Documente Academic
Documente Profesional
Documente Cultură
1 7/30/2020
2 7/30/2020
3 7/30/2020
4 7/30/2020
5 7/30/2020
6 8/1/2020
7 8/1/2020
8 8/1/2020
9 8/1/2020
10 8/1/2020
11 8/2/2020
12 8/2/2020
8/3/2020
8/3/2020
13 8/3/2020
8/3/2020
8/3/2020
14 8/3/2020
15 8/3/2020
16 8/5/2020
17 8/5/2020
18 8/5/2020
19 8/8/2020
20 8/8/2020
21 8/9/2020
22 8/9/2020
23 8/11/2020
24 8/11/2020
25 8/11/2020
26 8/11/2020
27 8/11/2020
28 8/11/2020
29 8/11/2020
30 8/11/2020
31 8/11/2020
32 8/11/2020
33 8/13/2020
34 8/13/2020
35 8/13/2020
36 8/13/2020
37 8/13/2020
38 8/13/2020
39 8/16/2020
40 8/16/2020
41 8/17/2020
42 8/17/2020
43 8/17/2020
44 8/17/2020
45 8/17/2020
46 8/18/2020
47 8/18/2020
48 8/18/2020
49 8/18/2020
50 8/18/2020
51 8/19/2020
52 8/19/2020
53 8/19/2020
54 8/19/2020
55 8/23/2020
56 8/23/2020
57 8/24/2020
58 8/24/2020
59 8/24/2020
60 8/24/2020
61 9/3/2020
62 9/5/2020
12 9/6/2020
13 9/6/2020
14 9/6/2020
11 9/7/2020
11 9/8/2020
6 9/13/2020
6 9/16/2020
7 9/16/2020
8 9/16/2020
9 9/16/2020
10 9/16/2020
11 9/16/2020
2 9/24/2020
WORK SHEDULE
FOLLOW UP FOR WELDING MACHINE GIVEN FOR REPAIRING
CTL MACHINE UNLOADED (DOT METER STILL WITH VENDOR NOT GIVEN TO US)
FOLLOW WITH CARPAINTER FOR MATERIAL
INQUIRY FOR NITRILE DISPOSABLE GLOVES
MTNL FOLLOW UP
MATERIAL ISSUED 1)2.5 CABLE 3 MTR
2.5 CABLE 3MTR
3 MODULE SWITCH BOARD 5PIN TOP
BLUE INSULATION TAPE
MOTOR TAGGING
CITIZEN WEIGHT MACHINE TO REPAIR PURPOSE (M/S SHREE ENTERPRISES BHANDUP)
LAB CRONE MACHINE PCB SEND FOR REPAIRING DOC NO. H98242154 THROUGH DTDC
ATUL/ VISHAL
IN PROCESS
RECEIVED
RECEIVED
DONE
DONE
DONE
DONE
IN PROCESS
DONE
DONE
DONE
DONE
DONE
DONE
DONE
INTRANSIST
PENDING
PENDING
STILL NOT RETURNED
DONE
DONE
WILL RETURNED ON TUESDAY (03-09-2020)
IN PROCESS
DONE
DONE
DONE
DONE
DONE
IN PROCESS
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
IN PROCESS
IN PROCESS
DONE
IN PROCESS
DONE
IN PROCESS
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
IN PROCESS
STILL NOT RETURNED
DONE
DONE
DISPATCHED
IN PROCESS
IN PROCESS
IN PROCESS
IN PROCESS
DONE
STILL NOT RETURNED
RECEIVED
DONE
DONE
IN PROCESS
DONE
DONE
DONE
DONE
DONE
DONE
FOLLOW UP WITH KAILASH VAIDYA (9322232530)
SR.NO DATE WORK SCHEDULE STATUS FINAL STATUS
HOLD FOR TRIAL
1 10/29/2020 THERMAL INKJET CARTRIDGE IQ797/800 EXCEL CODE FOR REVIES QUOTE (REF- JAGDISH
SIR)
2 10/29/2020 MINIMUM STOCK DETAILS TAKEN FROM PENDING FROM MAINTENANCE IN PROCESS
THREE DEPARTMENT
3 10/29/2020 LOCAL VENDOR FOR HCL & H2SO4 NO VENDOR FOR SMALL QUANTITY IN PROCESS
4 10/29/2020 SAFETY MATERIAL PURCHASE IN PROCESS IN PROCESS
TDS REPORT RECEIVED FROM 3
5 10/29/2020 SODIUM GLUCONATE ENQUIRY SUBMMITED
PARTY QUOTE RECEIVED
6 10/29/2020 OUTSIDE PREMISES CLEANING WORK IN PROCESS IN PROCESS
ENCODER TO HP AUTOMATION RECEIVED
OTHER 3 ENCODER YET TO
7 10/29/2020 (ONLY SN- 4580168 RECEIVED OTHER 3 RECEIVED IN PROCESS
ENCODER YET TO RECEIVED)
8 10/29/2020 SS 316 FLITER HOUSING PURCHASE WAITING FOR DRAWING & QUOTE IN PROCESS
9 10/29/2020 SS 316 STORAGE TANK 50 LTR WAITING FOR QUOTE IN PROCESS
10 10/29/2020 COTTON HAND GLOVES WAITING FOR QUOTE IN PROCESS
SS 316 GEAR PUMP WITH FLAME PROOF
11 10/29/2020 WAITING FOR QUOTE IN PROCESS
MOTOR
18 10/29/2020 FOLLOW UP FOR IMPORT INTERLEAVE PAPER PAYMENT DONE DOCUMENTATION IN PROCESS
SHHIPMENT IN PROCESS
19 10/29/2020 RTD PT-100 PURCHASE DONE DONE
20 10/29/2020 MECHNICAL & ELECTRICAL MATRIAL FOR DONE DONE
TRANSFORMER PURCHASE
SRNO. DEPARTMENT NAME HOD REMARK FINAL STATUS
1 MAINTENANCE HITESH RAMANI PENDING
2 ELECTRICAL SWAPNIL/SAMBHAJI GOT
3 LAB PARESH/PARAS JANI GOT
4 PACKING JAGDISH GOT
5 CHEMICAL MILESH MHETA GOT
6 PRODUCTION MILESH MHETA RO PENDING