Sunteți pe pagina 1din 13

MINISTRY OF YOUTH AND SPORTS

DRAWING No. DESCRIPTION REV ISSUED PUBLISHED REMARK DRAWING No. DESCRIPTION REV ISSUED PUBLISHED REMARK
SUBMITTAL LETTER DA 002 SITE PLAN
DA 100 ALL COURTS PLAN DA 200 SECTION S-01 01 - WIP
DA 101 BASKETBALL SETOUT PLAN DA 201 SECTION DETAILS 01 - WIP
DA 102 FUTSAL COURT SETOUT PLAN DA 202 TYPICAL DETAILS 01 - WIP
DA 103 NETBALL COURT SETOUT PLAN DA 203 SECTION & DETAILS 01 - WIP
DA 104 SHELTER FLOOR PLAN DA 204 DETAILS
DA 105 FOOTING SETOUT PLAN 01 - WIP DA 300 NORTH ELEVATION E-01
DA 000 COVER PAGE DA 400 21 MAR at 0900h
DA 001 DRAWING LISTS & SYMBOLS DA 401 21 MAR at 1200h

CONSTRUCTION ISSUE
TULAET PROJECTS
PROPOSED MULTI-PURPOSE COURTS
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886
NORTH EFATE
GSEducationalVersion
SPORT DEFAULT COLOUR
NETBALL RED (OR ANY COLOUR BUT YELLOW)

BASKETBALL BLACK/WHITE

VOLLEYBALL GREEN/LIGHTBLUE

FUTSAL BLUE/YELLOW

Volleyball Court 1

Basketball Court
Netball Court
28,000 CONCRETE SLAB

Futsal Court
Shelter

Volleyball Court 2

45,000 CONCRETE SLAB

ALL COURTS SETOUT PLAN


01
1:200

RevID ChID Change Name Date


CONSTRUCTION ISSUE
DESIGN:
MINISTRY OF YOUTH AND
REVISION
A
SPORTS 1:200, 1:270.40 @
DRAWING SCALE

CONSULTANT
TULAET PROJECTS
A3

Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS ALL COURTS PLAN
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 100
3,285 22,783 VOLLEYBALL COURT 2,192 15,240 BASKETBALL COURT NOTES

17,983 ULTRA HEAVY-DUTY BASKETBALL UNIT AS PER


MANUFACTURERS SPECIFICATIONS.
5,994 2,997 2,997 5,994
4,235 3,565 4,235 POST PADDING MADE FROM ABSORBENT FOAM
TO BE OPTIONAL.

DA 203
S-06
D-06 BASKETBALL POST WITH BASE PLATE AND FIXED
DA 203 TO FOOTING/PIER WITH L ANCHOR BOLTS FOR
908

PERMANENT INSTALLATION.

2,254
POST WITH PAINT FINISH.

1,097
D-09 STEEL HOOP TO HAVE A DIAMETER OF 450mm
12,592 VOLLEYBALL COURT

#LayID WITH POWDER COATED FINISH WITH NYLON NET

7,626
966 964
BACKBOARD TO BE 1200mm x 890mm MADE
FROM LAMINATED WOOD & FIBREGLASS
COMPOSITE.
8,992

12,802
Volleyball Court 1

480
VOLLEYBALL COURT NOTES:

SOCKETED VOLLEBALL POSTS WITH NET FOR


Basketball Court EASY REMOVAL AND QUICK INSTALLATION.
ALLOW FOR SOCKET LIDS FOR SOCKET

5,175
PROTECTION FROM BEING CLOGGED OR
INTERNAL DAMAGE

1,800
50mm CHS STEEL POSTS WITH POWER COSTED
Shelter FINISH.

900
1,000

GROUND SOCKETS MIN. OF 450mm INTO


GROUND

5,175
3,000
12,592 VOLLEYBALL COURT

1,800

12,802
8,992

Volleyball Court 2

7,626
3,000

5,760
BASKETBALL LINE MARKINGS TO BE
909

50mm WIDE & PAINTED BLACK/WHITE


5,994 2,997 2,997 5,994 13,437
VOLLEYBALL LINE MARKINGS TO BE
50mm WIDE & PAINTED GREEN/LIGHT
BLUE

BASKETBALL COURT SETOUT PLAN


02
1:200

RevID ChID Change Name Date


CONSTRUCTION ISSUE
DESIGN:
MINISTRY OF YOUTH AND
REVISION
A
SPORTS 1:200, 1:358.96 @
DRAWING SCALE

CONSULTANT
TULAET PROJECTS
A3

Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS BASKETBALL SETOUT PLAN
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 101
NOTES

DIMENSIONS
GOAL DIMENSIONS: 3m(W) x 2m(H)
40,051 FUTSAL COURT GOAL BOTTOM DEPTH: 1980mm
GOAL TOP RUNBACK: 920mm

MATERIALS
GOALFRAME MADE FROM HEAVY DUTY 100mm x 110mm ELLIPTICAL ALUMINIUM ITH REINFRCED RIBS INSIDE FOR
ADDITIONAL STRENGTH.
3,897

4,000 5,000 6,000 4,000 4,000 6,000 5,000 4,000


2,832 FULLY WELDED CORNER JOINTS THROUGHOUT FOR MAXIMUM STRENGTH AND DURABILITY.
2,168
FINISH TO BE SCRATCH RESISTANT POWDER COATED IN WHITE.

EXTRA THICK TUBULAR ALUMINIUM ITH SUPPORT STAY FOR EXTRA BRACING FOR NET SUPPORT BARS.
USE HIGH TENSILE STAINLESS STEEL BOLTS, NUTS & WASHERS.

GOAL NETS CONSTRUCTED FROM 5mm OD BRAIDED HDPE TWINE WITH 100mm KNOTTED MESH SIZE IN WHITE.

ATTACH GOAL NETS TO GOALS INERNAL CHANNEL WITH TWIST & LOCK STYLE SAFETY CLIPS
20,000 FUTSAL COURT

3,000
Futsal Court
15,160

Shelter
6,000

4,103
FUTSAL LINE MARKINGS TO BE 50mm WIDE
40,000 AND PAINTED BLUE/YELLOW

FUTSAL COURT SETOUT PLAN


03
1:200

RevID ChID Change Name Date


CONSTRUCTION ISSUE
DESIGN:
MINISTRY OF YOUTH AND
REVISION
A
SPORTS 1:200, 1:270.09 @
DRAWING SCALE

CONSULTANT
TULAET PROJECTS
A3

Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS FUTSAL COURT SETOUT PLAN
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 102
NOTES

30,500 NETBALL COURT 3m TALL SOCKETED NETBALL POSTS WITH


HIGH QUALITY 2mm KNOTTED NYLON
NETS

SOCKETS TO BE 460mm DEEP GROUND


SOCKETS

380mm DIA. HOOP TO BE 16mm STEEL


WITH POWDER COATED FINISH
6,272

NETBALL NET TO BE HARD WEARING


6,876 10,250 9,950 10,250 7,624 KNOTTED TWINE MADE FROM 2mm
NYLON TWINE

POSTS MADE FROM 50 CHS GALVANISED


STEEL POSTS WITH POWDER COATED
FINISH

Netball Court

D-08
S-04 DA 203
15,250

Shelter
DA 203

850
6,478

6,478
NETBALL LINE MARKINGS TO BE
50mm WIDE & PAINTED RED

NETBALL COURT SETOUT PLAN


04
1:200

RevID ChID Change Name Date


CONSTRUCTION ISSUE
DESIGN:
MINISTRY OF YOUTH AND
REVISION
A
SPORTS 1:200, 1:268.24 @
DRAWING SCALE

CONSULTANT
TULAET PROJECTS
A3

Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS NETBALL COURT SETOUT
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 PLAN DA 103
3,000 LEGEND:

150 2,700 150 COL - 1 250 x 25.7 UB COLUMN


COLOURBOND CORRGATED SHEET
METAL ROOF CLADDING
5.00°
+3,263
LINE OF ROOF OVER 800
+2,700
COL-1 STEEL UB BEAM WITH
150

150
COLOURBOND CORRUGATED
1,050

LINE OF ROOF OVER

PAINT FINISH
SHEET METAL ROOFING ON 5° FALL
STEEL ROOF FRAMING 800mm HIGH BLOCKWALL STEEL UB COLUMN
WITH RENDER & PAINT FINISH WITH PAINTED FINISH

Shelter
±0 ±0
F: Conc. S-02 S-02
800mm HIGH BLOCKWALL
6,000

5,700

5,700

6,000
A: 15.39 m2 DA 200 DA 200

LINE OF ROOF OVER


4,950

88.9OD x 5mm CHS STEEL


16mm Ø STEEL ROD BRACE COMPRESSION STRUT
WEST ELEVATION
E-05
5° FALL 1:100

P1

P1
COL-1
Ch-01
150

150

800

P1

P1
P1

P1
LINE OF ROOF OVER
5.00° COLOURBOND CORRUGATED SHEET
D-02 +3,263 METAL ROOF CLADDING
DA 200
+2,700
150 2,700 150 D-11
E-07 DA 204 E-07 STEEL UB BEAM WITH
3,000 DA 104 DA 104 PAINT FINISH
DA 104

DA 104

DA 104

DA 104
E-06

E-08

E-06

E-08
800mm HIGH BLOCKWALL
DA 200

DA 200
WITH RENDER & PAINT FINISH STEEL UB COLUMN
S-01

S-01
DA 104 DA 104 WITH PAINTED FINISH
E-05 E-05

800
±0 ±0

SHELTER FLOOR PLAN SHELTER ROOF PLAN


05 06
1:100 1:100
WEST ELEVATION
E-07
1:100

COLOURBOND CORRUGATED COLOURBOND CORRUGATED SHEET


SHEET METAL ROOF CLADDING +3,263 METAL ROOF CLADDING +3,263
+2,700 +2,700

STEEL UB BEAM WITH STEEL COMPRESSION STRUT


PAINT FINISH
STEEL UB COLUMN
WITH PAINT FINISH 800mm HIGH BLOCKWALL STEEL UB COLUMN
800mm HIGH BLOCKWALL WITH RENDER & PAINT FINISH WITH PAINTED FINISH
WITH RENDER & PAINT FINISH

800
±0 ±0 ±0 ±0

WEST ELEVATION WEST ELEVATION


E-06 E-08
1:100 1:100

RevID ChID Change Name Date


CONSTRUCTION ISSUE
DESIGN:
MINISTRY OF YOUTH AND
REVISION
A
SPORTS 1:100 @ A3
DRAWING SCALE

CONSULTANT
TULAET PROJECTS

Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS SHELTER FLOOR PLAN
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 104
MEMBER SCHEDULE:

TYPE SIZE COMMENTS

EB-1 300mmD x 300mmW REINFORCED CONCRETE EDGE BEAM


EB1 EB1 P1 EB1
P1 750mm x 750mm x 1000mmD CONCRETE PAD/PIER FOOTING (TBC)

P2 P2 300mmDIA. x 600mmD CONCRETE PAD/PIER (TBC)

P3 350mmL x 350mmW CONCRETE PEDESTAL

PF1 1000mmL x 1000mmW x 500mmD CONCRETE PAD FOOTING

EB-1
EB-1
S1 100mm THK REINFORCED CONCRETE SLAB
EB1

EB1
EB-1 EB-1 EB-1 01 - WIP

SF1 PF1
P3

P2

EB1
P2

SF1
EB1

P2

SF1
S1
P2

P3
EB-1 SF1 PF1
EB-1 EB-1

EB-1
EB-1

EB1
EB1

100mm THK SLAB


WITH F72 MESH 600 LAP
DA 105
S-08

Y12 LAP BAR @ 900 CRS

P2

300
4 - Y12 LONGITUDUNAL BARS
WITH R6 TIES @ 300 CRS
EB1 EB1
EB1
20mm SAND BLINDING 100 300
P1 01 - WIP
DA 105

100mm COMPACTED HARDFILL TO


S-08

95% MAXIMUM DRY DENSITY (MDD)

SECTION DETAIL 'EB1'


FOOTING SETOUT PLAN S-08
07 1:20
1:200
F72 MESH WITH 30mm 35 x 5mm INITIAL CUT FILLED
COVER TO TERMINATE WITH FOSROC SUPERSEAL
5mm(W) x 25mm(D) SAWN OR EQUIVALENT
50mm BEFORE JOINT
OR FORMED JOINT WITH
F72 MESH WITH 30mm COVER APPROVED SEALANT
100

20mm SAND BLINDING Y16 DOWEL BAR


SPACE @ 600 CRS. Ch-06
COMPACTED HARDFILL
ONE SIDE WRAPPED
20mm SAND BLINDING TO 95% MDD
WITH DENSO TAPE
100mm COMPACTED
D12 TRIM BAR Ch-05
HARDFILL TO 95% MDD

TYPICAL CONSTRUCTION JOINT DETAIL


TYPICAL SAW CUT DETAIL D-10
D-10 1:20
RevID ChID Change Name Date
1:20 CONSTRUCTION ISSUE
DESIGN:
MINISTRY OF YOUTH AND
REVISION
A
Ch-03 New footing and changes to footing sizes
SPORTS 1:200, 1:20 @ A3
DRAWING SCALE

01 - Ch-04 Change to footing size CONSULTANT


TULAET PROJECTS
Work in Progress
WIP Ch-05 Change to slab detail
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
Ch-06 Change to slab joint detail THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS FOOTING SETOUT PLAN
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 105
COLOURBOND CORRUGATED
SHEET ROOFING WITH STEEL
ROOF FRAMING
+3,263
COLOURBOND
BARGE FLASHING

6 - M24 x 400mm 250 x 25.7mm UB COLUMN


HDG ANCHOR BOLTS
STEEL UB BEAM M663 MESH WITH
30mm COVER
WITH PAINT FINISH 20mm THK BASE PLATE

D-14
STEEL UB COLUMN MORTAR BEDDING
DA 201
WITH PAINT FINISH
Ch-07

LINE OF 800mm HIGH DAMP PROOF MEMBRANE


BLOCKWALL WITH ON 50mm SAND BLINDING
RC SLAB ON Ch-08
RENDER & PAINT FINISH COMPACTED
HARDFILL

800
±0

SECTION DETAIL 'SF1'


RC STRIP FOOTING D-01
D-01 1:20
DA 200

SECTION
S-01
1:50
Y12 BAR @ 400 CRS
BOTH WAYS

0.48BMT COLOURBOND
CORRUGATED ROOF CLADDING
D-03 5.00° ON STEEL ROOF FRAMING
DA 201

DAMP PROOF MEMBRANE 150 BLOCKS WITH


D-04 ON 50mm SAND BLINDING RENDER & PAINT FINISH
DA 201
CANTILEVER
STEEL UB BEAM
Ch-02 WITH PAINT FINISH
Y12 STARTER BAR
@ 400 CRS

800mm REINFORCED STEEL UB COLUMN COMPACTED HARDFILL


190mm BLOCK
CONCRETE BLOCKWALL WITH PAINT FINISH
WITH RENDER &
PAINT FINISH 4 - Y16'S WITH

300
R10 TIES @ 300 CRS
800

±0
400

SECTION DETAIL 'SF1'


D-13 D-13
DA 200 1:20

SECTION
S-02
1:50

RevID ChID Change Name Date


CONSTRUCTION ISSUE
DESIGN:
MINISTRY OF YOUTH AND
REVISION
A
Ch-02 Changes to steel rafter and purlin size and profile
SPORTS 1:50, 1:20, 1:10 @
DRAWING SCALE
01 - A3
Ch-07 New compression strut Work in Progress CONSULTANT
TULAET PROJECTS
WIP
Ch-08 Change to footing detail
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS SECTION S-01
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 200
LYSAGHT CEE SECTION
0.48BMT COLOURBOND SHEET C10019 OR EQUIVALENT
METAL CORRUGATED ROOF CLADDING FIXED TO CLEAT WITH 0.48BMT COLOURBOND
FIXED TO PURLINS WITH No.14-20x50mm 2 - M12 BOLTS SHEET METAL CORRUGATED
SELF DRILLING & TAPPING SCREWS ROOF CLADDING

LYSAGHT CEE SECTION


C10019 OR EQUIVALENT

125 MIN.
100 28 65 30

STEEL UB RAFTER
WITH PAINT FINISH 10mm THK 284.5 x 148.9mm

149
PLATE WELD TO STRUT

Ch-09 125 x 75 x 8mm THK


STEEL CLEAT
WELDED TO TOP 88.9 x 5 CHC
COMPRESSION 250 x 25.7 UB COLUMN
OF RAFTER 182
STRUT WITH PAINT FINISH

10mm THK GUSSET


PLATE FULL WELD
SECTION DETAIL
D-03
1:10
SECTION DETAIL
D-14
1:10

0.48BMT COLOURBOND SHEET


METAL CORRUGATED ROOF
CLADDING FIXED TO PURLINS
WITH No.14-20x50mm SELF 350 x 150 x 16mm THK END PLATE
DA 201

DRILLING & TAPPING SCREWS


S-09

LYSAGHT CEE SECTION


C10019 OR EQUIVALENT

65
FIXED TO CLEAT WITH

24
2 - M12 BOLTS 6 - M20 x 70 HDG BOLT
25

85
65

25

16mm THK ENDPLATE

350
125 x 75 x 8mm THK STEEL CLEAT 250 x 25.7 UB BEAM

85
85

WELDED TO TOP OF RAFTER FULLY WELD


85

115
10mm THK STIFFENER

125
115

10mm STIFFENER PLATE 39 72 39

150
88.9 x 5mm CHS 150 150
250 x 25.7mm STEEL UB RAFTER
COMPRESSION WITH PAINT FINISH
STRUT
6 - M20 x 70 HDG BOLT SECTION DETAIL
S-09
8mm STIFFENER PLATE 1:10
DA 201
S-09

Ch-10

SECTION DETAIL
D-04
CONSTRUCTION ISSUE
1:10
RevID ChID Change Name Date A
MINISTRY OF YOUTH AND
DESIGN: REVISION

Ch-09 Change to rafter & purlin size


01 -
SPORTS 1:10 @ A3
DRAWING SCALE
Work in Progress
WIP Ch-10 Change to rafter & purlin size & connection detail CONSULTANT
TULAET PROJECTS

Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS SECTION DETAILS
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 201
LINE OF PAD FOOTING
STEEL BASE PLATE

10mm THK STIFFENER PLATE


250 x 25.7mm UB COLUMN
FULLY WELDED

20mm THK BASE PLATE 6 - M24 x 400mm


HDG ANCHOR BOLTS

20mm THK NON SHRINK GROUT


RC SLAB

100
REINFORCED CONCRETE

100
PAD FOOTING BLOCKWALL WITH RENDER
350
& PAINT FINISH
STEEL UB COLUMN
350 x 350mm RC PEDESTAL
WITH PAINT FINISH
RC BLOCKWALL

Y10 TIES 50 @ BOTH ENDS

400
PLAN DETAIL 'COL-1' REST @ 100 CRS
D-02
1:10
12 - Y16'S VERTICAL BARS

350 PAD FOOTING


308 RC STRIP FOOTING 'SF1'

300
77 77 77 77

6 - M24 x 400mm
HDG ANCHOR BOLTS
100mm THK COMPACTED
350 PAD FOOTING

56

LINE OF PAD FOOTING HARDFILL TO 95% MDD


S-07 S-07
DA 202 DA 202
184

72

250 x 25.7 UB COLUMN


56

Y16'S @ 250 CRS MAX


3 - Y10'S EXTRA TIES RUNNING BOTH WAYS
308 x 184 x 20mm
THK BASE PLATE
PAD FOOTING TO BE
10mm THK 1000mm x 1000mm x 300mm
STIFFENER
PLATE

SECTION DETAIL 'P3'&'PF1'


S-07
1:10
PLAN DETAIL 'P3' TYPICAL
D-12
1:10

Ch-11

RevID ChID Change Name Date


CONSTRUCTION ISSUE
DESIGN:
MINISTRY OF YOUTH AND
REVISION
A
01 -
SPORTS 1:10 @ A3
DRAWING SCALE
Ch-11 Change to column connection & footing Work in Progress
WIP
CONSULTANT
TULAET PROJECTS

Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS TYPICAL DETAILS
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 202
1800mm x 1050mm
TIMBER BACKBOARD
380
POWDER COATED 16mm DIA POWDER
STEEL HOOP COATED STEEL TO HOOP PROPRIETARY NETBALL
POST 50mm DIA. CHS
STEEL NETABLL POST
KNOTTED NYLON WITH POWDER COATED
TWINE TO NET FINISH

R 190 LINE OF 300mm DIA.


NYLON NET FOOTING/PIER BELOW 'P1'
REFER TO D-07
50 CHS STEEL POST
WITH POWDER
COATED FINISH

3,000
3,048

BASKETBALL SUPPORT POLE TO

2,400
BE POWDER COATED STEEL VOLLEYBALL NET TO BE REGULATION PLAN DETAIL 'P2'
D-05 FIVB NET (9.75m) MADE FROM 2mm PE D-08
DA 203 TWINE NET WITH A PVC COATED
QUAD - STITCHED HEADBAND
1:20
PVC POST PADDING (OPTIONAL) D-07
DA 203
50mm CHS STEEL POST WITH
POWDER COATED FINISH
LINE OF 50mm DIA.
NETBALL POST

500
GROUND SOCKET
WITH 500mm MIN. SOCKET CAP
GROUND SOCKET IN CONCRETE PIER
INTO GROUND REFER TO D-07

CONCRETE

100
300

500 MIN.
SECTION
S-06
60mm GALVANISED STEEL

600
GROUND SOCKET
SECTION 1:50
SECTION S-04 DRAINAGE HOLE BOTTOM

S-03 1:50 OF SOCKET

1:50 30MPa CONCRETE


TO FOOTING/PIER
RUBBLE PLACED
BENEATH SOCKET
FOR DRAINAGE
Ch-13 300

SECTION DETAIL
BASKETBALL BACKBOARD D-07
& HOOP SUPPORT POLE TO
MANUFACTURERS
10mm THK STIFFENERS
1:20
SPECIFICATIONS 20mm BASE PLATE
ON LEVELLING MORTAR
6 - M20 L BOLT 700mm MIN
INTO FOOTING WITH F72 MESH WITH 750 750
HEX HEAD & WASHER 30mm COVER
PAD FOOTING 'P1'
100

20mm THK BASE PLATE


WITH 6 - M20 THREADED
300

'L' ANCHOR BOLT

200 x 100 x 9.0 RHS


STEEL COLUMN TO BASKETBALL
20mm SAND BLINDING SUPPORT POST OR AS PER 24 - Y16 CAGE REINFORCEMENT
750

750
MANUFACTURERS SPECIFICATIONS WITH 75mm COVER WITH
100mm COMPACTED HARDFILL
1,000

Y10 TIES @ 100 CRS MAX


RC EDGE BEAM
WITH 4 - Y16'S WITH
R6 TIES @ 300 CRS LINE OF SLAB
700

DA 203 DA 203
S-10 S-10 Ch-12
10mm THK STIFFENERS

LINE OF BASKETBALL
SUPPORT POST OVER

PLAN DETAIL 'P1'


S-10
PROVIDE 24 - Y16 CAGE
REINFORCEMENT ON 75mm
750 300 100
1:20
CONCRETE COVER WITH
Y10 TIES @ 100 CRS MAX
PLAN DETAIL
D-06
SECTION DETAIL 'P1' 1:20
D-05

RevID ChID Change Name


1:20
Date
CONSTRUCTION ISSUE
DESIGN:
MINISTRY OF YOUTH AND
REVISION
A
Ch-12 Change to column connection & footing detail
01 -
SPORTS 1:50, 1:20 @ A3
DRAWING SCALE
Work in Progress
WIP Ch-13 Change to footing detail for drainage CONSULTANT
TULAET PROJECTS

Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS SECTION & DETAILS
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 203
250 x 25.7 UB
STEEL RAFTER

5mm BRACKETS
ANGLED
ACCORDINGLY

16mm DIA. BRACING ROD

C10019 PURLINS

GUSSET PLATE 6mm CONTINUOUS


WELD FILLET
BOTH SIDES
LINE OF ROOF

PLAN DETAIL
D-11
1:10

RevID ChID Change Name Date


CONSTRUCTION ISSUE
DESIGN:
MINISTRY OF YOUTH AND
REVISION
A
SPORTS 1:10 @ A3
DRAWING SCALE

CONSULTANT
TULAET PROJECTS

Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS DETAILS
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 204
NORTH ELEVATION
E-01
1:200

EAST ELEVATION WEST ELEVATION


E-02 E-04
1:200 1:200

SOUTH ELEVATION
E-03
1:200

RevID ChID Change Name Date


CONSTRUCTION ISSUE
DESIGN:
MINISTRY OF YOUTH AND
REVISION
A
SPORTS 1:200, 1:264.78,
DRAWING SCALE

CONSULTANT 1:361.59 @ A3
TULAET PROJECTS

Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS NORTH ELEVATION E-01
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 300

S-ar putea să vă placă și