Sunteți pe pagina 1din 1

BLOCK 1

SOLAR SYSTEM SOLAR WATER


HEATER RIDGE LVL.

SLAB LVL.
9.50

FIRST FLOOR

GROUND FLOOR
0.45

FRONT ELEVATION

C.G.I.SHEET ROOFING
OVER STEEL TRUSS RIDGE LVL.
2.50

SLAB LVL.
3.50
9.50

BUFFEY
COUNTER FEMALE TOILET URINALS WAITING AREA PANTRY BUFFEY COUNTER FIRST FLOOR
3.50

3.50

CHANGE TOILET MANAGER


STAFF ROOM TOILET(F) (DISABLED) TOILET(M) WASHING AREA GROUND FLOOR
TOILET ROOM WAITING AREA BACK OFFICE OFFICE

SECTION AT AA'

RIDGE LVL. RIDGE LVL.


3.40

MUMTY SLAB LVL. SLAB LVL.


3.50

R=0.15
9.50

T=0.25
W=1.28M

BUFFEY COUNTER FIRST FLOOR FIRST FLOOR


7.00
3.50

R=0.15
T=0.25
W=1.28M

STAFF ROOM GROUND FLOOR GROUND FLOOR


0.45

SIDE ELEVATION
SECTION AT BB'
3.00

PROPOSED "HOTEL" BELONGING TO M/S FRISKY TOURISM INDIA PVT.


LTD.THROUGH DIRECTOR SH. MANJEET SINGH S/O SH. SATNAM SINGH
SCHEDULE OF JOINERY: DRAWN BY.: OFFICE :- 01792-229625
94180-29625
ON KH. NO 562/505/115 , 631/116, 632/116, 117, 648/118 & 650/119 AT 98169-07282
MAUJA SANAWAR TEHSIL KASAULI & DISTT. SOLAN (H.P.) · ARCHITECTS E-MAIL:- mosaic.arch.engg@gmail.com
S.No. NAME SIZE LINTEL LVL. CILL LVL. ·
·
ENGINEERS
PLANNERS
TITLE :ELEVATIONS & SECTIONS (BLOCK 1) 1. D 1.06X2.55 2.55 0.00
CHECKED BY.:
·
·
VALUERS
ESTIMATORS
· SURVEYORS
AREA STATEMENT:
MOSAIC
2. D1 0.75X2.10 2.10 0.00 · LIASIONING ARCHITECTS & ENGINEERS
· HOME LOANS
TOTAL PLOT AREA =6171.32 SQM. (08-04BIGHA)
3. D1/V 0.75X2.55 2.55 0.00 ADDRESS:- RAJIV SADAN,RAJGARH ROAD,NEAR B.L CENTRAL
F.A.R.=1.75X6171.32 =10799.81SQ.MT. 4. W 1.80X1.65 2.55 0.90 PUBLIC SCHOOL SHAMTI,SOLAN (H.P)

BLOCK (1) 5. V 0.90X0.90 2.55 1.65


GROUND FLOOR PLAN =582.65SQ.M.
FIRST FLOOR PLAN
SECOND/ATTIC
=582.65SQ.M.
=276.94SQ.MT.
BRIEF SPECIFICATIONS:
·
TOTAL =1442.24SQ.MT. ·
·
·
·
·
·
·
·
· OWNER'S SIGN.:
INDEX:- 1:100
* BOUNDARY (ALL DIMENSIONS ARE IN MTR.)
* PROPOSED
* EXISTING
* ROAD / PATH
* S.T & S.P
* R.W.H.T. PREPARED BY: STAMP OF AUTHORITY

S-ar putea să vă placă și