DRAWING No. DESCRIPTION REV ISSUED PUBLISHED REMARK DRAWING No. DESCRIPTION REV ISSUED PUBLISHED REMARK
SUBMITTAL LETTER DA 002 SITE PLAN
DA 100 ALL COURTS PLAN DA 200 SECTION S-01 01 - WIP
DA 101 BASKETBALL SETOUT PLAN DA 201 SECTION DETAILS 01 - WIP
DA 102 FUTSAL COURT SETOUT PLAN DA 202 TYPICAL DETAILS 01 - WIP
DA 103 NETBALL COURT SETOUT PLAN DA 203 SECTION & DETAILS 01 - WIP
DA 104 SHELTER FLOOR PLAN DA 204 DETAILS
DA 105 FOOTING SETOUT PLAN 01 - WIP DA 300 NORTH ELEVATION E-01
DA 000 COVER PAGE DA 400 21 MAR at 0900h
DA 001 DRAWING LISTS & SYMBOLS DA 401 21 MAR at 1200h
CONSTRUCTION ISSUE
TULAET PROJECTS
PROPOSED MULTI-PURPOSE COURTS
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886
NORTH EFATE
GSEducationalVersion
SPORT DEFAULT COLOUR
NETBALL RED (OR ANY COLOUR BUT YELLOW)
BASKETBALL BLACK/WHITE
VOLLEYBALL GREEN/LIGHTBLUE
FUTSAL BLUE/YELLOW
Volleyball Court 1
Basketball Court
Netball Court
28,000 CONCRETE SLAB
Futsal Court
Shelter
Volleyball Court 2
CONSULTANT
TULAET PROJECTS
A3
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS ALL COURTS PLAN
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 100
3,285 22,783 VOLLEYBALL COURT 2,192 15,240 BASKETBALL COURT NOTES
DA 203
S-06
D-06 BASKETBALL POST WITH BASE PLATE AND FIXED
DA 203 TO FOOTING/PIER WITH L ANCHOR BOLTS FOR
908
PERMANENT INSTALLATION.
2,254
POST WITH PAINT FINISH.
1,097
D-09 STEEL HOOP TO HAVE A DIAMETER OF 450mm
12,592 VOLLEYBALL COURT
7,626
966 964
BACKBOARD TO BE 1200mm x 890mm MADE
FROM LAMINATED WOOD & FIBREGLASS
COMPOSITE.
8,992
12,802
Volleyball Court 1
480
VOLLEYBALL COURT NOTES:
5,175
PROTECTION FROM BEING CLOGGED OR
INTERNAL DAMAGE
1,800
50mm CHS STEEL POSTS WITH POWER COSTED
Shelter FINISH.
900
1,000
5,175
3,000
12,592 VOLLEYBALL COURT
1,800
12,802
8,992
Volleyball Court 2
7,626
3,000
5,760
BASKETBALL LINE MARKINGS TO BE
909
CONSULTANT
TULAET PROJECTS
A3
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS BASKETBALL SETOUT PLAN
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 101
NOTES
DIMENSIONS
GOAL DIMENSIONS: 3m(W) x 2m(H)
40,051 FUTSAL COURT GOAL BOTTOM DEPTH: 1980mm
GOAL TOP RUNBACK: 920mm
MATERIALS
GOALFRAME MADE FROM HEAVY DUTY 100mm x 110mm ELLIPTICAL ALUMINIUM ITH REINFRCED RIBS INSIDE FOR
ADDITIONAL STRENGTH.
3,897
EXTRA THICK TUBULAR ALUMINIUM ITH SUPPORT STAY FOR EXTRA BRACING FOR NET SUPPORT BARS.
USE HIGH TENSILE STAINLESS STEEL BOLTS, NUTS & WASHERS.
GOAL NETS CONSTRUCTED FROM 5mm OD BRAIDED HDPE TWINE WITH 100mm KNOTTED MESH SIZE IN WHITE.
ATTACH GOAL NETS TO GOALS INERNAL CHANNEL WITH TWIST & LOCK STYLE SAFETY CLIPS
20,000 FUTSAL COURT
3,000
Futsal Court
15,160
Shelter
6,000
4,103
FUTSAL LINE MARKINGS TO BE 50mm WIDE
40,000 AND PAINTED BLUE/YELLOW
CONSULTANT
TULAET PROJECTS
A3
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS FUTSAL COURT SETOUT PLAN
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 102
NOTES
Netball Court
D-08
S-04 DA 203
15,250
Shelter
DA 203
850
6,478
6,478
NETBALL LINE MARKINGS TO BE
50mm WIDE & PAINTED RED
CONSULTANT
TULAET PROJECTS
A3
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS NETBALL COURT SETOUT
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 PLAN DA 103
3,000 LEGEND:
150
COLOURBOND CORRUGATED
1,050
PAINT FINISH
SHEET METAL ROOFING ON 5° FALL
STEEL ROOF FRAMING 800mm HIGH BLOCKWALL STEEL UB COLUMN
WITH RENDER & PAINT FINISH WITH PAINTED FINISH
Shelter
±0 ±0
F: Conc. S-02 S-02
800mm HIGH BLOCKWALL
6,000
5,700
5,700
6,000
A: 15.39 m2 DA 200 DA 200
P1
P1
COL-1
Ch-01
150
150
800
P1
P1
P1
P1
LINE OF ROOF OVER
5.00° COLOURBOND CORRUGATED SHEET
D-02 +3,263 METAL ROOF CLADDING
DA 200
+2,700
150 2,700 150 D-11
E-07 DA 204 E-07 STEEL UB BEAM WITH
3,000 DA 104 DA 104 PAINT FINISH
DA 104
DA 104
DA 104
DA 104
E-06
E-08
E-06
E-08
800mm HIGH BLOCKWALL
DA 200
DA 200
WITH RENDER & PAINT FINISH STEEL UB COLUMN
S-01
S-01
DA 104 DA 104 WITH PAINTED FINISH
E-05 E-05
800
±0 ±0
800
±0 ±0 ±0 ±0
CONSULTANT
TULAET PROJECTS
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS SHELTER FLOOR PLAN
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 104
MEMBER SCHEDULE:
EB-1
EB-1
S1 100mm THK REINFORCED CONCRETE SLAB
EB1
EB1
EB-1 EB-1 EB-1 01 - WIP
SF1 PF1
P3
P2
EB1
P2
SF1
EB1
P2
SF1
S1
P2
P3
EB-1 SF1 PF1
EB-1 EB-1
EB-1
EB-1
EB1
EB1
P2
300
4 - Y12 LONGITUDUNAL BARS
WITH R6 TIES @ 300 CRS
EB1 EB1
EB1
20mm SAND BLINDING 100 300
P1 01 - WIP
DA 105
D-14
STEEL UB COLUMN MORTAR BEDDING
DA 201
WITH PAINT FINISH
Ch-07
800
±0
SECTION
S-01
1:50
Y12 BAR @ 400 CRS
BOTH WAYS
0.48BMT COLOURBOND
CORRUGATED ROOF CLADDING
D-03 5.00° ON STEEL ROOF FRAMING
DA 201
300
R10 TIES @ 300 CRS
800
±0
400
SECTION
S-02
1:50
125 MIN.
100 28 65 30
STEEL UB RAFTER
WITH PAINT FINISH 10mm THK 284.5 x 148.9mm
149
PLATE WELD TO STRUT
65
FIXED TO CLEAT WITH
24
2 - M12 BOLTS 6 - M20 x 70 HDG BOLT
25
85
65
25
350
125 x 75 x 8mm THK STEEL CLEAT 250 x 25.7 UB BEAM
85
85
115
10mm THK STIFFENER
125
115
150
88.9 x 5mm CHS 150 150
250 x 25.7mm STEEL UB RAFTER
COMPRESSION WITH PAINT FINISH
STRUT
6 - M20 x 70 HDG BOLT SECTION DETAIL
S-09
8mm STIFFENER PLATE 1:10
DA 201
S-09
Ch-10
SECTION DETAIL
D-04
CONSTRUCTION ISSUE
1:10
RevID ChID Change Name Date A
MINISTRY OF YOUTH AND
DESIGN: REVISION
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS SECTION DETAILS
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 201
LINE OF PAD FOOTING
STEEL BASE PLATE
100
REINFORCED CONCRETE
100
PAD FOOTING BLOCKWALL WITH RENDER
350
& PAINT FINISH
STEEL UB COLUMN
350 x 350mm RC PEDESTAL
WITH PAINT FINISH
RC BLOCKWALL
400
PLAN DETAIL 'COL-1' REST @ 100 CRS
D-02
1:10
12 - Y16'S VERTICAL BARS
300
77 77 77 77
6 - M24 x 400mm
HDG ANCHOR BOLTS
100mm THK COMPACTED
350 PAD FOOTING
56
72
Ch-11
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS TYPICAL DETAILS
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 202
1800mm x 1050mm
TIMBER BACKBOARD
380
POWDER COATED 16mm DIA POWDER
STEEL HOOP COATED STEEL TO HOOP PROPRIETARY NETBALL
POST 50mm DIA. CHS
STEEL NETABLL POST
KNOTTED NYLON WITH POWDER COATED
TWINE TO NET FINISH
3,000
3,048
2,400
BE POWDER COATED STEEL VOLLEYBALL NET TO BE REGULATION PLAN DETAIL 'P2'
D-05 FIVB NET (9.75m) MADE FROM 2mm PE D-08
DA 203 TWINE NET WITH A PVC COATED
QUAD - STITCHED HEADBAND
1:20
PVC POST PADDING (OPTIONAL) D-07
DA 203
50mm CHS STEEL POST WITH
POWDER COATED FINISH
LINE OF 50mm DIA.
NETBALL POST
500
GROUND SOCKET
WITH 500mm MIN. SOCKET CAP
GROUND SOCKET IN CONCRETE PIER
INTO GROUND REFER TO D-07
CONCRETE
100
300
500 MIN.
SECTION
S-06
60mm GALVANISED STEEL
600
GROUND SOCKET
SECTION 1:50
SECTION S-04 DRAINAGE HOLE BOTTOM
SECTION DETAIL
BASKETBALL BACKBOARD D-07
& HOOP SUPPORT POLE TO
MANUFACTURERS
10mm THK STIFFENERS
1:20
SPECIFICATIONS 20mm BASE PLATE
ON LEVELLING MORTAR
6 - M20 L BOLT 700mm MIN
INTO FOOTING WITH F72 MESH WITH 750 750
HEX HEAD & WASHER 30mm COVER
PAD FOOTING 'P1'
100
750
MANUFACTURERS SPECIFICATIONS WITH 75mm COVER WITH
100mm COMPACTED HARDFILL
1,000
DA 203 DA 203
S-10 S-10 Ch-12
10mm THK STIFFENERS
LINE OF BASKETBALL
SUPPORT POST OVER
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS SECTION & DETAILS
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 203
250 x 25.7 UB
STEEL RAFTER
5mm BRACKETS
ANGLED
ACCORDINGLY
C10019 PURLINS
PLAN DETAIL
D-11
1:10
CONSULTANT
TULAET PROJECTS
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS DETAILS
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 204
NORTH ELEVATION
E-01
1:200
SOUTH ELEVATION
E-03
1:200
CONSULTANT 1:361.59 @ A3
TULAET PROJECTS
Tulaet Projects, PO Box 5113, Port Vila, Vanuatu, Tel: +678 7100 886 PROPOSED MULTI-PURPOSE TECHNICIAN
SM
THE COPYRIGHT OF THESE DOCUMENTS REMAIN THE PROPERTY OF TULAET PROJECTS UNLESS OTHERWISE AGREED IN WRITING.
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK / DO NOT SCALE FROM THESE DRAWINGS - A COURTS NORTH ELEVATION E-01
GSEducationalVersion
CLARIFICATION NOTICE SHOULD BE REQUESTED FROM THE PRINCIPAL IF WRITTEN DIMENSION IS NOT GIVEN / SHOULD A CONTRADICTION
WITHIN THE DRAWN AND OR WRITTEN DOCUMENTATION BECOME EVIDENT. IF IN DOUBT ASK
DATE PRINTED: 10/10/2020 DA 300