Activities Performed in ONGC – LEWPP Project

1) SQL Database Creation for the database of the project in SQL database manger
2) Database creation in database manager

3) Import Controller Package Creation for all units


After Creation of all Packages Import Controller was looking as seen in below snap
After Creating the package, when import controller was run above error code was given by
AVEVA NET Import Controller& it was solved by giving all rights in AVEVA Admin tools to this
user (LEWP_NEW)

One more Error code was regarding the Large File size as the import controller was giving
timeout error for large file size. It was resolved by changing the value maxRecivedMessageSize
in 78 line of AVEVAnetfilestoredomainhost.config file in filestore location changing its value to
10737418240
For 3D-Model import controller there was issue with regards to VIZStream path which was
resolved by by sharing and giving all rights to the folder and shorten the vizstream path in
package details.
4) Website Creation, License Resolving & Background Image Insertion.
After Package Installation below error code was given by AVEVA NET Dashboard.
Due to which we had to stop the other website from IIS server manger and re-run IIS services and
after that website license issue was resolved .

After resolving Website license issue Background Images was added as per image provided from
AVEVA Team.
5) Matcode Document uploaded and checked in dashboard, as seen in below snap.
6) DCI-MCI, PO, PS, PR loaded for various units and checked.
HDFGHDFGDFGDFGDF

DASDASDASDASDAS
SDFASDASD
7) Various Document were viewed on Random Bases (Xls, Doc etc)
8) Various Reports were integrated in Dashboard as shown below.
9) Launchers / receivers / vessels to be tagged and linked with respective datasheet details
checked in Dashboard.
10) Random QC done for various units.
11) 3D-Model Issue resolved