Form No : F/Prod/05

1st OFF FOR MOULD and LAST OFF FOR MOULD Rev. 03 Dt. 16.07.2019

Opr. Moulding Heat Code Date : Shift :

Sr. Specification Method Of Frequenc Observations - 1st OFF Verif'n aft Shut Down Observations - Last OFF
Parameters
No. Min Mean Max Inspection y 1 2 3 4 5 6 1 2 3 1 2 3 4 5 6

1 Part Name -- Visual 1 / Setup

2 Part No Clear Visibility Visual 1 / Setup

3 Heat No Clear Visibility Visual 1 / Setup

4 Use of Green Sand After mixing within 1Hr Visual 1 / Setup

5 Vent Cleaning Free from Blocking Visual 1 / Setup

6 Use of Sleeve As per WI Visual 1 / Setup

7 Use of Chill As per WI Visual 1 / Setup

Visual - Air
8 Air Pressure (Kg/Cm²) 6.00 6.75 7.50 1 / Setup
Pressure gauge

Free of Sand Drop after Core


9 Mould Cleanliness Visual 1 / Setup
Setting

Visual (Chalk Powder)


10 Mould Mismatch Visual 1 / Setup
1.5mm max

11 Physical Condition Free from Damages & SD Visual 1 / Setup

Sand to sand contact between


12 Mould Uneven
top & bottom Mould
Visual 1 / Setup

Mld Hard
13 Hardness 85.00 90.00 95.00
Tester
1 / Setup

14 Use of Core Damage Free Core Visual 1 / Setup

15 Use of Filter As per WI Visual 1 / Setup

Moulding Machine
16 Free from Damges Visual 1 / Setup
Plywood Condition

Checked By : Approved By :