Curriculum Vitae

PERSONAL DATA

Name and Surname: BAMO ALZANKANH


Date of birth: 25th Oct, 1987
Place of birth: Kirkuk, Iraq
Residence: Heran city2, house112, Erbil, Kurdistan, Iraq
Telephone contact: Mobile Slovakia: +421 918 610 965

Email: tomaspikula@gmail.com
Marital status: Single

EDUCATION

Diploma of Civil Engineering - Dipl. Eng. (MSc)


Branch: Structural Engineering
1987 – 1991 Faculty of Civil Engineering,
Technical University Kosice, Czechoslovakia, (www.tuke.sk)

COUNTRY EXPERIENCE

Saudi Arabia, Australia, United Arab Emirates, Uzbekistan, Kazakhstan, Turkey, Libya, Bulgaria,
Oman, Czech & Slovak Republic;

LANGUAGE SKILLS

Slovak & Czech – native


English - advanced, spoken and written
Russian - moderate, spoken and written
Professional positions and practice in essential projects:

Period: 2018 – 2007

2017 – Up To Now:

King Abdullah Economic City (USS 100 billion megaproject) is a new city consists of six
components - seaport, industrial district, education & healthcare zone, financial island, resort
and residential area. The Industrial Valley is largest zone at KAEC as a new industrial and
logistic hub adjacent to the seaport. The scope of service includes construction supervision
service for Industrial Valley Phase 3 - highways, earthworks, storm and sanitary drainage,
medium and low voltage power, potable and irrigation network and telecom connection.

In contract for ILF (www.ilf.com), Construction Supervision Contractor for EMAAR, The


Economic City (www.kaec.net ).
Position: Project Manager
Main Responsibilities:

- Management of Construction in compliance with Project Protocol,


- Coordination of Construction vs. Design implementation and Quality Monitoring,
- Coordination of Planning and Deployment vs. approved Project Construction Schedule,
- Coordination of applying of Company HSE policy,

Contractor: SSH – Salem Saleh Al-Hareth Est.


……………………………………………………………………

2014 - 2016: Ras Al Khair – Hafar Al Batin Water Transmission System Project

Project is Potable Water Transmission Pipeline System that transports Potable Water produced
at the new IWPP located in Ras Al Khair, at the east Coast of Saudi Arabia to the City of Hafar
Al Batin. The Design Capacity of the new Pipeline System is 110.000 m3/d. MAOP is 73 Bars.
Project includes Pumping Station & Tank Farm (API 650) and 44" Carbon Steel Pipeline 352 km
(API 1104/ASME B 31.4, ASME Sect IX), Tap Off Stations, six Reservoir and Filling Stations at
the Cities on the Pipeline Route, Hafar Al Batin Terminal Station, Branch Lines and Line Valve
Stations. 

In contract for ILF (www.ilf.com), Project Management Services Contractor for Saline Water


Conversion Corporation (www.swcc.gov.sa).

Position: Project Manager for the Stations and 44”Mainline (355 km) & variety of branch lines
Main Responsibilities:

- Management of Construction in compliance with Project Protocol,


- Coordination of Construction vs. Design implementation and Quality Monitoring,
- Coordination of Planning and Deployment vs. approved Project Construction Schedule,
- Coordination of applying of Company HSE policy,

Contractor: MAPA – LIMAK – MNG COMPANY (MLM)

2012 – 2013: Queensland Curtis Liquified Natural Gas Project, Australia

Queensland Curtis LNG (QCLNG) is the world's first project to turn gas from coal seams into
LNG. Project Target was to expand QGC's existing natural gas production in the Surat Basin of
southern Queensland, and then construction of 540km buried natural gas pipeline network
linking the gas fields to Gladstone along with the natural gas liquefaction plant on Curtis Island,
near Gladstone, where the gas is converted to LNG for export.

in contract for GL Industrial Services Australia Pty Ltd (www.dnvgl.com) as the Project
Management Services for Queensland Gas Company - BG group (www.qgc.com.au).

Position: Civil Engineer on the “Narrows”, Curtis Island nearby Gladstone.

Main Responsibilities:

- Coordination of Construction vs. Design implementation and Quality Monitoring,


- Coordination of Planning and Deployment vs. approved Project Construction Schedule,
- Coordination of applying of Company HSE policy,

Contractor: MCJV - a joint venture of McConnell Dowell Constructors (Aust.) Pty Ltd. and
Consolidated Contractors Company Australia (CCC)

……………………………………………………………

2010 – 2012: Abu Dhabi Crude Oil Pipeline Project – Habshan to Fujairah, UAE

Project facilitates the transferring of crude oil from Habshan production facilities to the Fujairah
Main Oil Terminal (MOT) on the eastern seaboard of the UAE. Pipeline is 384 km in length
starting from MP-21 to MOT. It is designated for transferring of 0.5 – 1.5 MBLD of crude oil.

in contract for ILF ( www.ilf.com ), as the Project Management Services Contractor for IPIC -
International Petroleum Investment Company

Position: Site Manager for the 48” Mainline constructed across UAE

responsible for management of Construction in compliance with Project Protocol, coordination of


Construction vs. Design implementation and Quality monitoring, coordination of Planning and
Deployment vs. approved Project Construction Schedule, coordination of applying of Company
HSE policy, coordination of site Engineering, as-built Design. 

Contractor: China Petroleum Engineering and Construction Corporation

……………………………………………………………

Sept. 2008 - 2009: Trans Asia (Turkmenistan-Uzbekistan-Kazakhstan-China) Gas Pipeline


Project - Uzbekistan Section

The Uzbekistan - China Gas Pipeline Project, begins from the border of Uzbekistan and
Turkmenistan, and terminates at the border of Uzbekistan and Kazakhstan. The gas flow rate
shall be 300 x 108 Nm3/a. The total length of the trunk line is 510.5km. The pipeline has double
line which is laid in parallel, with diameter of 1067mm (X70) and pressure of 9.81MPa. There are
32 valve chambers and 3 compression stations and 1 metering stations.

in contract for ILF ( www.ilf.com ), as the Project Management Services Contractor for TAP

Position: Construction Manager at Compressor Station of WKC1 - Southern Uzbekistan,


member of Project Management Team (PMT).

Main Responsibilities:

- Management of Construction in compliance with Project Protocol,


- Coordination of Construction vs. Design implementation and Quality Monitoring,
- Coordination of Planning and Deployment vs. approved Project Construction Schedule,
- Coordination of applying of Company HSE policy,

Contractor: China Petroleum Engineering and Construction Company


……………………………………………………

2007 – 2008: ATASU (Kazakhstan) - ALASHANKOU (China) Crude Oil Pipeline Project –
Kazakhstan section.

Project is crude oil pipeline system with total length of 962 km, the design throughput of the
pipeline in the first phase is 10x106 t / a. Project includes Atasu Initial Station, Alashankou Take-
over Metering Station, Intermediate Pump Station PS-9, Emergency Response Center ERC-11

in (consultancy) contract for ILF ( www.ilf.com ), as the Project Management Services Contractor
for KCP

Position: Construction Manager at Emergency Response Center ERC - 11, Usharal / Eastern
Kazakhstan, member of Project Management Team (PMT) & pipeline

Main Responsibilities:

- Management of Construction in compliance with Project Protocol,


- Coordination of Construction vs. Design implementation and Quality Monitoring,
- Coordination of Planning and Deployment vs. approved Project Construction Schedule,
- Confirmation for monthly payments to Contractor - signing off,
- Coordination of applying of Company HSE policy,
- Coordination of site engineering,

Contractor: China Petroleum Engineering and Construction Company

Period: 2006 – 2002

2005 - 2006: Komsomolskaya Oil Field and Export Pipelines Development Project,
Western Kazakhstan

in contract for ILF ( www.ilf.com ), as the Project Management Consultants for OMV/ Petrom
(www.petrom.com).

Position: Coordinator of Civil Works on the Komsomolskaya oil field, Caspian Sea

………………………………………………………………………………………………………………..

2004: Baku – Tbilisi – Ceyhan Crude Oil Pipeline Project – Turkish Section

(www.btc.com.tr) Project is crude oil pipeline system for the purpose of transporting up to 1
million barrels / day of oil from Sangachal in Azerbaijan via Georgia to Ceyhan, Turkey, with
marine access to international markets.

in contract for ILF ( www.ilf.com ), as the Engineer for Botas Petroleum Pipeline Corporation (
www.botas.gov.tr )

Position : Resident Engineer Pump Station PT3 - Cayirli and Mainline Lot A, B, C
………………………………………………………

2003: Western Libya Gas Pipeline Project – Libya, Branch – Onshore Pipelines: 16” Oil
pipeline 527 km & 32” Gas pipeline 527 km

in contract for Technip, Italy ( www.technip.com ) – Project Management Services Contractor


for Agip Gas Libya ( www.agip.com )

Position: Coordinator of Civil Works for both, Stations & Pipeline works
……………………………………………………….

2002: Beli Iskar Dam Rehabilitation Project, Bulgaria


in contract for Hydropol Project & Management, Czech Republic ( www.hydropol.cz )
-General Contractor for Sofijskaja Voda, Bulgaria

Position: Construction Manager

May 25, 2018. Dipl. Ing. Tomas Pikula