Rig Inspection Checklist

Ref Rig Inspection Checklist Test Results/Comments


Derrick
Derrick Structure
Valid inspection report on derrick by approved body
Identification plate fitted to derrick and in accordance to certification and
correct ratings.
Type and date of last repairs on derrick, if any. Inspect visually.
Visual inspection of derrick (no bent members, no extensive corrosion,
no 'home' welding, no suspension without proper certified pad-eyes, no
debris/tools lying round in beams)
Visual inspection of fingerboard, incl. winch
Rig up and function test of stabbing board, incl. winch, free movement,
safety lines
Check guide rollers , free fall device, stop chute and safety harness.
Check parking brake.
Check that air supply on the platform is satisfactory.
Proceed to functional tests to maximum extent.
Check NDT inspection reports.
Check all shackles/pins have safety-pins and are inserted pointing
down.
Inspect crown sheaves and bearings.
Check that safety bars (to prevent blockline jumping out of sheaves) is
installed on crown block and in good condition (not more than 100 degr.
of arc allowed unprotected).
Check that bumper-blocks (wooden blocks under the crown-block) are
in place and well secured.
Safety cable around crown bumper timber (API RP 54.8.2.16), and
heavy duty wire mesh around the crown bumper timber (API RP 54
8.2.16).
Check air-winch sheaves visually for damage and free movement.
Check maintenance records of airwinch lines
Check sheaves visually for damage and free movement: tong-lines
Check maintenance records of tong-lines
Check that derrick is properly centered over the RT.
Check for any interference between hoisting equipment, stabbing
board,tong lines, winch lines, platforms installed in the mast.
Check safety harness and ant fall device for derrickman.
Derrick fittings
Check that all light fixtures are equipped with safety lines and are
explosive proof (Ex).
Check that all other small equipment (ie. small blocks) has safety lines
fitted.
Are drilling line spooler(s) in good working order.
Are drilling line spooler(s) provided with safety lines.
Check that all ladders and platforms are undamaged, properly installed
and secured according to regulations/manufacturer's specifications and
provided with adequate handrails, where appropriate.
Visually check for damage to climbing safety line/rail. Check last
inspection dates on climbing/inertia gear. Check certificate of safety line
(if no rail is fitted)
Is the derrick escape line freely accessible/clear of obstructions?
Perform test on stop chute system (use dummy, not life person).
Are all hoses/lines free-hanging or free-running in the derrick, without
interference to each other, or the derrick structure.

1 updated: 04/11/20
Rig Inspection Checklist
Is the (spare) standpipe properly fixed (dedicated pad-eyes) in the
derrick? No corrosion between brackets and pipe-work?
Is the (spare) kelly-hose fitted with safety lines on both ends (to
dedicated pad-eyes)?
Are the safety-clamps of the mud hose of correct design (sufficient
length) as not to damage the hose?
Is the 2" standpipe properly fixed in the derrick? No corrosion between
brackets and pipe-work?
Is the cement-hose fitted with safety lines on both ends (to dedicated
pad-eyes)?
Are all wind-walls, cladding, etc. properly installed and secured?
Is the vent line of the free-gas separator properly fixed in the derrick?
No corrosion between brackets and pipe-work?
Ensure lighting is adequate
Rigfloor:
Mus possess two separate access points
Surface must be flat, non slippery
It needs a removable safety barrier on the pipe ramp.
2Full flow safety valve to be on rig floor including handling device and
.short xo’s.
Check gray valve operation.
Check drop in dart and if it passes through the drill string.
Check rotating head
Check cable cutter, if sharp enough.

BOP and Control System


BOP-Stack
Contractors BOP stacks should have been inspected, shop tested and
certified. Check last inspection, test reports and certification.
NDT reports on: Ram piston hubs, shear ram blades, bonnet bolts.
Ensure hydraulic connections are welded to the BOP body (not
threaded). Check that there are no threaded connections on
pressure systems above 3,000 psi(API RP 53 8.2.b).
Ensure maintenance tools (e.g. spanners) and handwheels (with
extensions, if required) are available (API RP 53 17.5.8).
Function all manual locking spindles.
Check stripping bottle on size (13-5/8" BOP: 5 gallon), rating, last test,
certification, proper installation, proper functioning/calibration of specific
fittings (valves, p-gauges, connections). Check pre charge.
Is the stripping tank calibrated for the drill pipe in use?
Check all documentation/certification of spools, DSA'a etc.
CIW type clamps to be MPI inspected as per CIW product alert.
Check both choke and kill line are adjustable suspended from the stack
to avoid bending forces at connections.
Remove bonnets and inspect ram cavities and ram blocks. Take wear
measurements.
Pressure test operating system ( opening and close sides) to maximum
operating pressure.
Remove annular bag for internal inspection.

2 updated: 04/11/20
Rig Inspection Checklist
Check bell nipple of BOP, check for space out, trip tank hook up, bleed
off line hook up. Proper bell at top.
Check riser, for quick connection & valve/space out and hook up of flow
line and trip tank.
Check teststump/condition of ring groove. Practicality of testing offline.
Test BOP to full SWP on the stump.
Check BOP test procedures.
Check testpump, calibration, charts. Spares, including charts.
BOP Control System
3.2.1 Check out hydraulic accumulator unit based on manufacturer
specifications including (but not limited to) the following aspects:
-fluid level indicator on reservoir
-low-level alarm in driller's doghouse
-Low air pressure alarm in driller's doghouse
-Driller panel running on standby power
-clearly labeled ¾ valves
-calibrated pressure gauges
-proper functioning of pressure regulators (annular- and manifold-)
-Ex-certification of electrical system
-proper operation of air-pumps, including cut-in/cut-out valves 2400 psi-
2700psi API 16D 2.2.1.3
-proper operation of electric pump(s), including cut-in/cut-out switches
2600PSI-2900PSI API 16D 2.2.1.3
-last repair/overhaul/certification reports/certificates
-P-test certificates for maximal rating (normally 5k, accumulator bottles
3k)
-Will air be supplied from the emergency system?
-Proper functioning of oiler and moist-catcher in rig air supply
-Hydraulic hoses undamaged, in good condition, fire resistant, 5k
MSWP.
-Hammer-connections welded to pipe (not threaded)
-Megger-test of electric motor
-Drive chains to be checked.
Bleed off all hydraulic pressure and check pre-charge pressure of all
bottles.
Do accumulator performance test (Close and open all preventers and
close one ram and one preventer again, system to be charged up to
3000 psi in 15min). API 16D 2.2.1.3.
Ensure correct layout of remote BOP panels. Functions test all panels
completely. Ensure remote pressure gauges indicate with sufficient
accuracy (+/- 5%)
BOP control system to be tested to maximum operating pressure 15
mins.
Is spare nitrogen on board?
Is nitrogen re-fill equipment calibrated/certified?
Check operation of remote controlled annular regulator.API 16D
2.2.1.7.3.
Ensure there is an emergency air back up system for BOP control (N2
or airvessel) API RP 53 17.3.8.
Identify accumulator vent valve with "normally closed valve". Sign next
to koomey pumps "Automatic equipment starts without warning".
Choke- and Kill Systems
Choke Manifold
Remove 1 valve internals for inspection.
Remove both manual and automatic choke's internals for inspection.
Flush all lines, valves and chokes with water.
3 updated: 04/11/20
Rig Inspection Checklist
Operate all valves/chokes full open - full close.
Operate remotely operated valves/chokes from all possible remote
stations.
Pressure test all valves and chokes (from the correct direction) in the
choke manifold.
Low pressure: 500psi/5 mins
High pressure: 5000 psi/10 mins
The low test should be performed prior to the high test (not the other
way around). Pressure may be bled off fully between tests. All tests to
be recorded on a pressure recorder.
Ensure all grease caps are installed on the valves. These caps cover
check valves and are and important safety item.
0-20 psi Gauge from poor boy, so that driller can read it from doghouse.
Valves no's clearly marked and drawing on rigfloor.
Choke and Kill Lines
Flush all lines and valves with water.
Operate all valves full open - full close.
Operate remotely operated valves/chokes from all possible remote
stations.
Pressure test all lines and each valve (from the correct direction).
Low pressure: 500psi/5mins
High pressure: 5000 psi/10 mins
The low test should be performed prior to the high test (not the other
way around). Pressure may be bled off fully between tests. All tests to
be recorded on a pressure recorder.
Check Coflexip for external damage.
Ensure appropriate safety lines are attached to dedicated fixings.
Check certificate + p-test similar to choke manifold.
Ensure kill-line is p-tested and certified. If chicksans are used, redress
the swivels and perform complete (lo/hi) p-test.
Check overboard line is unobstructed and properly anchored (no rust
between brackets and pipe).
Check flare-line is suitably positioned, properly anchored, unobstructed.
Mud Circulation System
Standpipe & Manifold
All connections should be welded (not threaded)
Flush all standpipes and (spare) kelly hoses and cement hoses.
Remove 1 valve's internal.
Is there a pressure gauge on the standpipe that can be seen by the
driller?
Are all valves clearly identified.
Check yearly wall thickness PM on HP piping.
P-test (hi/lo) all valves in the standpipe manifold to the MSWP (on
chart).
P-test (hi/lo) all hoses to the MSWP (on chart).
Pressure test chicksans to MSWP. Check for safety chain or wire.
Check chicksan documentation (inventory/history and pressure test
recording).
Check if a hose is available for washing down and general use.
Check if lo-torq valves are easy to move and operating bars are
available
Check bleed off line, where does line go to and is it practical to rig up.
Check that repair of chicksans is done by competent person.
Have fire drill on rigfloor and check drain system.
Mud Tanks Transfer System

4 updated: 04/11/20
Rig Inspection Checklist
Check that all lines are properly labeled or colour-coded. Drawing
available on mudpits.
Fill up all mud tanks individually with water. Check for leaks (especially
leaking from one into another). If possible, perform internal visual
inspection.
Calibrate all tank level measuring systems when filling up, especially
the triptank.
Run all agitators in full tanks for 2 hours. Check for overheating and
noise.
Transfer water between tanks. Measure flow rate (bbl/min) and pump
pressure. If possible compare the used current (Amps) to what the ID-
plate states. (actual current should be some 25% lower than stated on
motor)
Check the big-bag hopper for good working order.
Check if the standard hoppers are in good working order
Pump through all mudguns. Ensure their free movement.
Function test the following equipment:
-Shale shakers.
-Desander (also measure discharge rates)
-Mudcleaner
-Desilter (also measure discharge rates). Pressure gauge installed?
-Vacuum degasser. Pressure gauge installed?
Open up tank for internal inspection.
-Run centrifuge and listen to bearings. Check if line up from and to pits
is OK. Check competency of crews with centrifuge.
Starters, valves and lines to be identified.
Are all valves moving freely.
Are centrifugal pumps running fine and are gland packings not leaking?
.
Test the mud transfer system to it's capabilities, paying special attention
to:
-from reserve to active
-from active to cement unit
-from reserve to cement unit
-from active to trip-tank
-from active to rig pumps
-from active to triptank
-through poor boy degasser
-through mud return system
All valves & lines to be clearly identified
Test and measure the efficiency of lifting seawater into the
active/reserve pits, under 'normal' circumstances and under
'emergency' circumstances (ie. as much as possible).
Test and measure the efficiency of the drill water supply to the
active/reserve pits.
Check diesel supply lines. Check pressure on lines and check output of
diesel supply pump.
Check correct line-up and functioning of Trip Tank, including calibration
of level indicator.
Check correct line-up and calibration of Stripping tank, if fitted.
Fill up sandtraps and check for leakage.
Ample safety equipment to be available at mixing area, eye protection,
emergency showers, eyewash showers, rubber gloves, aprons, dust
masks etc. In a well marked designated locker.
Material data sheets available at mixing area.
Exercise mixing of caustic and drums.
5 updated: 04/11/20
Rig Inspection Checklist
Internal inspection mudpits including condition of valves & seats.
Special attention to corroded seats.
Check re circulating pump and cellar-submersible pumps
Mixing capacity
To determine the mixing capacity for well control purposes. Weight up
the existing mud to the highest possible value and determine the mixing
capacity this to be done as soon as mud is available for mixing. If
possible before commencing operations.
High Pressure Mud Pumps
Run each mud pump with water from active tanks 1 and 2, through a
manual choke back to tanks 2 and 1, for volumetric and load tests at:
- 40 spm @ 35% of MSWP for 1/2 hours
- 90 spm @ 100% of MSWP for 1/2 hours
- 120 spm @ 90% of MSWP for 1/2 hours
to test:
- flow rate
- volumetric efficiency
- hydraulic horse power with and without
discharge pumps
- overheating of bearings, drive motors, generators, switch-gear
Run both pumps in parallel with the following parameters:
- 90 spm @ full MSWP for 1/2 hours
- 100 spm @ full MSWP for 1/2 hours
- 120 spm @ full MSWP for 1/2 hours
Pay attention to the performance of the powerplant in general and
specifically to overheating of bearings, drive motors, generators, switch-
gear
For each motor and evaluation must be made as to maximum power
obtainable over a minimum of on hour. Based on flowrat x pressure.
Check for recent reports on breaker and safety testing and a thermo
graphic survey.
P-test both mudpumps and HP lines to the systems MSWP 15 mins on
chart recorder.
Check pressures on discharge and suction pulsation dampener. Check
for nitrogen bottles in pump room and N2 charging equipment.
Check that lines behind pop-off valves are self draining.
Check that gauges on MP's are calibrated.
Remove all suction & discharge valves
Remove one valve seats.
Remove discharge strainer.
Remove suction strainer.
Remove 1 discharge valve internals.
No screwed connection allowed on discharge manifold. Including
gauges and pop-off.
Check competency of crews by changing swab & swab+liner
Time the change out and check on availability of tools.
Exercise to be done by both shifts.
Flow-line & Shale Shakers
Is the flow line minimally bent, to prevent cuttings build-up?
Can the flow line easily be cleaned/jetted (e.g. when clay-balls occur)?
Run the shale shakers (with fluid) and check for excessive noise,
vibration.
Check relevant spare parts are on board.
Are spare screens properly stored?
Check complete system for leakage.
Check flow-redistribution system works properly and is easily
6 updated: 04/11/20
Rig Inspection Checklist
accessible.
Check if initial set of screens are new or acceptable.
Check storage of new and used screens.
Let shaker hands change screen and check on competency
Drilling Equipment
Drawworks
Operate main drum on high and low clutch on each DC motor. Operate
cathead controls and function test sandreel.
Check how long it takes to engage low and high clutch.
Check if people know how to use emergency clutch.
Check water and air pressure
Check if brake can me move freely and holds block if released.
Check airdryer for drawworks instrumentation.
Check and set and test Crown-o-Matic. Check air supply to console, air
clutches and quick release valves.
Check the setting/functioning of the low air-pressure alarm.
Test all K.E.M.S. functions (kinematic energy monitoring system)
Hoist block up to highest position. Check for interference.
Lower block with maximum braking on Elmagco.
Note current readout and check Elmagco on battery back up system.
Open the Elmagco hand controls and visually inspect the contacts (for
oxidization).
Check recent records on air gap readings, megger readings and coil
ohm readings taken.
Repeat 6.1.5 with the battery charger(s) switched off. Observe voltage
drop.
Check proper installation and operation of dead-line anchor and sensor.
Check gap in sensor with National manual & ensure correct gap.
Check that the frame is securely bolted on to the substructure beams.
Check that the dead line sheave moves freely.
Control the last MPI report.
Check that dead-line clamp is of correct type and inserts are compatible
with the drilling line.
Free-fall the block (safely!) from the COM position to check fast line is
properly guided by the spooler(s).
Check for excessive play on the brake/yoke linkage.
Brake/yoke/brake-bands should be NDT-ed for cracks.
Check thickness of brake-lining. Are sufficient spare brake pads on
board (correct type? Sufficient nuts/bolts/rivets?)
Are all moving parts guarded?
Examine the site register to see if it contains the cable’s certificate of
origin and the date of installation and if slipping, cuts and the results of
controls effected are logged.
Measure the length of cable remaining on the reel, which should be
long enough to give time for its replacement if needed.
Check amount of spare wire & check condition of wire on drum, check
fast line clamp.
Check administration of tonmiles.
Check condition of fastline spooler.
Monitor condition of spline coupling drawworks/elmagco, coupling to be
locked in engage position.
Check condition of brake rims and pads.
Check cathead line pull and adjust to required torque. Make up 7000lbs
and break out 14000lbs line pull.
Inspect drive chains

7 updated: 04/11/20
Rig Inspection Checklist
Function test survey line winch.
General appearance
Positioning of the pulley to the mast.
Check line diameter and winch carrying capacity.
Run winch, check pressures/amps.
Practice slipping and cutting. Check for competency and tools. Check
procedures. See if PJSM is done properly.
Rotary table
-Run table at various speeds in high and low gear from 25 to maxi
272rpm.
-Check reverse.
-Run each speed for 15 min.
-Check cooling, lubricating systems.
-Check for noise and overheating.
Run table against mechanical locking device and rotary brake. Ensure
lock is working properly in both directions. Check torque in high and low
gear and adjust limit switch to 21,500 ft/lb max. allowable torque.
Check that crews are able to lock rotary in both direction.
Check for sliding against air brake.
Check maintenance records of rotary table.
Visual inspection on rotary support beams. Check SWL/NDT records.
Lift covers for gearbox, coupling and DC motor inspection.
Install and remove bushings, check for locking. Check lifting devices.
Topdrive
Most dropped-objects incidents are related to topdrives and their
maintenance!
Inspect TDS maintenance records and certification.
Check last MPI on mainshaft, check manufacturers recommendation.
Check certification of swivel and SWL to be visible.
Check all fittings, connections for proper installation and safety-pins.
Check all relevant parts have safety-lines fitted.
Check the guide/dolly/track system for proper installation, damage or
bending, safety-lines and safety-pins fitted.
Check free-running of hoses, cables when TDS is run from upper limit
to RT.
Ensure hoses/cables are still 'naturally' bent when COM is activated
(check minimum radius allowance with hose/cable manufacturer's
data). Check for any further allowable travel and record (how far can
you pick up beyond COM?)
Check saver-sub for wear and/or cracks. Ensure spare inspected saver-
sub is available.
Check proper operation of TDS camera system (clarity, position, night-
lighting, pan/tilt functions)(N/A)
Check proper function of link-tilt system.
Ensure relevant parts have safety-pins and safety-wires fitted.
Run TDS at various speeds in high and low gear from 25 to maxi rpm.
Run each speed for 15 min. Check cooling, lubricating systems.
Check for noise and overheating.
Run TDS against mechanical locking device. Check torque in high and
low gear and adjust limit switch to 21,500 ft/lb max. allowable torque.
Check if mudlogging unit reads same torque and RPM
Check proper operation of TDS make-up/break-out jaws. Test for
maximal torque in accordance with manufacturer's specifications.
Ensure relevant parts are fitted with safety-pins/safety-lines.
Inspection of traveling sheaves and bearings
Check locking system of block if applicable
8 updated: 04/11/20
Rig Inspection Checklist
Check 5 yearly refurbishment and MPI report of block/hook and crown
block.

Function test pipehandler.


Test all alarms
Measure the swivel bearing clearance.
Check competency of crews on changing
IBOP
Saver sub
Washpipe
Greasing TDS, check on recording and coverage.
Connect to 5” DP, check counter weight and proper grip of dies.
P/U a joint from the mousehole and make up.
Pressure test washpipe, rotate 3000psi and standstill 5000psi
Instrumentation & Alarms
Driller's Console Instrumentation
All DCR instruments to be:
- checked
- explosion proof or pressurized
- calibrated
- tested
Separately prior to and during testing of related equipment.
All electronic instrumentation (Hitec SDI 100) to be checked/calibrated
against the conventional instruments.
Check the Martin Decker against the known block/TDS weight. Ensure
proper working of vernier.
Check correct scales are fitted in martin Decker in relation to the
number of lines strung.
Function test and adjust the multipen recorder during the various
equipment tests.
Function test and check the electronic data recording system (Hitec SDI
100), storage capacity and connection to DSV office once the monitor is
installed.
Check all alarms near the driller's position are operational/tested and
clearly marked/identified.
Ensure all relevant enclosures are air-purged. Check loss of purge air-
pressure alarm.
All gauges to be clearly identified.
Check if gauges are in proper units, as per company policy.
Iron Roughneck (IR) and Rigtongs
Check maintenance records and certification of IR.
Check IR for free travel over tracks and proper centralization over the
RT. Ensure free travel of cable/hose bundle and check bundle for
damage.
Check that operating controls and operating position is safe and
ergonomically acceptable.
Check that all guards (to protect from moving parts and/or hot parts) are
in place and properly installed with safety-pins/lock-nuts.
Check the unit for oil-leaks, play on the various moving parts, general
wear and tear.
Test IR by making up and breaking maximal size DC to be handled by
IR and 3-1/2" DP. Check torque read-outs are calibrated and/or check
against the RT gauges.
Check rigtongs for general wear and tear. Pay special attention to the
hinge-pins (should have almost no free play). Check the condition of
9 updated: 04/11/20
Rig Inspection Checklist
latch springs.
Check most recent NDT report/certificate
Ensure tongs are properly hung and suspension lines and counter-
weights are freely moving.
Check for excessive wear in the tong-die seats.
Check that all back posts are rigid and not bent. Control the MPI reports
of the load bearing parts (pad eyes and back up support welds).
All spinning and break out cables or chains be new.
Exercise tong die change out/change of pipe size.
Ezy-Tork
Check ET on proper functioning, oil-leaks, damage
Check maintenance records/certification.
Test-pull ET system to maximum force in accordance to manufacturer's
data.
Hoisting & Lifting Equipment API RP 54 8.6
Hoisting and lifting equipment includes, but is not limited to: cables,
wire, pad-eyes, lifting eyes, lugs, trolley-beams, shackles, chain-hoists,
sheaves
All hoisting and lifting equipment should be checked minimally on the
following:
-certification with remaining validity of 6 months
-clearly identification of MSWL (printed, stamped or colour-coded)
-damage, wear and tear
-maintenance/repair-reports, where applicable
Thoroughly inspected monthly with a record of inspections
-groove-wear in sheaves
-proper anchoring for winches
BOP stack trolley & tackle
Function-test unloaded trolleys and chain-hoists on all functions (incl.
brakes)
Check proper lifting operation with maximum anticipated load (13-5/8"
BOP-stack), including brake-system.
Rigfloor airwinches, finger-board winch, stabbing-board winch,
cellar-winches, catwalk-winch
Function-test and load test to MSWP, in accordance to Certifying
Body's criteria (ABS). SWL needs to be marked.
Check all drum guards and cable spooler are properly fitted and
functioning.
Ensure brake is holding at maximum load.
Ensure brake can be applied without air-pressure (mechanical) or is
fail-safe.
Ensure dry air supply is sufficient and supply can be isolated from
operating position with ball-valve close to winch.
Ensure air-supply line/hose is optimally protected against damage.
Ensure that man-riding winches are appropriately marked and comply
with the requirements as laid down by the Certifying Body (ABS).
Ensure block hang-off lines, pad-eyes, shackles etc. are tested/certified
to requirements referred to above (point 7).
Operating handles to return to neutral when released. Check
instructions (up/down)clearly displayed.
Check personnel basket is tested and certified.
Check MPI records of winch foundations.
Inspect cables and terminations.

10 updated: 04/11/20
Rig Inspection Checklist

Cranes
9.1.1 Check maintenance-, repair- and certification records.
Visually inspect the following aspects:
-hoist wires
-boom (undamaged)
-all instrumentation operational
-cab-windows clear and crack-free
Operate all functions of crane; ensure complete rotation and boom-
topping tested.
Check proper functioning and calibration of alarms and instrumentation.
Weight indicator and SWL alarms (visual warning for crane operator at
90% and 97.5% of the SWL and audible outside crane at 102.5% and
110% of the SWL).
Load rating chart available in crane cabin.
Boom angle indicator visible from cabin.
Floodlights working and safety slings installed.
Fire extinguisher in the crane cabins API spec 2D 2.4.6.
Check last load test done on crane.

Auxiliary equipment
Ventilation Systems
Check buckblowers for pits & rigfloor and portable one.
Check relevant ventilation systems are equipped with (automatic) fire-
dampers; Check free movement.

Portable equipment
Check that all portable electrical equipment used on deck (e.g. flood
lights/buck blower) is Ex and equipped with armored cable.

Cellar submersible Pumps


Check proper operation of pumps (5.2.11) and determine redundancy.
Check maintenance records.
Visually inspect state and suction-strainer of pumps.

Chemical Storage
Is an eye-wash station present
Check the following on the forklift:
-spark arrestor fitted in exhaust (zone 2 certified)
-reversing alarm fitted/operational
-condition of tyres
-(hand)brake operational
-fork side-stoppers fitted
-driver protection above/front fitted
-certification ok
-SWL displayed
Are laminated SHOC cards available in appropriate language(s) for the
chemicals in use?
Engine Room
Power plant
Check powerplant for general status.
Check maintenance records of drive engines.
Check maintenance records of AC and DC generators (incl. last
megger-tests)
Test all individual alarms/shutdowns on all engines

11 updated: 04/11/20
Rig Inspection Checklist
Low oil pressure
High water temperature
Overspeed
High crankcase pressure
Remote shutdown from drillfloor.
Internal inspections as required
Run on load. Test reverse current (or under-voltage/frequency) trips
and load sharing.
Perform alternator drop off test.
Test the value of the power limit setting for each alternator.
Check records of recent main breaker inspections and safety tests.
Internal inspection of alternators, transformers, DC motors, AC motors,
fire pumps, ballast pump, BOP control triplex pump and other critical
equipment.
Check for competency of mechanic/electrician/moterman with Cat 3512
Test diesel of daytank, after centrifuge (centrifuge needs to run on
daytank all the time)
Rig air System
Check rig-air system, including compressors, relief valves, receiver
vessels, certification etc.
Service, start air and cold start-run compressors, to be run under load.
Check airdryer.
Check that there is a notice that air compressor starts automatically and
SWP on air receivers.
Run all airwinches and check pressures.
Switchboard/Transformers
Check clear markings "high voltage" are in place, where applicable.
Check that switchroom floor is covered with rubber matting (for isolation
purposes)
Visual check HV cabling for damage in exposed locations, incl.
Transformers
Check appropriate fire extinguishers are available.
Check ventilation as above.
Check all instruments and warning/status lights on the switch panels
are clearly labeled and in good working order.

Safety Equipment
Alarms
Function test general alarms (ie audible/visible in all area's of
installation)
Test "break-glass" alarm stations
Test fire/smoke detectors in conjunction with testing the central fire/gas
panel
Test gas sensors with the appropriate test-gasses
Function test pressurization alarms.
Fire-fighting Equipment
Review the fire-station plan and ensure adequacy (check
certification/approval).
Check all extinguishers for:
-correct certification
-condition (pressure OK?, cracked hoses?)
-type & location
-accessibility
Check all 'wet' stations for:
-hose(s) present and usable?
12 updated: 04/11/20
Rig Inspection Checklist
-keys/wrenches for valves available at location?
-do all valves have hand-wheels fitted & fixed?
-are nozzles present and operable (no damage, adjustable, correct
connection fitted)
-are all hose-fittings compatible?
-Have hoses and lines been pressure tested, API.
CO2 system will be inspected and alarms and ventilation shut downs
tested. Inspection report will be evaluated.
Inspection of fire fighting stations, halon, CO2, foam systems, deluge
systems and sprinkler systems and to be function tested (if applicable).
Function test of fire pumps and emergency fire pump.
Check all fire-team cabinets for:
-adequate, sufficient and complete FF suits (including gloves,
helmets/hoods, boots)?
-Adequate, sufficient and tested breathing apparatus?
-Spare air cylinders tested/available?
-List all other equipment and check for adequacy.
Is the compressor system (incl. filters) certified/tested to recharge
breathing apparatus bottles?
What is the capacity of the above meant compressor?
Can this compressor be run of the emergency generator?
14.6.10 Are there dedicated working hoses available for cleaning pits etc..

Emergency Generator Set


Check general state of the EGS. Check its maintenance and test
records.
Check the documentation/drawings to establish what equipment is
powered by the EGS. Check this against reality.
Is any equipment added to the EG switchboard? How has this
influenced the total power requirement versus maximum output of
EGS?
Check the state suitability of the starting mechanism (electric: dedicated
battery pack; air: dedicated air receiver with NRV) of the EGS.
Test-run the EGS, based on a blackout simulation to check auto-start
mechanism, fuel supply etc. Test manual start alternative.
Check during the day and during the night for light coverage.
Generator must automatically start and come into operation within 45
seconds. MODU Code 5.3.3.3. Run as much EG-powered equipment
as practically possible for 2 hrs, to check for reliability, overheating,
proper functioning of all equipment on alternative supply.
Is the fuel for the EGS changed regularly? Is the tank kept full at all
times?
Cooling System:
- Is the cooling system filled with corrosion inhibitor?
- Is the system full?
- Visually inspect the state of the cooling system hoses.
- Can cooling air freely get to the radiator?
- Is the cooling fan (and other rotating equipment) properly guarded?

Emergency Shutdown
Function test Engine-room emergency shut-down from all stations.
Function test Fuel Shut-off shut-down from all stations.
Function test Air Conditioning emergency shut-downs/dampers.
Function test Ventilation emergency shut-downs/dampers.

13 updated: 04/11/20
Rig Inspection Checklist
Other Safety Related Aspects
14.10.1 Is Personal Protective Equipment (PPE) adequate and available, in
specific:
-ear plugs
-safety glasses/goggles
-gloves & aprons
-hard-hats
-fire-retardant cotton (w/o artificial fibers) coveralls
-dust masks
14.10.2 Are well equipped/maintained eye-wash stations located at critical
locations (e.g. rig-floor, hopper-area, pump-room, pit-room)
14.10.3 Are warning signs displayed at the relevant area's (e.g. hard-hat, no
smoking, radiation/explosive risk, ear protection, H2S)
14.10.4 Is other safety equipment (e.g. red/white chain, signs) readily available
for use by the crews?
14.10.5 On oxygen and acetylene set:
-bottles clearly marked
-bottles stored separately in a shaded, well vented area?
-all caps fitted
-pressure regulators calibrated
-hoses in good condition (no dry-cracks, damage)
14.10.6 Are all hand-held detection instruments available, calibrated, in good
working order? E.g. H2s, combustible gas, radiation
14.10.7 Are all required electrical earthings installed/tested/certified?

Fire-fighting Equipment (foam)


Check certification of the FF equipment
Check the records of the foam ('sell-by' date) and foaming unit.
Test run the foam equipment (produce foam).

Accommodation Block
Radio
Is a satellite phone operational? Is extra line available
Are sufficient hand-held radio's available for crane/deck, drillfloor etc?
Is extra intercom with cement unit and MWD available.

Messroom(s) and Galley(s)


Check the general standard of maintenance in relation to hygiene and
efficiency.
Is all galley equipment safe, hygienic and in good working order?
Are display areas clean?
Check the catering company's hygienic standards and (random) check
against those.
Remove extractor-fan filters and check for grease-free.
No water sprinklers fitted directly over the hobs.
Drinking quality water checked, date?

Food Storage
Are all freezer rooms at least -18 degree. C or less?
Are all cold storage rooms ate least -6 degree. C or less?
Are dry/cold/freezer storage rooms clean well organized and without
products beyond "use-by" date?
Are cold and freezer stores equipped with "to hot" and "door open"
alarms?
Can doors of cold and freezer rooms be opened from the inside?
14 updated: 04/11/20
Rig Inspection Checklist
Is there a provision to 'plug in' the reefer containers to keep them cold?

Sleeping quarters
Is the noise in this part of the accommodation acceptable.
Are all showers/toilets clean and operational, ventilation working?
Is all bedding clean and adequate (especially mattresses)?
Is ventilation adequate and are filters cleaned regularly?
Layout and cleanliness of accommodation. Fire protection and safety
equipment in accommodation, galley and stores.

Recreation area's
Are rooms large enough to accommodate off-duty staff?
Is TV/video equipment in good working order? Is a variety of videotapes
available? Are the tape changed regularly?
Are dedicated praying rooms available?
Is there a separate games room (table-tennis etc)?
Is there a gym available? What equipment does it provide? Does the
equipment have instructions for proper use displayed, as to avoid
injury?

Office area's
Are offices equipped with the necessary equipment (desk, chair,
cabinets, telephone, and view on rigfloor)?
Are offices/cabinet lockable? Is there a dedicated contracts cabinet?
Are the electricity supplies (wall sockets) sufficient and correctly
positioned? Correct voltage? Plug type?
Is the lighting adequate?
Is the TP office equipped with an operational remote BOP panel?

Changing rooms
Are changing rooms fit for purpose?
Does everyone have a dedicated locker available?
Are rooms well ventilated?

Laundry
Laundry areas are often the source of accommodation fires.
Proper regular maintenance on equipment in the laundry is
therefore essential.
16.10.1 Are washing machines sufficient in number and efficiency?
16.10.2 Are dryers sufficient in number and efficiency? Are the filters regularly
cleaned & this included in the maintenance list?
16.10.3 Check maintenance records of laundry equipment.
16.10.4 Is fire extinguisher available?

Sick bay / Hospital


16.11.1 Procedures, equipment and sickbay layout, as well as medivac
procedures will be evaluated.

Accommodation General
16.12.1 General state of maintenance, wear, tear, paint
16.12.2 No traces of undesirable inhabitants (mice, cockroaches)
16.12.3 Cleanliness
16.12.4 Lighting
16.12.5 Air-conditioning
16.12.6 Markings for orientation
15 updated: 04/11/20
Rig Inspection Checklist
16.12.7 Markings for emergency escape
Third Party Equipment
Check that lifting tackle is certified/colour-coded.
Check that zonal classification/certification is congruent with intended
use (e.g. zone 2 for casing tong power pack)
Check that alarms function properly (e.g. low-pressure alarm of
pressurized MWD cabin)
Check that all alarms/safety provisions are fitted (e.g. diesel engine
monitoring system of logging unit).
Ensure safety equipment is fitted (e.g. fire extinguishers, eye-wash
stations) and/or unit hooked into the rigs alarm system.
Ensure essential communication is established (e.g. telephone, hand-
held radio's)
Drilling Tools
See contract for detailed list of drilling tools and inspection
requirements.
Check dimensions of tubulars
Check length of HWDP and ensure they are long enough for racking
Check inspection records for all drilling tools.
Check general appearance of slips and perform paper test with 5” slips.
For power slips:
Check if there are quick disconnects
Check if foot pedal is protected
Check that engaging/disengaging time is acceptable.
Rig up for 9 5/8” casing and check equipment. Check casing tongue
torque gauge against load cell. See preparation checklist. Attend PJSM
Run power tong through all its functions unloaded.
P/U DP & DC’s, check out mousehole/competency crew’s. Can crew
identify sizes for slips and elevators and lifting nubbins. Are procedures
available and followed.
Mud bucket integrity, hang of move TDS, check hose and 3 ½-5”
spares.
Check for proper storage.
Check pipe spinner, check for spare one.
Check for sufficient handtools on rigfloor and proper storage.
Check Totco barrel, check for crew competency on usage. Perform
testrun.
Check sublist
Check fishing inventory against tubulars in contract
Check availability of lifting nubbins and inspected.
Check the condition of lifting subs for drill collars.
Check MPI reports of elevators and links

Stores
For critical equipment spot check sufficient spares available. Check
min/max levels.
Check ordering system
DP wiper rubber
BOP spares
Accumulator bladders
Drawwork brake bands, quick release
Elmagco, control handle
Kelly hose
TDS valves
MP module
MP spares
16 updated: 04/11/20
Rig Inspection Checklist
Company store and handling of company equipment as per contract.

Documentation
Check drilling operation manual.
To be available in office and on drill floor.
Check wellcontrol manual.
To be available in office and on drill floor.
Check pipetally/BHA administration
Check PMS system critical equipment
Evaluation of permit to work system with lock out and tag out.

Personnel
POB training records to be checked against Training matrix.
Check personnel against organogram
Is redundancy build in, which roustabouts are competent to work on
rigfloor and which roughneck is competent to replace derrickman etc..
Does forklift driver have plant license
Does crane operator have certificates and experience on landrigs.
Do AD’s and Drillers have IWCF English version.
Are there certified and assigned gastesters.
Is there a proper induction for new personnel.
How is GSM possession controlled on site. Is Guard aware of his
duties.