Question 01 (MC)
The difference between time avail-to do a job and the time
MC
required to do the job , is known as
Default mark: 1
Shuffle the choices? Yes
Number the choices? A
Penalty for each incorrect try: 0
Grad
# Answers Feedback
e
A.   event 0
B.   float 100
C.   duration 0
D.   constraint 0
E.   0

Question 02(MC)

A dummy activity MC

Default mark: 1
Shuffle the choices? Yes
Number the choices? A
Penalty for each incorrect try: 0
Grad
# Answers Feedback
e
Is artificially
A.   0
introduced
Is represented by a
B.   0
dotted line
Does not consume
C.   0
time
D.   All the above 100
E.   0

1
Question 03 (MC)
THE 1ST stage of construction is MC
Default mark: 1
Shuffle the choices? Yes
Number the choices? A
Penalty for each incorrect try: 0
Grad
# Answers Feedback
e
Preparation of
A.   0
estimate
B.   Survey of the site 0
C.   Initiation of proposal 100
D.   Preparation of tender 0
E.   0

Question 04 (MC)

Critical path method MC

Default mark: 1
Shuffle the choices? Yes
Number the choices? A
Penalty for each incorrect try: 0
Grad
# Answers Feedback
e
Is an improvement
A.   0
upon bar chart method
Provides a realistic
B.   approach to daily O
problems
Avoids delays which
C.   are very common in 0
bar charts
D.   All the above 100
E.   0

2
Question 05 (MC)

Interfering float is the difference between MC

Default mark: 1
Shuffle the choices? Yes
Number the choices? A
Penalty for each incorrect try: 0
Feedbac Grad
# Answers
k e
A.   Total float and free float 100
B.   Total float and independent float 0
C.   Free float and independent float 0
D.   None of the above 0
E.   0

Question 06 (MC)

While filling the tender for any work , the contractor considers MC

Default mark: 1
Shuffle the choices? Yes
Number the choices? A
Penalty for each incorrect try: 0
Grad
# Answers Feedback
e
A.   Site survey 0
Availability of
B.   0
construction materials
C.   Availability of labor 0
D.   All the above 100
E.   0

3
Question 07 (MC)

Power stations are generally treated as MC

Default mark: 1
Shuffle the choices? Yes
Number the choices? A
Penalty for each incorrect try: 0
Grad
# Answers Feedback
e
A.   Light construction 0
B.   Heavy construction 0
C.   Industrial construction 100
D.   electrical construction 0
E.   0

Question 08 (MC)

Bar charts are suitable for MC

Default mark: 1
Shuffle the choices? Yes
Number the choices? A
Penalty for each incorrect try: 0
Grad
# Answers Feedback
e
A.   Minor works 100
B.   major works 0
C.   large works 0
D.   All the above 0
E.   0

4
Question 09 (MC)

Time corresponding to minimum total project cost is MC

Default mark: 1
Shuffle the choices? Yes
Number the choices? A
Penalty for each incorrect try: 0
Grad
# Answers Feedback
e
A.   Crash time 0
B.   Normal time 0
C.   Optimistic time 0
Between normal time
D.   100
and crash time
E.   0

Question 10 (MC)

Construction team means MC

Default mark: 1
Shuffle the choices? Yes
Number the choices? A
Penalty for each incorrect try: 0
Grad
# Answers Feedback
e
A.   An engineer 0
B.   An architect 0
C.   An owner 0
D.   All the above 100
E.   0