Sunteți pe pagina 1din 1

Operation Dept.

PSE SHIFT HANDOVER LOGBOOK


Doc No. KLIC-OPE-LGB02-01
Date: 07-Jan-20 Record time 16:00 - 00:00
Shift: 1 Name: Mr. Sengsouvanh
PSE-XPXN Status MW MVar PSE-XPXN Status MW MVar
Line 1 Energize De-Energize -56.88 46.42 Line 2 Energize De-Energize -56.09 46.44
PSE-UB3 Status MW MVar PSE-UB3 Status MW MVar
Line 1 Energize De-Energize 56.53 -45.88 Line 2 Energize De-Energize 56.32 -45.43
MWh MVarh MWh MVarh
Main Main
Metering PSE-XPXN 0 2965.39 PSE-UB3 6813.45 0
Line1 Line 1 MWh MVarh Line 1 kWh MVarh
Backup Backup
0 2965.64 6810.94 0
MWh MVarh MWh MVarh
Main Main
Metering PSE-XPXN 31.91 4909.9 PSE-UB3 10068.29 0
Line2 Line 2 MWh MVarh Line 2 MWh MVarh
Backup Backup
31.79 4911.78 10067.75 0
CB 80112 CB 80122 CB 80132 CB 80312
Close Open Close Open Close Open Close Open
CB 80212 CB 80222 CB 80232 FUSE 603
Close Open Close Open Close Open Close Open

Service Voltage (kV) Current (A)


KW1A TR 21.65 0.6
Event log
Record Time: Note:
16:00-00:00 Pakse Substation Energization Line No.1
16:00-00:00 Pakse Substation Energization Line No.2
16:00 Receiving and Sending information to power house
17:00 DCMS, Equipment Room Check (No problem)
21:00 DCMS, Equipment Room Check (No problem)
23:00 DCMS, Equipment Room Check (No problem)
Check: - UB3-PSE Line 1 Voltage = 239.49 kV
- UB3-PSE Line 2 Voltage = 239.54 kV
- XPXN-PSE Line 1 Voltage = 239.34 kV
- XPXN-PSE Line 2 Voltage = 239.25 kV

Sign: …………………………………..