPE
3300 1520 4900 1520 3300
SLOPE
SLOPE
R 155 TEMPORARY T 300
EXPANSION JOINT BARRICADING AS/CMRL EXPANSION JOINT
7270
R 155
+24.720m PLATFORM EDGE AS/ STRUC. AS/ STRUC. PLATFORM EDGE +24.720m
RAIL LEVEL ℄ OF TRACK ℄ OF TRACK RAIL LEVEL
E L2 L2
48735 +24.720m ℄ OF TRACK ℄ OF TRACK +24.720m 48735
7270
RAIL LEVEL PLATFORM EDGE EXPANSION JOINT EXPANSION JOINT PLATFORM EDGE RAIL LEVEL
SLOPE
SLOPE
SLOPE
SLOPE
AS/ STRUC. TEMPORARY O-06.3 AS/ STRUC. TS-04
TS-02 BARRICADING AS/CMRL
O-06.7 O-06.4 W 1000
W 1000
F T 300 T 300
R 155 9800 R 155
5455
DN DN
2000
86285
6075 O-02.2
DN 1200mm HIGH ROOF ABOVE
ROOF ABOVE ENTRY FFL+25.810m
BLOCK WALL
F' 8870 2465 4200 2000 4200 2800
FFL+25.810m D-01.6 STA-F2 PLATFORM EDGE LEVEL
EXPANSION JOINT W 1800
6810
10285
W 1800 O-03.2 STA-10 R 150
T 300 D-05.5 EXIT W 1800
G L1 L1
R 150 2950 T 300
48730 D-01.4 48730
R 150
D-04.5
30140
FFL+25.760m FFL+26.060m
9500
LEVEL
10550
PLATFORM LEVEL B2
6450
STA-06
UP 6760 W 2400
ENTRY
H T 300
A-02.2 R 150
PART-2 FFL+26.060m A-03.2
DN FFL+25.760m
8500
LEVEL A-04.2
7855
48717
O-03.2 PLATFORM LEVEL
20110 D-06.3
J ESP ESP
UP
SPK
SPK
7500 2450
4900
FFL+26.060m
8500
O-08.1F A-01
D-06.4 6700 LEVEL
D-04.4 4
K O-09.2
3200
D-05.4
D-01.3 CORRIDOR
8250
STA-F3
O-08.1M DN W 2400
T 300
UP R 150
L
AA BB CC DD EE
48725 48726 48727 48728 48729
B2 REFER REVISION LOG MCR SSA KAS 01-10-2020 CHENNAI METRO RAIL LTD. 5TH FLOOR, GURU ANGAD BHAWAN, MCR
THIRUVOTRIYUR THERADI METRO -STT (GOWRI ASHRAM-SGA)
B1 REFER REVISION LOG MCR SSA KAS 20-03-2020
ADMINISTRATIVE BUILDING, 71, NEHRU PLACE, NEW DELHI-110019 PLATFORM LEVEL PLAN
CMRL DEPOT, POONAMALLEE HIGH ROAD, PH: 26422844, 26413310 FAX: 26224204 SSA
B0 GFC SUBMISSION MCR SSA KAS 27-01-2020 KOYAMBEDU, CHENNAI - 600107 (INDIA)
SUBSIDIARY OF:
KAS AS SHOWN 09-08-2018 CONSTRUCTION REFERENCE DRAWING
A0 CRD SUBMISSION -FIRST ISSUE HCH SSA KAS 09-08-2018 SYSTRA S.A. - 72-76 RUE HENRY FARMAN 75015
PARIS, FRANCE
DDC101-DD-SGA-AR-DW-48715 B2
THANGAL STATION GOWRI ASHRAM STATION THIRUVOTTIYUR STATION
℄ OF PLATFORM
6243.291
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
160000
10000 10000 10000 12500 12500 12500 12500 12500 12500 12500 12500 10000 10000 10000
AA BB CC DD EE
48725 48726 48727 48728 48729
PART-1 D-01.2
48761 O-06.1
2575x1975
A
O-06.2
2575x1975
STA-01 6585
9000
9800
W 1800 4 FFL+10.910m
7180
T 300 UP DN
R 150 D-04.1 FIRST FLOORLEVEL
D-05.1
B STA-F1
W 3400 D-06.1 TOC +10.860m
T 300
7900
12225
1200mm
2575x1975 130 SQM
HALF HIGH
C DN
WALL
4700
10785
DN
D
3130
D'
B3
7270
E
L2 L2
48735 48735
7270
3775
86285
DN. UP
10200
7300
F' STA-F2
5300
FFL+10.910m C-03 W 1800
UP 9710 T 300
6810
LEVEL R 150
7865
D-05.5 200x200mm MULLION COLUMN
O-10M O-10F
G FFL+10.910m D-01.4 O-13 KNOCKOUT WALL
L1 4000 DN UP 3000(W) X 3500(H)MM L1
48730 LEVEL D-04.5
STA-02 48730
O-28
4700
6700
FFL +11.210m STA-03
9500
B0A12512
R 150
B012511
B012513
B012515
B012522
KNOCKOUT WALL
B012521
2500(W) X 3300(H)MM
H FFL+10.910m
3000X600MM FRESH P-01
AIR LOUVER (2500MM P-02 SPARE FIRST FLOORLEVEL
9460
8500
19925
630KVA
TRANSFORMER-1
630KVA
TRANSFORMER-2
9710
BYRN BYRN
D-06.3
ABOVE
M005 DOWN DOWN
206
M006 N006 N005
206
490 490
N007
J
M007
N008
M008
N009
97
97
105 490 105 105 490 105
206
206
97
97
490 490
NRYB NRYB
MDB
9910 4855
FFL +10.910m
8500
EMDB
AC PANEL
LEVEL 10200
4
PA PANEL-1
B3
ESPP
5000
D-04.4 MLP UPS PANEL
K MPP
3250
D-05.4 4
UPS 1 UPS 1
P-03 11
4200
D-01.3 BC BC
8250
STA-F3
DN
W 2400
T 300
UP R 150
L
AA BB CC DD EE
48725 48726 48727 48728 48729
FIRST LEVEL PLAN
SCALE 1:300
GENERAL NOTES
REVISION LOG B3 :
1. ES-01- ONE LIFT REMOVED AND ONE LIFT
1. ALL LEVELS ARE IN METERS AND ALL THE DIMENSIONS ARE IN MILLIMETERS.
ABBREVIATIONS:- RELOCATED
2. GROUND LEVELS, WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN
AFC AUTOMATIC FAIR COLLECTION 2. STAIRCASE ADDED.
FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE.
3. RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO ROOM SCHEDULE CL CENTER LINE 3. FIRE ESCAPE STAIRCASE REVISED.
CMRL CHENNAI METRO RAIL LIMITED 4. ASS ROOM & C-03 ROOM LAYOUT REVISED.
STRUCTURAL DESIGN. HOWEVER DIMENSIONS OF ALL INTERNAL ELEMENTS LIKE RCC
WALLS AND COLUMNS SHALL BE RESTRICTED TO THE MAXIMUM SIZES SHOWN IN THE Room Tag Room ID Description E&M ELECTRICAL AND MECHANICAL
ARCHITECTURAL DRAWINGS. Communication Equipment ES ENTRY NOTE : KEY PLAN
C-03 CER ESC ESCALATOR 1. REFER SEPARATE DRAWINGS FOR ENTRY
4. ALL MINIMUM INTERNAL CLEARANCES ARE MANDATORY. WALL AND SLAB THICKNESS Room
SHOULD BE INCREASED OUTSIDE,AS REQUIRED BY DESIGN. Plumbing Shaft Plumbing Shaft FFL FINISH FLOOR LEVEL STRUCTURE DETAILS THANGAL STATION GOWRI ASHRAM STATION THIRUVOTTIYUR STATION
WALL SCHEDULE D-01
5. LOCATION AND NOS. OF MAIN COLUMNS SHALL BE AS PER CO-ORDINATED AND LDB LIGHT DISTRIBUTION BOARD 2. FOR WALL TYPE AROUND LIFT SHAFT, LIFT
D-02 FHC Fire Hose Cabinet RCC REINFORCED CEMENT CONCRETE MATRIX REV-10 TO BE FOLLOWED AS FINAL
CONFIRMED STRUCTURAL LAYOUT BY CONTRACTOR.
LEGEND :- 1 150 THK. RCC WALL D-04 Electrical Shaft Electrical Shaft STA STAIRCASE
6. INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M
DESIGN. D-05 S&T Shaft S&T Shaft TS TRACK STEPS
SEC. / ELEV. NAME 2 400 THK. RCC WALL
7. ESCALATOR AND LIFT SIZES ARE INDICATIVE AND FINAL SIZES SHALL BE AS PER TOC TOP OF CONCRETE
MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO 3 300 THK. RCC WALL
D-06 HVAC Shaft HVAC Shaft REFERENCE DRAWINGS
BE AS PER E&M DRAWINGS. O-03 UnPaid Concourse area UnPaid Concourse area DRAWING NUMBER DRAWING TITLE
DRAWING NUMBER SCHEDULE AND LEGEND
8. REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 4 200 THK. BLOCK WALL DDC101-DD-SGA-AR-DW-48703
O-06 Lift Lift DDC101-DD-SGA-AR-DW-48704 GROUND LEVEL PLAN
9. ACTUAL SIZES OF CUTOUTS AND OPENINGS IN STRUCTURAL SLABS AND WALLS SHALL
5 300 THK. BLOCK WALL
10.
BE AS PER SEM DRAWINGS.
FOR FINISHES REFER FINISHES DRAWING SCHEDULE AND REPORT.
RCC WORK P-03 UPSR UPS Battery and S&T Room
Toilet (Female) DDC101-DD-SGA-AR-DW-48790
DDC101-DD-SGA-AR-DW-48894
DOOR AND WINDOW SCHEDULE
OPENING CUTOUT SCHEDULE
GOOD FOR CONSTRUCTION GENERAL ARRANGEMENT DRAWING
6 100 THK. BLOCK WALL P-01/P-02/P-05 ASS Auxilary Sub Station
11. WATER TANKS AND SUMP PITS AS PER MEP DETAIL DRAWINGS. BLOCK WORK
PD Property Development Property Development
IT IS CERTIFIED THAT THIS DOCUMENT HAS BEEN
12. FOR RAISED FLOOR STAIRCASE TREAD 300MM & RISER 150MM.
13. FOR EQUIPMENT LAYOUT REFER MEP DRAWINGS.
7 250 THK. RCC WALL
DESIGNED AND CHECKED IN ACCORDANCE WITH DDC DDC101-CHENNAI METRO PH-1 EXTENSION
COLUMN STA Public Staircase Public Staircase
8 230 THK. RCC WALL QUALITY ASSURANCE PLAN WASHERMANPET TO WIMCO NAGAR
B3 REFER REVISION LOG MCR SSA KAS 01-10-2020 SYSTRA MVA CONSULTING (INDIA) PVT.LTD.
ELEVATED STATION -4
S220/X/XXXX/XXX/XXXX
B2 REFER REVISION LOG MCR SSA KAS 05-08-2020 CHENNAI METRO RAIL LTD. 5TH FLOOR, GURU ANGAD BHAWAN, MCR
THIRUVOTRIYUR THERADI METRO -STT (GOWRI ASHRAM-SGA)
B1 REFER REVISION LOG MCR SSA KAS 20-03-2020
ADMINISTRATIVE BUILDING, 71, NEHRU PLACE, NEW DELHI-110019 FIRST FLOOR LEVEL PLAN
CMRL DEPOT, POONAMALLEE HIGH ROAD, PH: 26422844, 26413310 FAX: 26224204 SSA
B0 GFC SUBMISSION MCR SSA KAS 27-01-2020 KOYAMBEDU, CHENNAI - 600107 (INDIA)
SUBSIDIARY OF:
KAS AS SHOWN 09-08-2018 CONSTRUCTION REFERENCE DRAWING
A0 CRD SUBMISSION -FIRST ISSUE HCH SSA KAS 09-08-2018 SYSTRA S.A. - 72-76 RUE HENRY FARMAN 75015
PARIS, FRANCE
DDC101-DD-SGA-AR-DW-48760 B3
THANGAL STATION GOWRI ASHRAM STATION THIRUVOTTIYUR STATION
℄ OF PLATFORM
6243.291
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
160000
10000 10000 10000 12500 12500 12500 12500 12500 12500 12500 12500 10000 10000 10000
AA BB CC DD EE
48725 48726 48727 48728 48729
D-01.2
O-06.1
2575x1975
A
O-06.2
2575x1975
PART-1 STA-01 6585
9000
48766
W 1800 4 FFL+14.360m
7180
T 300 DN
UP
R 150 D-04.1 SECOND FLOOR LEVEL
D-05.1
B STA-F1
W 3400 D-06.1
T 300 PD-05
B2
7900
12225
10785 SECOND FLOOR LEVEL
2575x1975
C DN
1200mm HALF
4700
HIGH WALL
DN
D
3130
D'
7270
E
7270
O-06.7
2575x1975
O-06.3
D-01.6
F 2575x1975
1200mm HIGH O-06.4
5455
DN. UP
L2 10200 L2
F' STA-F2
48735 4 W 1800 48735
9710
T 300
6810
6165
R 150
7865
D-05.5 RCC BEAM WITH LIFTING HOOK
18150
D-01.4 FOR ASS EQUIPMENT ACCESS
G PART-2 D-04.5 4000 DN. UP
48767
PD-06 FFL+14.960m
4 505 sqm
9500
18425
T 300
H
2000
R 150
L1 L1
6300 900 STA-03
48730 48730
9460
8500
TOC+14.910m
9800 10310 SECOND FLOOR LEVEL
J
20260
D-06.3
8500
D-04.4
K
D-05.4 9345
D-01.3
8250
STA-F3
DN.
W 2400
T 300
UP R 150
L
AA BB CC DD EE
48725 48726 48727 48728 48729
1. ALL LEVELS ARE IN METERS AND ALL THE DIMENSIONS ARE IN MILLIMETERS.
2. GROUND LEVELS, WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN
ROOM SCHEDULE
FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE. Room Tag Description
3. RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO
Room ID
D-01 Plumbing Shaft Plumbing Shaft ABBREVIATIONS:- REVISION LOG B2 :
STRUCTURAL DESIGN. HOWEVER DIMENSIONS OF ALL INTERNAL ELEMENTS LIKE RCC LEGEND :-
AFC AUTOMATIC FAIR COLLECTION 1. ES-01- ONE LIFT REMOVED AND ONE LIFT
WALLS AND COLUMNS SHALL BE RESTRICTED TO THE MAXIMUM SIZES SHOWN IN THE D-02 FHC Fire Hose Cabinet
SEC. / ELEV. NAME CL CENTER LINE RELOCATE, KEY PLAN
ARCHITECTURAL DRAWINGS. D-04 Electrical Shaft Electrical Shaft
CMRL CHENNAI METRO RAIL LIMITED 2. STAIRCASE ADDED REPLACED REMOVED LIFT,
4. ALL MINIMUM INTERNAL CLEARANCES ARE MANDATORY. WALL AND SLAB THICKNESS
D-05 S&T Shaft S&T Shaft E&M ELECTRICAL AND MECHANICAL 3. FIRE ESCAPE STAIRCASE REARRANGED THANGAL STATION
SHOULD BE INCREASED OUTSIDE,AS REQUIRED BY DESIGN. GOWRI ASHRAM STATION THIRUVOTTIYUR STATION
DRAWING NUMBER WALL SCHEDULE ES ENTRY
5. LOCATION AND NOS. OF MAIN COLUMNS SHALL BE AS PER CO-ORDINATED AND D-06 HVAC Shaft HVAC Shaft
CONFIRMED STRUCTURAL LAYOUT BY CONTRACTOR. ESC ESCALATOR NOTE :
1 150 THK. RCC WALL O-03 UnPaid Concourse area UnPaid Concourse area FFL FINISH FLOOR LEVEL 1. REFER SEPARATE DRAWINGS FOR ENTRY
6. INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M RCC WORK
DESIGN. O-06 Lift Lift LDB LIGHT DISTRIBUTION BOARD STRUCTURE DETAILS
2 400 THK. RCC WALL
7. ESCALATOR AND LIFT SIZES ARE INDICATIVE AND FINAL SIZES SHALL BE AS PER RCC REINFORCED CEMENT CONCRETE 2. FOR WALL TYPE AROUND LIFT SHAFT, LIFT
BLOCK WORK PD Property Development Property Development STA STAIRCASE
MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO 3 300 THK. RCC WALL MATRIX REV-10 TO BE FOLLOWED AS FINAL
BE AS PER E&M DRAWINGS. TS TRACK STEPS
SUNKEN SLAB STA Public Staircase Public Staircase
8. REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 4 200 THK. BLOCK WALL TOC TOP OF CONCRETE
9. ACTUAL SIZES OF CUTOUTS AND OPENINGS IN STRUCTURAL SLABS AND WALLS SHALL
5 300 THK. BLOCK WALL REFERENCE DRAWINGS GENERAL ARRANGEMENT DRAWING
10.
BE AS PER SEM DRAWINGS.
FOR FINISHES REFER FINISHES DRAWING SCHEDULE AND REPORT.
ROOF SHEETING
DRAWING NUMBER DRAWING TITLE
GOOD FOR CONSTRUCTION
6 100 THK. BLOCK WALL
11. WATER TANKS AND SUMP PITS AS PER MEP DETAIL DRAWINGS. SKY LIGHT DDC101-DD-SGA-AR-DW-48703 SCHEDULE AND LEGEND IT IS CERTIFIED THAT THIS DOCUMENT HAS BEEN
12. FOR RAISED FLOOR STAIRCASE TREAD 300MM & RISER 150MM. DDC101-DD-SGA-AR-DW-48760 FIRST LEVEL PLAN
13. FOR EQUIPMENT LAYOUT REFER MEP DRAWINGS.
7 250 THK. RCC WALL
DDC101-DD-SGA-AR-DW-48790 DOOR AND WINDOW SCHEDULE DESIGNED AND CHECKED IN ACCORDANCE WITH DDC DDC101-CHENNAI METRO PH-1 EXTENSION
COLUMN
8 230 THK. RCC WALL DDC101-DD-SGA-AR-DW-48894 OPENING CUTOUT SCHEDULE QUALITY ASSURANCE PLAN WASHERMANPET TO WIMCO NAGAR
B2 REFER REVISION LOG MCR SSA KAS 01-10-2020 CHENNAI METRO RAIL LTD. 5TH FLOOR, GURU ANGAD BHAWAN, MCR
THIRUVOTRIYUR THERADI METRO -STT (GOWRI ASHRAM-SGA)
B1 REFER REVISION LOG MCR SSA KAS 20-03-2020
ADMINISTRATIVE BUILDING, 71, NEHRU PLACE, NEW DELHI-110019 SECOND FLOOR LEVEL PLAN
CMRL DEPOT, POONAMALLEE HIGH ROAD, PH: 26422844, 26413310 FAX: 26224204 SSA
B0 GFC SUBMISSION MCR SSA KAS 27-01-2020 KOYAMBEDU, CHENNAI - 600107 (INDIA)
SUBSIDIARY OF:
KAS AS SHOWN 09-08-2018 CONSTRUCTION REFERENCE DRAWING
A0 CRD SUBMISSION -FIRST ISSUE HCH SSA KAS 09-08-2018 SYSTRA S.A. - 72-76 RUE HENRY FARMAN 75015
PARIS, FRANCE
DDC101-DD-SGA-AR-DW-48765 B2
THANGAL STATION GOWRI ASHRAM STATION THIRUVOTTIYUR STATION
℄ OF PLATFORM
6243.291
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
160000
10000 10000 10000 12500 12500 12500 12500 12500 12500 12500 12500 10000 10000 10000
AA BB CC DD EE
48725 48726 48727 48728 48729
PART-1
D-01.2
48771
O-06.1
A 2575x1975
O-06.2
6585 2575x1975
STA-01
9000
9800
W 1800 4 FFL+17.810m
7180
T 300 DN
UP
R 150 D-04.1 THIRD FLOOR LEVEL
STA-F1 D-05.1
B W 3400
T 300 D-06.1
R 150
B2 TOC+17.760m
7900
PD-07
131 sqm THIRD FLOOR LEVEL
O-06.5
12225
4265
2575x1975
C DN
4700
10785
DN
D
3130
D'
7270
E
L2 L2
48735 48735
7270
O-06.3
O-06.7 2575x1975
O-06.4
2575x1975
2575x1975
F 1060
D-01.6
5455
3775
86285
DN. UP
7300
F'
9710 STA-F2
6810
6165
W 1800
7865
D-05.5 4000 T 300
R 150
D-01.4
G L1 13345 DN UP L1
48730 PART-2 D-04.5 48730
STA-04
48772 STA-05
9500
B2 PD-08 W 2400
505 sqm T 300
4
R 150
18425
38410
H
FFL+18.110m
THIRD FLOOR LEVEL
8500
20110
D-06.3
J 10200 9910
8500
4 TOC+18.060m
D-04.4
THIRD FLOOR LEVEL
K
D-05.4
D-01.3
8250
STA-F3
DN.
W 2400
T 300
UP R 150
L
AA BB CC DD EE
THIRD FLOOR LEVEL PLAN 48725 48726 48727 48728 48729
SCALE 1:300
GENERAL NOTES
1. ALL LEVELS ARE IN METERS AND ALL THE DIMENSIONS ARE IN MILLIMETERS.
2. GROUND LEVELS, WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN ROOM SCHEDULE
FROM SURVEY DRAWINGS AND SHALL BE CONFIRMED AT SITE.
3. RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO Room Tag Room ID Description
STRUCTURAL DESIGN. HOWEVER DIMENSIONS OF ALL INTERNAL ELEMENTS LIKE RCC D-01 Plumbing Shaft Plumbing Shaft ABBREVIATIONS:- REVISION LOG B2 :
WALLS AND COLUMNS SHALL BE RESTRICTED TO THE MAXIMUM SIZES SHOWN IN THE LEGEND :- AFC AUTOMATIC FAIR COLLECTION 1. ES-01- ONE LIFT REMOVED AND ONE LIFT
D-02 FHC Fire Hose Cabinet KEY PLAN
ARCHITECTURAL DRAWINGS.
SEC. / ELEV. NAME CL CENTER LINE RELOCATE,
4. ALL MINIMUM INTERNAL CLEARANCES ARE MANDATORY. WALL AND SLAB THICKNESS D-04 Electrical Shaft Electrical Shaft 2. STAIRCASE ADDED REPLACED REMOVED LIFT,
CMRL CHENNAI METRO RAIL LIMITED
SHOULD BE INCREASED OUTSIDE,AS REQUIRED BY DESIGN. D-05 S&T Shaft S&T Shaft E&M ELECTRICAL AND MECHANICAL 3. FIRE ESCAPE STAIRCASE REARRANGED THANGAL STATION GOWRI ASHRAM STATION THIRUVOTTIYUR STATION
WALL SCHEDULE
5. LOCATION AND NOS. OF MAIN COLUMNS SHALL BE AS PER CO-ORDINATED AND ES ENTRY
DRAWING NUMBER D-06 HVAC Shaft HVAC Shaft
CONFIRMED STRUCTURAL LAYOUT BY CONTRACTOR. ESC ESCALATOR
1 150 THK. RCC WALL NOTE :
6. INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M O-03 UnPaid Concourse area UnPaid Concourse area FFL FINISH FLOOR LEVEL 1. REFER SEPARATE DRAWINGS FOR ENTRY
DESIGN. RCC WORK 2 400 THK. RCC WALL LDB LIGHT DISTRIBUTION BOARD
O-06 Lift Lift STRUCTURE DETAILS
7. ESCALATOR AND LIFT SIZES ARE INDICATIVE AND FINAL SIZES SHALL BE AS PER RCC REINFORCED CEMENT CONCRETE 2. FOR WALL TYPE AROUND LIFT SHAFT, LIFT
MANUFACTURER'S REQUIREMENT AS FINALIZED BY CMRL AND THEIR PIT DRAINAGE TO BLOCK WORK 3 300 THK. RCC WALL PD Property Development Property Development STA STAIRCASE MATRIX REV-10 TO BE FOLLOWED AS FINAL
BE AS PER E&M DRAWINGS. TS TRACK STEPS
8. REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT. 4 200 THK. BLOCK WALL STA Public Staircase Public Staircase
SUNKEN SLAB TOC TOP OF CONCRETE
9. ACTUAL SIZES OF CUTOUTS AND OPENINGS IN STRUCTURAL SLABS AND WALLS SHALL
5 300 THK. BLOCK WALL REFERENCE DRAWINGS GENERAL ARRANGEMENT DRAWING
10.
BE AS PER SEM DRAWINGS.
FOR FINISHES REFER FINISHES DRAWING SCHEDULE AND REPORT. ROOF SHEETING DRAWING NUMBER DRAWING TITLE GOOD FOR CONSTRUCTION
6 100 THK. BLOCK WALL
11. WATER TANKS AND SUMP PITS AS PER MEP DETAIL DRAWINGS. DDC101-DD-SGA-AR-DW-48703 SCHEDULE AND LEGEND IT IS CERTIFIED THAT THIS DOCUMENT HAS BEEN
12. FOR RAISED FLOOR STAIRCASE TREAD 300MM & RISER 150MM. SKY LIGHT DDC101-DD-SGA-AR-DW-48765 SECOND LEVEL PLAN
13. FOR EQUIPMENT LAYOUT REFER MEP DRAWINGS.
7 250 THK. RCC WALL
DDC101-DD-SGA-AR-DW-48790 DOOR AND WINDOW SCHEDULE DESIGNED AND CHECKED IN ACCORDANCE WITH DDC DDC101-CHENNAI METRO PH-1 EXTENSION
COLUMN 8 230 THK. RCC WALL DDC101-DD-SGA-AR-DW-48894 OPENING CUTOUT SCHEDULE QUALITY ASSURANCE PLAN WASHERMANPET TO WIMCO NAGAR
B2 REFER REVISION LOG MCR SSA KAS 01-10-2020 CHENNAI METRO RAIL LTD. 5TH FLOOR, GURU ANGAD BHAWAN, MCR
THIRUVOTRIYUR THERADI METRO -STT (GOWRI ASHRAM-SGA)
B1 REFER REVISION LOG MCR SSA KAS 20-03-2020
ADMINISTRATIVE BUILDING, 71, NEHRU PLACE, NEW DELHI-110019 THIRD FLOOR LEVEL PLAN
CMRL DEPOT, POONAMALLEE HIGH ROAD, PH: 26422844, 26413310 FAX: 26224204 SSA
B0 GFC SUBMISSION MCR SSA KAS 27-01-2020 KOYAMBEDU, CHENNAI - 600107 (INDIA)
SUBSIDIARY OF:
KAS AS SHOWN 09-08-2018 CONSTRUCTION REFERENCE DRAWING
A0 CRD SUBMISSION -FIRST ISSUE HCH SSA KAS 09-08-2018 SYSTRA S.A. - 72-76 RUE HENRY FARMAN 75015
PARIS, FRANCE
DDC101-DD-SGA-AR-DW-48770 B2