SAUDI ARAMCO PRE-COMMISSIONING FORM
INSTRUMENT TRANSFORMERS
Equipment Type: User Reference:
Equipment Tag No: Equipment Description:
BI/JO No: Plant No. / Location:
Ref. Drawings & Documents:
Manufacturer:
Model No: Serial No:
Test Completion Date:

FIELD INSTALLATION TESTS

VISUAL AND MECHANICAL INSPECTION

Yes No
1. Inspect for physical damage and compliance with design drawings.
2. Check mechanical clearances and proper operation of all disconnecting and grounding
devices associated with voltage transformers.
3. Verify proper operation of grounding devices for withdrawable voltage transformer
and shorting devices for current transformers.
4. Verify that the insulation of the CT's meets the voltage rating of the equipment.
5. When CT's are applied with cable terminations the grouped cable screen must extend
beyond the CT.
6. Verify that the joint connection of the three phase cables shields is brought back
though the zero-sequence CT prior to being grounded.

ELECTRICAL TESTS

Yes No
1. Current transformers shall have secondary saturation tests done and the test results
recorded.
2. Confirm transformer polarity electrically.
3. Burden tests will be made at the secondary leads of the CT to assure accurate
translation of primary current.
4. Verify connection at the secondary CT leads by driving a low current through the leads
and checking for this current at applicable devices.
5. Confirm transformer winding ratio(s).
6. Measure insulation resistance of transformer winding with five hundred volt megger
7. Measure transformer primary insulation with applicable over-potential tests see
manufacturer's instructions or refer to P-000.
8. Verify connection of secondary VT leads by applying a low voltage to the leads and
checking for this voltage at applicable devices.
9. Check for VT secondary load with secondary voltage and current measurements.
Make sure load is less than VA of the VT.

Saudi Aramco: PDD Inspection Operation/Maintenance Contractor


Company General Use

Witness
Signature & Date
©Saudi Aramco 2017. All rights reserved.
Form No. P- 011 Issue Date: August 2017 Sheet 2 of 4
SAUDI ARAMCO PRE-COMMISSIONING FORM
INSTRUMENT TRANSFORMERS
Equipment Type: User Reference:
Equipment Tag No: Equipment Description:
BI/JO No: Plant No. / Location:
Ref. Drawings & Documents:
Manufacturer:
Model No: Serial No:
Test Completion Date:

CURRENT TRANSFORMER TEST DATA

PLANT
SUBSTATION
CIRCUIT
B.I. NO.

MAGNETIZATION CURVE

CT 1 CT-2 CT 3 CT 4 CT 5 CT 6 CT 7 CT 8 CT 9 CT 10 CT 11 CT 12
VOLTS milliA milliA milliA milliA milliA milliA milliA milliA milliA milliA milliA milliA

RATIO TEST (CURRENT)

CT 1 CT 2 CT 3 CT 4 CT 5 CT 6 CT 7 CT 8 CT 9 CT 10 CT 11 CT 12
Primary
Amps
Secondary
Amps
Ratio

Saudi Aramco: PDD Inspection Operation/Maintenance Contractor


Company General Use

Witness
Signature & Date
©Saudi Aramco 2017. All rights reserved.
Form No. P- 011 Issue Date: August 2017 Sheet 3 of 4
SAUDI ARAMCO PRE-COMMISSIONING FORM
INSTRUMENT TRANSFORMERS
Equipment Type: User Reference:
Equipment Tag No: Equipment Description:
BI/JO No: Plant No. / Location:
Ref. Drawings & Documents:
Manufacturer:
Model No: Serial No:
Test Completion Date:

DATA PAGE 2

CT 1 CT 2 CT 3 CT 4 CT 5 CT 6 CT 7 CT 8 CT 9 CT 10 CT 11 CT 12
CT
Burden
Voltage
Across CT
Insulation
Resistance

POLARITY IDENTIFICATION MARKS

CIRCUIT BREAKER

STARTER OR

TRANSFORMER

Saudi Aramco: PDD Inspection Operation/Maintenance Contractor


Company General Use

Witness
Signature & Date
©Saudi Aramco 2017. All rights reserved.
Form No. P- 011 Issue Date: August 2017 Sheet 4 of 4
SAUDI ARAMCO PRE-COMMISSIONING FORM
INSTRUMENT TRANSFORMERS
Equipment Type: User Reference:
Equipment Tag No: Equipment Description:
BI/JO No: Plant No. / Location:
Ref. Drawings & Documents:
Manufacturer:
Model No: Serial No:
Test Completion Date:

Voltage Transformer Test Data

Manufacturer
Serial No.
Voltage Rating
Rating (VA)
Connection
Polarity Additive  Subtractive 

Insulation Resistance Test

Temperature ( deg. C)
Megger voltage: 500/100/2500/5000

Connection megohms measured temperature corrected


High voltage to low voltage and ground
Low voltage to high voltage and ground
High and low voltage to ground

WINDING RESISTANCE TEST SINGLE PHASE VT

H1 to H2 ohms X1 to X2 ohms
H3 to H4 ohms X3 to X4 ohms

Saudi Aramco: PDD Inspection Operation/Maintenance Contractor


Company General Use

Witness
Signature & Date
©Saudi Aramco 2017. All rights reserved.