To : Su Ung Jang (HEC) From: Mahmoud Awwad (GEI) Date Submitted : 31-Oct-20
Disciplines :
Structural Architectural Civil / Infrastructure Plumbing/ Piped Supply Systems
Electrical Medical Equipment Drainage/ Disposal Systems Security/ Access Control/ CCTV
HVAC ICT/ AV/ Telecom Fire & Life Safety Vertical Transportation Systems
Landscaping Infection Control Interior Design / FFE Facility Management & Maintenance
General Sustainability Signage/Wayfinding Building Information Modelling (BIM)
Work / Area / Location : 600.602 - Al-Maha Center Classification : Minor NCR Major NCR
A. Description of Non-Conformance :
See Attached Comments Sheet
NCR Originator
Identification
Requirements Reference (Codes, Standard, Specification, Drawing, MS, ITP, other) : Attached Photos
Error: Subreport could not be
shown.
Issued By : Mahmoud Awwad Signature : Date: 31-Oct-20
Proposals are unacceptable for the following reasons: (Revise & Resubmit new proposal):
Unacceptable Reasons :
E. Contractor confirmation : " I hereby confirm that remedial works & corrective action proposed in Section C are completed &
Confirmation
beup
Follow Closed.
& Close-out :
Closure
varying colors
- replace either the dark replace the dark-
or light color panels color panels
varying colors
- replace either the dark
or light color panels