Sunteți pe pagina 1din 4

Engineer's Representative : GEI Main Contractor : HEC Employer : HMC

Project No. : WC.AW.06 Ref. No. : WC.AW.06-GEI-HEC-NCR-0092- 00


Project Name : WC.AW.06 \ Al Wakra Campus - Al Maha Centre (AMC) for Children and Young Adults (and Infra)
NON CONFORMANCE REPORT (NCR)

To : Su Ung Jang (HEC) From: Mahmoud Awwad (GEI) Date Submitted : 31-Oct-20
Disciplines :
Structural Architectural Civil / Infrastructure Plumbing/ Piped Supply Systems
Electrical Medical Equipment Drainage/ Disposal Systems Security/ Access Control/ CCTV
HVAC ICT/ AV/ Telecom Fire & Life Safety Vertical Transportation Systems
Landscaping Infection Control Interior Design / FFE Facility Management & Maintenance
General Sustainability Signage/Wayfinding Building Information Modelling (BIM)
Work / Area / Location : 600.602 - Al-Maha Center Classification : Minor NCR Major NCR

A. Description of Non-Conformance :
See Attached Comments Sheet
NCR Originator
Identification

Requirements Reference (Codes, Standard, Specification, Drawing, MS, ITP, other) : Attached Photos
Error: Subreport could not be
shown.
Issued By : Mahmoud Awwad Signature : Date: 31-Oct-20

B. Root causes : Material Process Equipment Documentation Others

Description of root cause :


Consultant/Contractor
Root Cause & Remedy

C. Proposed Remedial / Corrective Action :

Rejected/Replace Rework Repair Use as Is

Target date of correction close out :

Commited By : Signature : Date:

D. NCR Original Review :


Proposals are acceptable and remedial work may proceed
Remedy Review
NCR Originator

Proposals are unacceptable for the following reasons: (Revise & Resubmit new proposal):
Unacceptable Reasons :

Reviewed by : Signature : Date:

E. Contractor confirmation : " I hereby confirm that remedial works & corrective action proposed in Section C are completed &
Confirmation

ready for inspection/review."


Consultant/
Contractor

Commited by : Signature : Date:

F. Follow up & Close-out :


Remedial works / Corrective Action have been undertaken and aceptable.This NCR may be Closed-out.
Remedial works / Corrective Action have been undertaken and not aceptable for the following reasons and this NCR may not
NCR Originator

beup
Follow Closed.
& Close-out :
Closure

Signed by : Signature : Date:

Printed on 10/31/2020 8:29:49 AM Page 1 of 3 PMWeb Generated Form#201667


replace the dark-
replace the color panels
damaged
panels

replace the dark-


varying colors
color panels
- replace either the dark cracked panels
or light color panels

varying colors
- replace either the dark replace the dark-
or light color panels color panels

GROUND FLOOR (LOBBY AND CORRIDOR AREAS)


varying colors replace the light-
- replace either the dark color panel
or light color panels

replace the dark- replace the light-


color panel color panels
replace the light-
color panel

replace the light-


color panels replace the light-
color panels

GROUND FLOOR (LOBBY AND CORRIDOR AREAS)


varying colors
- replace either the dark replace the dark-
or light color panels color panels

varying colors
- replace either the dark
or light color panels

GROUND FLOOR (LOBBY AND CORRIDOR AREAS)