Sunteți pe pagina 1din 19

Unit No. 8 Annual Overhaul Bar Chart (Aug. -Sep.

2019)
3 X 660 MW KTPS KORADI

25-Aug-19

26-Aug-19

27-Aug-19

28-Aug-19

29-Aug-19

30-Aug-19

31-Aug-19

10-Sep-19

11-Sep-19

12-Sep-19

13-Sep-19

14-Sep-19

15-Sep-19

16-Sep-19

17-Sep-19

18-Sep-19

19-Sep-19

20-Sep-19

21-Sep-19

22-Sep-19

23-Sep-19
1-Sep-19

2-Sep-19

3-Sep-19

4-Sep-19

5-Sep-19

6-Sep-19

7-Sep-19

8-Sep-19

9-Sep-19
DATE

Start Day

End Day
SR ACTIVITY
NO

DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
BM
1 FURNACE COOLING 1 2

2 EXTERNAL CLEANING OF BOILER STRUCTURE 1 3

FURNACE PRESSURIZATION TEST & PRE-CAVT 3 3

CUPLOCK SCAFFLOADING & FIRST PASS JETTING 5 9

WATER WASHING AT TRANSITION AND SECOND PASS 4 7

CAVT CORRECTIONS 4 17

POST CAVT 34 34

TUBE THICKNESS SURVEY IN FIRST PASS 10 16

TUBE THICKNESS SURVEY IN SECOND PASS 8 15

CORROSION MAPPING OF W/W TUBES BY RFET 12 16

INSPECTION OF BUCKLED WATER WALL PANELS BY MHI 10 16

HP WELDING AT FIRST PASS & WW PANELS 11 27

HP WELDING & TUBE REPAIRS AT SECOND PASS 9 25

COAL COMPARTMENT ASSEMBLY REPLACEMENT 5 29

BURNER TILT & BURNER SERVICING 10 29


RAPH 8A/ 8B DOOR OPENING & BEAM FITTING 4 5
RAPH 8A/ 8B HEATING ELEMENT REPLACEMENT 6 31
RAPH 8A/ 8B SEAL & CASING WORK & TRIAL 6 33

BCW PUMP REPLACEMENT 4 21

VALVE SERVICING 4 28

DEPARTMENTAL & STATUTORY HYDRAULIC TEST 29 31

REMOVAL OF CUPLOCK 31 33
GAS DUCT CLEANING 4 30
SERVICING OF GATES & DAMPERS 4 20
DAMPERS TRIALS & RECTIFICATION 18 30

SERVICING OF ID, FD & PA FANS 4 30

FD & PA FAN DAMPER SEAL REPLACEMENT 4 30

REPLACEMENT OF COAL PIPES & BENDS 4 30

VARIOUS WORK OF COAL MILL & COAL FEEDER 4 30

SHIFTING OF HYDRAULIC TANK OF COAL MILL 4 30

BOILER LIGHT-UP 35 35

TM
Cooling Down of TG Rotor/Casing 1 7
Unit No. 8 Annual Overhaul Bar Chart (Aug. -Sep. 2019)
3 X 660 MW KTPS KORADI

25-Aug-19

26-Aug-19

27-Aug-19

28-Aug-19

29-Aug-19

30-Aug-19

31-Aug-19

10-Sep-19

11-Sep-19

12-Sep-19

13-Sep-19

14-Sep-19

15-Sep-19

16-Sep-19

17-Sep-19

18-Sep-19

19-Sep-19

20-Sep-19

21-Sep-19

22-Sep-19

23-Sep-19
1-Sep-19

2-Sep-19

3-Sep-19

4-Sep-19

5-Sep-19

6-Sep-19

7-Sep-19

8-Sep-19

9-Sep-19
DATE

Start Day

End Day
SR ACTIVITY
NO

DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
H2 Purging/ Air Filling 8 9

All Turbine bearing & MSV, RSV & all control valve inspection and servicing & boxup 10 30
activity
TG MOT oil filtration 1 29

EH oil filtration 6 28

All TG bearings & TG valve boxup 24 30

Oil flushing & air leak test 27 30

Restoration of TG Barring Gear 28 30

H2 Filling 29 31

High Pressure Drain Valve Replacement (MS/HRH/CRH/HPBypass and others towards 4 28


AFT & TFT)

DMCW TG/SG pumps servicing & PHE cleaning 3 28

Deaerator internal inspection & HPH dump line replacement work 4 28

Condenser tube cleaning by bullet & High pressure hydro jetting and Condenser fill & 5 29
leak test

HP & LP shell condensor Vaccum pump Servicing 3 25

TDBFP governing system valves/oil pumps and associated system components 3 30


servicing

TDBFP lub oil & control oil filter relocation & additional installation of MOT vap[our 3 27
extraction fans

NDCT pond basin cleaning & replacement of PVC fills, nozzles, end caps & repairing of 5 30
distribution pipes etc.

CW pump B bearing inspection, seal inspection, cooling coil cleaning, strainer cleaning 4 30
etc.

All CEP maint. & civil foundation strengthning Work 2 25

CEP 8A complete bowl assembly & mech. Seal replacement 1 20

ACW Pump O/H, strainer cleaning and associated works 5 30

Misc works 1 30

AHP
ESP FIRST ROW WORK 4 28

INSTALLATION OF NORMAL REFRACTORY 6 28

KNIFE GATE VALVE SERVICING 15 28

REPLACEMENT OF ESP HOPPER FLUIDIZING PADS 6 28

RESTORATION OF ESP INTERNALS 6 28

ESP FIELD MEGERING & TEST CHARGING 27 30


Unit No. 8 Annual Overhaul Bar Chart (Aug. -Sep. 2019)
3 X 660 MW KTPS KORADI

25-Aug-19

26-Aug-19

27-Aug-19

28-Aug-19

29-Aug-19

30-Aug-19

31-Aug-19

10-Sep-19

11-Sep-19

12-Sep-19

13-Sep-19

14-Sep-19

15-Sep-19

16-Sep-19

17-Sep-19

18-Sep-19

19-Sep-19

20-Sep-19

21-Sep-19

22-Sep-19

23-Sep-19
1-Sep-19

2-Sep-19

3-Sep-19

4-Sep-19

5-Sep-19

6-Sep-19

7-Sep-19

8-Sep-19

9-Sep-19
DATE

Start Day

End Day
SR ACTIVITY
NO

DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

COARSE ASH SYSTEM- HOPPERS,JET PUMP, FEEDER EJECTORS CHECKING 6 28

CLINKER GRINDER WORK 5 28

SEAL TROUGH WORK 6 28

FEED GATE INSPECTION AND SERVICING 6 28

EMT
PM of GENERATOR-- slip ring cleaning, vbrushes replacement, filter cleaning, excitor 5 15
connection tighteness, rotor earth brush checking,
GRP, GTRP, STRP, UTRP ,GCP,GAP and AVR 6 21

Generator X'mer, UAT X'mer, Excitation X'mer & Station X'mer-1 2 24

All Dry Type LT X'mer (UST-1,UST-2,UST-3,UST-4,SST-1,SST-2,EST1 to 12) 6 17

HT Motor Preventive Maintainance of HT Motors. 3 24

LT Motor Preventive Maintainance of LT Motors. 4 25

HT Switch Gear HT Board Cleaning, Bus Duct Tightning x Bkr. Servicing & 3 24
Testing,Protection Relay Testing of I/C's

All LT Switch Gear Cleaning of all Boards by presurised air & P. M. of LT Breakers & 2 23
feeders.

Bus Duct Inspection & Cleaning : Scaffolding, opening of inspection doors, insulator 1 21
cleaning, connection tightness & bus duct cleaning

Soot Blower Preventive maintenance of all soot blowers 7 24

ESP Work 5 25

Batteries Curative charging & discharging of 24 volt 220 volt & 400 V ups Battery 4 20
Charger 24V & 220V Preventive maintainence.

MOV Preventive Maintainance of MOV and trials. 6 25

Lighting, Welding supply and support to other section, if required 1 25

C&I
Turbovisory work of Main Turbine 6 19

Main turbine control valves characteristics 22 23

Turbovisory work of TDBFP A&B 2 17

DCS system 10 18

All turbine and boiler side instruments 1 27

SADC power cylinder & positioner 1 27

BMS instruments 6 21

Coal mill instruments 1 27

Pneumatic valves on Boiler and Turbine side 1 27


Unit No. 8 Annual Overhaul Bar Chart (Aug. -Sep. 2019)
3 X 660 MW KTPS KORADI

25-Aug-19

26-Aug-19

27-Aug-19

28-Aug-19

29-Aug-19

30-Aug-19

31-Aug-19

10-Sep-19

11-Sep-19

12-Sep-19

13-Sep-19

14-Sep-19

15-Sep-19

16-Sep-19

17-Sep-19

18-Sep-19

19-Sep-19

20-Sep-19

21-Sep-19

22-Sep-19

23-Sep-19
1-Sep-19

2-Sep-19

3-Sep-19

4-Sep-19

5-Sep-19

6-Sep-19

7-Sep-19

8-Sep-19

9-Sep-19
DATE

Start Day

End Day
SR ACTIVITY
NO

DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Local Control panel and all JB 1 27

Boiler & its auxiliary protection trials 27 28

Turbine and its auxiliaries protection trials 27 28

Ash Handling plant Instruments 1 27

Misc and Other section work 1 27

SYNCHRONIZING 35 35

EX. ENGINEER ( TM) EX. ENGINEER (BM) EX. ENGINEER (EM) EX. ENGINEER (AHP) EX. ENGINEER (C&I)
3x660MW KORADI THERMAL POWER STATION
Unit # 10 AOH Progress Review Status
Section :ELECTRICAL MAINTENANCE
PROGRESS REVIEW STATUS, as on
S
N
OVERHAUL ACTIVITY PERMIT NUMBER
Monday, November 16, 2020

Generator and AVR:- Slip ring cleaning/checking , Brush


replacement , AVR cleaning and testing, Slipring polarity
change, Field breaker servicing and testing
EM-01
From To
Scheduled 14-Nov 3-Dec
Actual
Status NOT YET STARTED

GRP, GTRP, STRP, UTRP , ,GCP,GAP panel cleaning.


Generator protection relay testing. Generator transformer
breaker control circuit checking & cold trial
EM-02
From To
Scheduled 11-Nov 4-Dec
Actual 12-Nov
Status WIP

Generator X'mer & Station X'mer-1, Unit X'mer 1&2,UAT


1&2,SAT 3&4, Excitation X'mer: Oil Filtration, BDV / PPM
checking,Minor oil Leakage Attending, Silica Gel
Replacement, Routine Test of transformer , TAN DELTA of
bushing. Bus Duct inspection of All transformer UT-1 Before oil filtration transformer testing done.
EM-03 UT-2 Before oil filtration transformer testing done.
From To
Scheduled 10-Nov 7-Dec
Actual 10-Nov
Status WIP

All Dry Type LT X'mer (UST-1,UST-2,UST-3,UST-4,SST-1,SST-


2,EST1 to 12) Transformer Cleaning, HV / LV Connection
Checking , IR Value Checking, Temperature Scanner
Checking and Trail.
EM-04
From To
Scheduled 11-Nov 6-Dec
Actual 12-Nov
Status WIP

HT Motor: - Preventive Maintainance and overhaul of HT


Motors.

EM-05 From To 1. CEP 10B O/H work in progress.


Scheduled 11-Nov 5-Dec
Actual 9-Nov
Status WIP
LT Motor :- Preventive Maintainance and overhaul of
critical LT Motors.
From To GSC vapour extraction fan 1 & 2 motor overhaul work in
EM-06 progress.
Scheduled 9-Nov 4-Dec
Actual 10-Nov
Status WIP
HT Switch Gear:- HT Board Cleaning, Bus bar Tightning ,
Breaker Servicing & Testing,Protection Relay Testing of all
feeders
Unit switchgear 1 board cleaning and breaker servicing is
EM-07 From To progress.
Scheduled 12-Nov 5-Dec Unit switchgear 1 relay testing work is progress.
Actual
Status NOT YET STARTED
PROGRESS REVIEW STATUS, as on
S
N
OVERHAUL ACTIVITY PERMIT NUMBER
All LT Switch Gear:- LT Board Cleaning, Bus bar Tightning ,
Breaker Servicing & Testing,Protection Relay Testing of all
feeders
Compressor air MCC LHS board preventive maint. Work in
EM-08 From To progress.
Scheduled 10-Nov 6-Dec
Actual 10-Nov
Status WIP
Soot Blower :- Preventive maintenance of all soot blower
motors and feeders
From To
EM-09
Scheduled 12-Nov 6-Dec
Actual 12-Nov
Status WIP

ESP:- ESP Field Rectiformer LV & HV connection checking,


oil leakage attending, Silica Replacement, FRP Rod
Cleaning Checking & Replacement if Required. Rappers
Healthyness Checking, Open Circuit Test IR Value Checking.
EM-10 ESP B pass inspection work in completed.
From To
Scheduled 12-Nov 7-Dec
Actual 11-Nov
Status WIP
Batteries:-Curative discharge of 220V, 24V and UPS
batteries
From To
EM-11
Scheduled 12-Nov 2-Dec
Actual
Status NOT YET STARTED
MOV : Preventive Maintainance of MOV Modifications and
trials.
From To PSH DESH spray water & SEC. SH DESH by pass inlet MOV
EM-12
Scheduled 10-Nov 6-Dec (402 & 414) control box installation work in progress.
Actual 10-Nov
Status WIP

Lighting, Welding supply and support to other section, if


required

EM-13 From To
Scheduled 9-Nov 8-Dec
Actual 9-Nov
Status WIP

TODAY Start
WIP
PROGRESS REVIEW STATUS, as on
S
N NOT YET STARTED OVERHAUL ACTIVITY PERMIT NUMBER
TODAY Completed
COMPLETED
WITHHOLD
Select
PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on
Work Completed
(%) Thursday, November 12, 2020 Wednesday, November 11, 2020

Station PMCC3 Relay testng

Field breaker Rack out ,Excitation Bus duct


inspection work started.

UST-3 Testing done

CEP 10B O/H WORK IN PROGRESS.ACW Pump 1.CEP 10B overhaul work is in progress .2.CW
10B removed for TM work. Pump A motor removed for TM .

TDBFP Barring Gear Motor O/h in


progress.MOT Vapour extraction fan
removed.
PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on
Work Completed
(%)

Unit PCC2 Board Cleaning ,inspection & PM


work .

ESP field inspection work in Progress.

ESP field inspection work in Progress.

WDC A&B ,Boiler side spray valve MOV


modification work

ESP side additional welding supply


arrangement. Blr JET machine supply
arrangement.Additional Submersible Pump
supply arrangement work.
PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on

Tuesday, November 10, 2020 Monday, November 09, 2020

Permit 57656,57657 applied for UT1 ,UT2 ,


Bus duct cleaning and external painting.

CEP 10B Motors removed in unloading bay


overhaul work is in progress . CEP 10B Motor removed in unloading bay .

Coal Mill A LP Pump,HP Pump,Hydraulic Pump


motors Overhaul work.
PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on

Station PMCC3 Board cleaning and Preventive


maintenance

Permit
no.57640,57641,57643,57645,57647,57648
ESP A,B,C,D,E,F inspection

WDC A &B Valve Mov box modification .

Cable drums ,additional SFU supply panels


,for supply arrangements being transferred Additional Welding Supply and Lighting supply
arrangement for TM,BM,AHP done
from Major store to site
3x660MW KORADI THERMAL POWER STATION
Unit # 10 AOH Progress Review Status
Section :ELECTRICAL MAINTENANCE
PROGRESS REVIEW STATUS, as on
S
N
OVERHAUL ACTIVITY PERMIT NUMBER
Tuesday, November 17, 2020

Generator and AVR:- Slip ring cleaning/checking , Brush


replacement , AVR cleaning and testing, Slipring polarity
change, Field breaker servicing and testing
EM-01
From To
Scheduled 14-Nov 3-Dec
Actual
Status NOT YET STARTED

GRP, GTRP, STRP, UTRP , ,GCP,GAP panel cleaning.


Generator protection relay testing. Generator transformer
breaker control circuit checking & cold trial
EM-02 GRP relay testing work in progress.
From To
Scheduled 11-Nov 4-Dec
Actual 12-Nov
Status WIP

Generator X'mer & Station X'mer-1, Unit X'mer 1&2,UAT


1&2,SAT 3&4, Excitation X'mer: Oil Filtration, BDV / PPM
checking,Minor oil Leakage Attending, Silica Gel
Replacement, Routine Test of transformer , TAN DELTA of
bushing. Bus Duct inspection of All transformer
EM-03 Excitation transformer before oil filtration testing done.
Excitation transformer LV bus duct inspection is in progress.
From To
Scheduled 10-Nov 7-Dec
Actual 10-Nov
Status WIP

All Dry Type LT X'mer (UST-1,UST-2,UST-3,UST-4,SST-1,SST-


2,EST1 to 12) Transformer Cleaning, HV / LV Connection
Checking , IR Value Checking, Temperature Scanner
Checking and Trail.
EM-04
From To
Scheduled 11-Nov 6-Dec
Actual 12-Nov
Status WIP

HT Motor: - Preventive Maintainance and overhaul of HT


Motors.

EM-05 From To 1. CEP 10B O/H work in progress.


Scheduled 11-Nov 5-Dec
Actual 9-Nov
Status WIP
LT Motor :- Preventive Maintainance and overhaul of
critical LT Motors.
From To GSC vapour extraction fan 1 & 2 motor overhaul work in
EM-06 progress.
Scheduled 9-Nov 4-Dec Coal mill lub oil motor overhaul work in progress.
Actual 10-Nov
Status WIP
HT Switch Gear:- HT Board Cleaning, Bus bar Tightning ,
Breaker Servicing & Testing,Protection Relay Testing of all
feeders
Unit switchgear 1 board cleaning and breaker servicing is
EM-07 From To progress.
Scheduled 12-Nov 5-Dec Unit switchgear 1 relay testing work is progress.
Actual
Status NOT YET STARTED
PROGRESS REVIEW STATUS, as on
S
N
OVERHAUL ACTIVITY PERMIT NUMBER
All LT Switch Gear:- LT Board Cleaning, Bus bar Tightning ,
Breaker Servicing & Testing,Protection Relay Testing of all
feeders
Compressor air MCC LHS board preventive maint. Work in
EM-08 From To progress.
Scheduled 10-Nov 6-Dec
Actual 10-Nov
Status WIP
Soot Blower :- Preventive maintenance of all soot blower
motors and feeders
From To
EM-09
Scheduled 12-Nov 6-Dec
Actual 12-Nov
Status WIP

ESP:- ESP Field Rectiformer LV & HV connection checking,


oil leakage attending, Silica Replacement, FRP Rod
Cleaning Checking & Replacement if Required. Rappers
Healthyness Checking, Open Circuit Test IR Value Checking.
EM-10 ESP B pass inspection work in completed.
From To
Scheduled 12-Nov 7-Dec
Actual 11-Nov
Status WIP
Batteries:-Curative discharge of 220V, 24V and UPS
batteries
From To
EM-11
Scheduled 12-Nov 2-Dec
Actual
Status NOT YET STARTED
MOV : Preventive Maintainance of MOV Modifications and
trials.
From To PSH DESH spray water & SEC. SH DESH by pass inlet MOV
EM-12
Scheduled 10-Nov 6-Dec (402 & 414) control box installation work in progress.
Actual 10-Nov
Status WIP

Lighting, Welding supply and support to other section, if


required

EM-13 From To
Scheduled 9-Nov 8-Dec
Actual 9-Nov
Status WIP

TODAY Start
WIP
PROGRESS REVIEW STATUS, as on
S
N NOT YET STARTED OVERHAUL ACTIVITY PERMIT NUMBER
TODAY Completed
COMPLETED
WITHHOLD
Select
PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on
Work Completed
(%) Thursday, November 12, 2020 Wednesday, November 11, 2020

0%

0% Station PMCC3 Relay testng

Field breaker Rack out ,Excitation Bus duct


inspection work started.

UST-3 Testing done

CEP 10B O/H WORK IN PROGRESS.ACW Pump 1.CEP 10B overhaul work is in progress .2.CW
10B removed for TM work. Pump A motor removed for TM .

TDBFP Barring Gear Motor O/h in


progress.MOT Vapour extraction fan
removed.
PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on
Work Completed
(%)

Unit PCC2 Board Cleaning ,inspection & PM


work .

ESP field inspection work in Progress.

ESP field inspection work in Progress.

WDC A&B ,Boiler side spray valve MOV


modification work

ESP side additional welding supply


arrangement. Blr JET machine supply
arrangement.Additional Submersible Pump
supply arrangement work.
PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on

Tuesday, November 10, 2020 Monday, November 09, 2020

Permit 57656,57657 applied for UT1 ,UT2 ,


Bus duct cleaning and external painting.

CEP 10B Motors removed in unloading bay


overhaul work is in progress . CEP 10B Motor removed in unloading bay .

Coal Mill A LP Pump,HP Pump,Hydraulic Pump


motors Overhaul work.
PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on

Station PMCC3 Board cleaning and Preventive


maintenance

Permit
no.57640,57641,57643,57645,57647,57648
ESP A,B,C,D,E,F inspection

WDC A &B Valve Mov box modification .

Cable drums ,additional SFU supply panels


,for supply arrangements being transferred Additional Welding Supply and Lighting supply
arrangement for TM,BM,AHP done
from Major store to site
Unit No. 10 Annual Overhaul Bar Chart (NOV-2020)-MAINTENANCE
3 X 660 MW KTPS KORADI

10-Nov-20
11-Nov-20
12-Nov-20
13-Nov-20
14-Nov-20
15-Nov-20
16-Nov-20
17-Nov-20
18-Nov-20
19-Nov-20
20-Nov-20
21-Nov-20
22-Nov-20
23-Nov-20
24-Nov-20
25-Nov-20
26-Nov-20
27-Nov-20
28-Nov-20
29-Nov-20
30-Nov-20
9-Nov-20

1-Dec-20
2-Dec-20
3-Dec-20
4-Dec-20
5-Dec-20
6-Dec-20
7-Dec-20
8-Dec-20
Total days
SR DATE

Start Day

End Day
NO ACTIVITY

DAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Electrical Maintenance & Testing


1 GRP, GTRP, STRP, UTRP , ,GCP,GAP panel cleaning. Generator protection relay testing. 3 26 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

2 Generator X'mer & Station X'mer-1, Unit X'mer 1&2,UAT 1&2,SAT 3&4, Excitation X'mer 2 29 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

3 All Dry Type LT X'mer (UST-1,UST-2,UST-3,UST-4,SST-1,SST-2,EST1 to 12) 3 28 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

4 HT Motor Preventive Maintainance of HT Motors. 3 27 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

5 LT Motor Preventive Maintainance of LT Motors. 1 26 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

6 HT Switch Gear HT Board Cleaning, Bus Duct Tightning x Bkr. Servicing & Testing, Protection Relay Testing of I/C's 4 27 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

7 All LT Switch Gear Cleaning of all Boards by presurised air & PM of LT Breakers & feeders. 2 28 27 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

8 Soot Blower Preventive maintenance of all soot blowers 4 28 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

9 ESP Work 4 29 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

10 Batteries Curative charging & discharging of 24 volt 220 volt & 400 V UPS 4 24 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

11 MOV Preventive Maintainance of MOV and trials. 2 28 27 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Generator and AVR:- Slip ring cleaning/checking , Brush replacement , AVR cleaning and testing, Slipring polarity
12 change, Field breaker servicing and testing 6 25 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

13 Lighting, Welding supply and support to other section, if required 1 30 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30