Sheet1

Beton C20/25

t= 28 zile
w= 40 %

Mld= 33.76 kNm

M= 66.77 kNm
b= 30 cm b
h= 40 cm h

d= 2.5 cm

d'= 2.5 cm
Φ= 18 mm
Φ'= 12 mm
a= 3.4 cm 3.4
a'= 3.1 cm ap 3.1
h0=h-a= 36.6 cm ho -3.4
Aa= 12.56 cm 2
aap
A'a= 4.52 cm 2
aan
ν=Mld/M= 0.506 0.505616294743148
φ=k1k2k3φ0
φ0= 2.8 #N/A
k1= 1 1
k2= 1
k3= 1.3 1.3
φ= 3.64 3.64
Eb= 300000.00 daN/cm2 300000
Eb'=0.8Eb/(1+0.5νφ)= 124985.57 daN/cm 2
124940.132853008
ne=Ea/Eb' 16.8 ne 16.8019396159093
a1= 30 aa 30
b1= 564.91 bb 0
c1= -15890.4 cc 0
Δ=b12-4a1c1= 2225976.39 0
x1= 15.45 cm 24.8661773298591
x2= -34.28 cm -24.8661773298591
x= 15.45 cm x 15.45
lbc=bx3/12= 9221.57 cm4 ibc 0
2
lbi=lbc+(ne-1)Aa'(x-a') +neAa(h0-x)2= 114508.24 0
El=Eb'lbi= 14311878068.61 daNcm 2
14311877646.0968
l=bh3/12= 160000.00 cm4 0
Ebl= 48000000000.00 daNcm2 48000000000

Page 1
Sheet1

Ebl/Eb'lbi= 3.35 3.35385752798423


L= 6.30 m
fadm=L/250= 25.2 mm 25.2
fmax axis= 7.07 mm
fmax “real”= 23.71 mm 23.6845

Page 2
Sheet1

moment încovoietor din încărcările de


exploatare de lungă durată
moment încovoietor din încărcările de
exploatare totale
lăţime element de beton
înălţime element de beton
grosime strat de acoperire cu beton în
zona întinsă
grosime strat de acoperire cu beton în
zona comprimată
diametru armătură în zona întinsă
diametru armătură în zona comprimată

arie de armătură în zona întinsă


arie de armătură în zona comprimată

cm4

Page 3
Sheet1

aproximativ de atatea ori e mai mare


sageata decat cea rezultata din (aici
lipseste text)

(Cominatia 8 – valori normate)

Page 4
Materiale

Bc10 Bc15 Bc20 Bc25 Bc30 Bc35


C8/10 C12/15 C16/20 C20/25 C25/30 C28/35
φ0 3.70 3.30 3.00 2.80 2.70 2.65
EbdaN/cm2 210000 240000 270000 300000 325000 345000

t (zile) 28 60 90 120 >180


k1 1.00 0.70 0.60 0.55 0.50

w (%) 40 60 100
k3 1.30 1.00 0.50

Page 5
Materiale

Bc40 Bc50 Bc60


C32/40 C40/50 C50/60
2.60 2.50 2.45
360000 380000 400000

Page 6