3 X 660 MW KTPS KORADI
25-Aug-19
26-Aug-19
27-Aug-19
28-Aug-19
29-Aug-19
30-Aug-19
31-Aug-19
10-Sep-19
11-Sep-19
12-Sep-19
13-Sep-19
14-Sep-19
15-Sep-19
16-Sep-19
17-Sep-19
18-Sep-19
19-Sep-19
20-Sep-19
21-Sep-19
22-Sep-19
23-Sep-19
1-Sep-19
2-Sep-19
3-Sep-19
4-Sep-19
5-Sep-19
6-Sep-19
7-Sep-19
8-Sep-19
9-Sep-19
DATE
Start Day
End Day
SR ACTIVITY
NO
DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
BM
1 FURNACE COOLING 1 2
CAVT CORRECTIONS 4 17
POST CAVT 34 34
VALVE SERVICING 4 28
REMOVAL OF CUPLOCK 31 33
GAS DUCT CLEANING 4 30
SERVICING OF GATES & DAMPERS 4 20
DAMPERS TRIALS & RECTIFICATION 18 30
BOILER LIGHT-UP 35 35
TM
Cooling Down of TG Rotor/Casing 1 7
Unit No. 8 Annual Overhaul Bar Chart (Aug. -Sep. 2019)
3 X 660 MW KTPS KORADI
25-Aug-19
26-Aug-19
27-Aug-19
28-Aug-19
29-Aug-19
30-Aug-19
31-Aug-19
10-Sep-19
11-Sep-19
12-Sep-19
13-Sep-19
14-Sep-19
15-Sep-19
16-Sep-19
17-Sep-19
18-Sep-19
19-Sep-19
20-Sep-19
21-Sep-19
22-Sep-19
23-Sep-19
1-Sep-19
2-Sep-19
3-Sep-19
4-Sep-19
5-Sep-19
6-Sep-19
7-Sep-19
8-Sep-19
9-Sep-19
DATE
Start Day
End Day
SR ACTIVITY
NO
DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
H2 Purging/ Air Filling 8 9
All Turbine bearing & MSV, RSV & all control valve inspection and servicing & boxup 10 30
activity
TG MOT oil filtration 1 29
EH oil filtration 6 28
H2 Filling 29 31
Condenser tube cleaning by bullet & High pressure hydro jetting and Condenser fill & 5 29
leak test
TDBFP lub oil & control oil filter relocation & additional installation of MOT vap[our 3 27
extraction fans
NDCT pond basin cleaning & replacement of PVC fills, nozzles, end caps & repairing of 5 30
distribution pipes etc.
CW pump B bearing inspection, seal inspection, cooling coil cleaning, strainer cleaning 4 30
etc.
Misc works 1 30
AHP
ESP FIRST ROW WORK 4 28
25-Aug-19
26-Aug-19
27-Aug-19
28-Aug-19
29-Aug-19
30-Aug-19
31-Aug-19
10-Sep-19
11-Sep-19
12-Sep-19
13-Sep-19
14-Sep-19
15-Sep-19
16-Sep-19
17-Sep-19
18-Sep-19
19-Sep-19
20-Sep-19
21-Sep-19
22-Sep-19
23-Sep-19
1-Sep-19
2-Sep-19
3-Sep-19
4-Sep-19
5-Sep-19
6-Sep-19
7-Sep-19
8-Sep-19
9-Sep-19
DATE
Start Day
End Day
SR ACTIVITY
NO
DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
EMT
PM of GENERATOR-- slip ring cleaning, vbrushes replacement, filter cleaning, excitor 5 15
connection tighteness, rotor earth brush checking,
GRP, GTRP, STRP, UTRP ,GCP,GAP and AVR 6 21
HT Switch Gear HT Board Cleaning, Bus Duct Tightning x Bkr. Servicing & 3 24
Testing,Protection Relay Testing of I/C's
All LT Switch Gear Cleaning of all Boards by presurised air & P. M. of LT Breakers & 2 23
feeders.
Bus Duct Inspection & Cleaning : Scaffolding, opening of inspection doors, insulator 1 21
cleaning, connection tightness & bus duct cleaning
ESP Work 5 25
Batteries Curative charging & discharging of 24 volt 220 volt & 400 V ups Battery 4 20
Charger 24V & 220V Preventive maintainence.
C&I
Turbovisory work of Main Turbine 6 19
DCS system 10 18
BMS instruments 6 21
25-Aug-19
26-Aug-19
27-Aug-19
28-Aug-19
29-Aug-19
30-Aug-19
31-Aug-19
10-Sep-19
11-Sep-19
12-Sep-19
13-Sep-19
14-Sep-19
15-Sep-19
16-Sep-19
17-Sep-19
18-Sep-19
19-Sep-19
20-Sep-19
21-Sep-19
22-Sep-19
23-Sep-19
1-Sep-19
2-Sep-19
3-Sep-19
4-Sep-19
5-Sep-19
6-Sep-19
7-Sep-19
8-Sep-19
9-Sep-19
DATE
Start Day
End Day
SR ACTIVITY
NO
DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
SYNCHRONIZING 35 35
EX. ENGINEER ( TM) EX. ENGINEER (BM) EX. ENGINEER (EM) EX. ENGINEER (AHP) EX. ENGINEER (C&I)
3x660MW KORADI THERMAL POWER STATION
Unit # 10 AOH Progress Review Status
Section :ELECTRICAL MAINTENANCE
PROGRESS REVIEW STATUS, as on
S
N
OVERHAUL ACTIVITY PERMIT NUMBER
Monday, November 16, 2020
EM-13 From To
Scheduled 9-Nov 8-Dec
Actual 9-Nov
Status WIP
TODAY Start
WIP
PROGRESS REVIEW STATUS, as on
S
N NOT YET STARTED OVERHAUL ACTIVITY PERMIT NUMBER
TODAY Completed
COMPLETED
WITHHOLD
Select
PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on
Work Completed
(%) Thursday, November 12, 2020 Wednesday, November 11, 2020
CEP 10B O/H WORK IN PROGRESS.ACW Pump 1.CEP 10B overhaul work is in progress .2.CW
10B removed for TM work. Pump A motor removed for TM .
Permit
no.57640,57641,57643,57645,57647,57648
ESP A,B,C,D,E,F inspection
EM-13 From To
Scheduled 9-Nov 8-Dec
Actual 9-Nov
Status WIP
TODAY Start
WIP
PROGRESS REVIEW STATUS, as on
S
N NOT YET STARTED OVERHAUL ACTIVITY PERMIT NUMBER
TODAY Completed
COMPLETED
WITHHOLD
Select
PROGRESS REVIEW STATUS, as on PROGRESS REVIEW STATUS, as on
Work Completed
(%) Thursday, November 12, 2020 Wednesday, November 11, 2020
0%
CEP 10B O/H WORK IN PROGRESS.ACW Pump 1.CEP 10B overhaul work is in progress .2.CW
10B removed for TM work. Pump A motor removed for TM .
Permit
no.57640,57641,57643,57645,57647,57648
ESP A,B,C,D,E,F inspection
10-Nov-20
11-Nov-20
12-Nov-20
13-Nov-20
14-Nov-20
15-Nov-20
16-Nov-20
17-Nov-20
18-Nov-20
19-Nov-20
20-Nov-20
21-Nov-20
22-Nov-20
23-Nov-20
24-Nov-20
25-Nov-20
26-Nov-20
27-Nov-20
28-Nov-20
29-Nov-20
30-Nov-20
9-Nov-20
1-Dec-20
2-Dec-20
3-Dec-20
4-Dec-20
5-Dec-20
6-Dec-20
7-Dec-20
8-Dec-20
Total days
SR DATE
Start Day
End Day
NO ACTIVITY
DAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
2 Generator X'mer & Station X'mer-1, Unit X'mer 1&2,UAT 1&2,SAT 3&4, Excitation X'mer 2 29 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
6 HT Switch Gear HT Board Cleaning, Bus Duct Tightning x Bkr. Servicing & Testing, Protection Relay Testing of I/C's 4 27 24 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
7 All LT Switch Gear Cleaning of all Boards by presurised air & PM of LT Breakers & feeders. 2 28 27 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
9 ESP Work 4 29 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
10 Batteries Curative charging & discharging of 24 volt 220 volt & 400 V UPS 4 24 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Generator and AVR:- Slip ring cleaning/checking , Brush replacement , AVR cleaning and testing, Slipring polarity
12 change, Field breaker servicing and testing 6 25 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30