1. Inspect for physical damage and compliance with design drawings.
2. Check mechanical clearances and proper operation of all disconnecting and grounding
devices associated with voltage transformers.
3. Verify proper operation of grounding devices for withdrawable voltage transformer
and shorting devices for current transformers.
4. Verify that the insulation of the CT's meets the voltage rating of the equipment.
5. When CT's are applied with cable terminations the grouped cable screen must extend
beyond the CT.
6. Verify that the joint connection of the three phase cables shields is brought back
though the zero-sequence CT prior to being grounded.
ELECTRICAL TESTS
Yes No
1. Current transformers shall have secondary saturation tests done and the test results
recorded.
2. Confirm transformer polarity electrically.
3. Burden tests will be made at the secondary leads of the CT to assure accurate
translation of primary current.
4. Verify connection at the secondary CT leads by driving a low current through the leads
and checking for this current at applicable devices.
5. Confirm transformer winding ratio(s).
6. Measure insulation resistance of transformer winding with five hundred volt megger
7. Measure transformer primary insulation with applicable over-potential tests see
manufacturer's instructions or refer to P-000.
8. Verify connection of secondary VT leads by applying a low voltage to the leads and
checking for this voltage at applicable devices.
9. Check for VT secondary load with secondary voltage and current measurements.
Make sure load is less than VA of the VT.
Witness
Signature & Date
©Saudi Aramco 2017. All rights reserved.
Form No. P- 011 Issue Date: August 2017 Sheet 2 of 4
SAUDI ARAMCO PRE-COMMISSIONING FORM
INSTRUMENT TRANSFORMERS
Equipment Type: User Reference:
Equipment Tag No: Equipment Description:
BI/JO No: Plant No. / Location:
Ref. Drawings & Documents:
Manufacturer:
Model No: Serial No:
Test Completion Date:
PLANT
SUBSTATION
CIRCUIT
B.I. NO.
MAGNETIZATION CURVE
CT 1 CT-2 CT 3 CT 4 CT 5 CT 6 CT 7 CT 8 CT 9 CT 10 CT 11 CT 12
VOLTS milliA milliA milliA milliA milliA milliA milliA milliA milliA milliA milliA milliA
CT 1 CT 2 CT 3 CT 4 CT 5 CT 6 CT 7 CT 8 CT 9 CT 10 CT 11 CT 12
Primary
Amps
Secondary
Amps
Ratio
Witness
Signature & Date
©Saudi Aramco 2017. All rights reserved.
Form No. P- 011 Issue Date: August 2017 Sheet 3 of 4
SAUDI ARAMCO PRE-COMMISSIONING FORM
INSTRUMENT TRANSFORMERS
Equipment Type: User Reference:
Equipment Tag No: Equipment Description:
BI/JO No: Plant No. / Location:
Ref. Drawings & Documents:
Manufacturer:
Model No: Serial No:
Test Completion Date:
DATA PAGE 2
CT 1 CT 2 CT 3 CT 4 CT 5 CT 6 CT 7 CT 8 CT 9 CT 10 CT 11 CT 12
CT
Burden
Voltage
Across CT
Insulation
Resistance
CIRCUIT BREAKER
STARTER OR
TRANSFORMER
Witness
Signature & Date
©Saudi Aramco 2017. All rights reserved.
Form No. P- 011 Issue Date: August 2017 Sheet 4 of 4
SAUDI ARAMCO PRE-COMMISSIONING FORM
INSTRUMENT TRANSFORMERS
Equipment Type: User Reference:
Equipment Tag No: Equipment Description:
BI/JO No: Plant No. / Location:
Ref. Drawings & Documents:
Manufacturer:
Model No: Serial No:
Test Completion Date:
Manufacturer
Serial No.
Voltage Rating
Rating (VA)
Connection
Polarity Additive Subtractive
Temperature ( deg. C)
Megger voltage: 500/100/2500/5000
H1 to H2 ohms X1 to X2 ohms
H3 to H4 ohms X3 to X4 ohms
Witness
Signature & Date
©Saudi Aramco 2017. All rights reserved.