Implementation of Multi-Modal Integration Facilities at Bandongri Metro Station (Line – 7) and IC Colony Metro Station (Line – 2A)

BILL OF QUANTITIES (BOQ)-Bandongari


MCGM+PWD-
Sr No. Particulars Amount (Rs.) PWD
Electrical

Removal and Dismantling of existing structures(A)

A1 Clearing and grubbing of land #REF! #REF! #REF!

A2 Removing Paver Blocks #REF! #REF! #REF!

A3 Dismantling of flexible pavements #REF! #REF! #REF!

A4 Dismantling of cement concrete pavement #REF! #REF! #REF!

A5 Demolishing existing masonry, structures, #REF! #REF! #REF!

A6 Removing Existing Kerb #REF! #REF! #REF!

A6a Extra over above rate of carting for additional #REF! #REF! #REF!

A7 Transportation of excavated material /debris up to 40km #REF! #REF! #REF!

A8 Temp. Barricading #REF! #REF! #REF!

A9 Traffic warden #REF! #REF! #REF!

A10 Removing existing water tables/cleaning off old mortar #REF! #REF! #REF!

A11 Extra over and above #REF! #REF! #REF!

Removing existing barbed wire fencing/pipe railing


A12 neatly as directed.
#REF! #REF! #REF!

A Removal and Dismantling of existing structures #REF! #REF! #REF!

Foothpath And Pavement(B)

B1 Excavation #REF! #REF! #REF!

B2 Laying and spreading available soil in the sub-grade #REF! #REF! #REF!

B3 Providing filling & compaction of GSB #REF! #REF! #REF!

B4 Providing filling & compaction of WMM #REF! #REF! #REF!

B4a Construction of dry lean cement concrete Sub- base over #REF! #REF! #REF!

B5 Providing and Fixing concrete Paver Blocks #REF! #REF! #REF!

B5a Coloured blocks-100 mm th #REF! #REF! #REF!

B5b Tectile Tiles 300*300*9.80mm #REF! #REF! #REF!

B5c Removing &Refixing exstg good tiles #REF! #REF! #REF!

B6 Providing Kerb with gutter #REF! #REF! #REF!

B7 Providing New Kerb Stones #REF! #REF! #REF!

B7a Removing &Resetting kerb stones #REF! #REF! #REF!

B7b Painting kerbs #REF! #REF! #REF!

B8 M20 grade cement concrete #REF! #REF! #REF!

Providing and laying in-situ M40 Grade cement concrete


B8a #REF! #REF! #REF!
pavement

1/44
Implementation of Multi-Modal Integration Facilities at Bandongri Metro Station (Line – 7) and IC Colony Metro Station (Line – 2A)
BILL OF QUANTITIES (BOQ)-Bandongari
MCGM+PWD-
Sr No. Particulars Amount (Rs.) PWD
Electrical

B9 Providing structural steel work in trusses #REF! #REF! #REF!

B10 Guard Railing-SS #REF! #REF! #REF!

2/44
Implementation of Multi-Modal Integration Facilities at Bandongri Metro Station (Line – 7) and IC Colony Metro Station (Line – 2A)
BILL OF QUANTITIES (BOQ)-Bandongari
MCGM+PWD-
Sr No. Particulars Amount (Rs.) PWD
Electrical

B10a Guard Railing-GI #REF! #REF! #REF!

B11 Exstg Fixing of Guard Railing #REF! #REF! #REF!

B12 Providing and fixing of the precastTREE GUARD KERB #REF! #REF! #REF!

B13 Dividers for the connecting roads #REF! #REF! #REF!

B14 A DBM #REF! #REF! #REF!

B14 B Prime coat #REF! #REF! #REF!

B14 A Tack Coat #REF! #REF! #REF!

B14 B BC #REF! #REF! #REF!

B15 E Toilets #REF! #REF! #REF!

B16 Drinking Fountain #REF! #REF! #REF!

B17 KM-Stones #REF! #REF! #REF!

B Footpath and Pavements #REF! #REF! #REF!

Storm Water Drain(C)

C1 Excavation for road way in earth #REF! #REF! #REF!

C2 Laying Rubble Bed For Storm Water Drain #REF! #REF! #REF!

C3 Providing a PCC foundation for Storm Water Drain #REF! #REF! #REF!

C4 Providing a RCC Storm Water Drain (Encasement) #REF! #REF! #REF!

C5 Steel Reinforcement (12 mm Diameter) #REF! #REF! #REF!

C6 Manhole cover (0.9 x 0.6) #REF! #REF! #REF!

C7 Supplying and fixing 1.20m x 0.90m #REF! #REF! #REF!

C8 Providing and laying R.C.C. Hume pipes with Collar joi #REF! #REF! #REF!

C9 Manhole cover ( 0.45* 0.45) #REF! #REF! #REF!

C10 Water chamber entrance #REF! #REF! #REF!

CI manhole cover 175 kg ( buid item No. 55 ) heavy


C11 #REF! #REF! #REF!
0.9*0.45

C11a Manhole cover (0.9 * 0.45) #REF! #REF! #REF!

C12 Raising or lowering water entrances #REF! #REF! #REF!

C13 Raising or lowering rectangular manholes #REF! #REF! #REF!

C14 Precast slabs #REF! #REF! #REF!

C15 Plastering 25 mm #REF! #REF! #REF!

C Storm Water Drain #REF! #REF! #REF!

Road Repair and maintenance (D)

3/44
Implementation of Multi-Modal Integration Facilities at Bandongri Metro Station (Line – 7) and IC Colony Metro Station (Line – 2A)
BILL OF QUANTITIES (BOQ)-Bandongari
MCGM+PWD-
Sr No. Particulars Amount (Rs.) PWD
Electrical

D1 Filling Pot-holes and Patch Repairs with Bituminous conc #REF! #REF! #REF!

D2 Repair of old Joints #REF! #REF! #REF!

4/44
Implementation of Multi-Modal Integration Facilities at Bandongri Metro Station (Line – 7) and IC Colony Metro Station (Line – 2A)
BILL OF QUANTITIES (BOQ)-Bandongari
MCGM+PWD-
Sr No. Particulars Amount (Rs.) PWD
Electrical

D Road Repair and maintenance #REF! #REF! #REF!

Street Signages and Furniture (E)

E1 Mandatory Signs- 3 mm sheet #REF! #REF! #REF!

E2 Cautionary Signs-4mm sht #REF! #REF! #REF!

E3 Informatory Signs #REF! #REF! #REF!

E4 M.S.circular Bollards #REF! #REF! #REF!

E Street Signages and Furniture #REF! #REF! #REF!

Street Markings and Appurtenances (F)

F1 Painting Thermoplastic #REF! #REF! #REF!

Arrow marking for route direction in white or traffic


F2 #REF! #REF! #REF!
yellow as specified for speed limit upto 50kmph

F3 Cat's Eye/ Studs #REF! #REF! #REF!

F4 Street Names #REF! #REF! #REF!

F5 Junction Names #REF! #REF! #REF!

F6 Rumbles #REF! #REF! #REF!

F7 Providing stanard Benches #REF! #REF! #REF!

F8 Providing SS Dust Bin #REF! #REF! #REF!

F9 Asthetic External painting #REF! #REF! #REF!

F Street Markings and Appurtenances #REF! #REF! #REF!

Landscaping (G)

G1 Excavation for raising Lawn #REF! #REF! #REF!

G2 Excavation for planting Shrub #REF! #REF! #REF!

G3 Excavation for planting Creepers/Climbers #REF! #REF! #REF!

G4 Excavating the ground for planting individual Tree #REF! #REF! #REF!

G5 Planting Doob grass at 50mm c/c #REF! #REF! #REF!

G6 Planting Shrubs on Soft/Hard surface #REF! #REF! #REF!

G7 Planting Creepers/Climbers on Soft/Hard surface #REF! #REF! #REF!

G8 Planting Trees on Soft/Hard surface #REF! #REF! #REF!

G9 Supply and stacking of Nauclea cadamba (Kadam) #REF! #REF! #REF!

G10 Supply and stacking of Tabebuia #REF! #REF! #REF!

G11 Supply and stacking of plant Bauhinia acuminata #REF! #REF! #REF!

Supply and stacking of plant Murraya Koenigii spreng


G12 #REF! #REF! #REF!
(Kadipatta/meetha neem)

5/44
Implementation of Multi-Modal Integration Facilities at Bandongri Metro Station (Line – 7) and IC Colony Metro Station (Line – 2A)
BILL OF QUANTITIES (BOQ)-Bandongari
MCGM+PWD-
Sr No. Particulars Amount (Rs.) PWD
Electrical
Supply and stacking of Vernonia elaegnifolia (curtain
G13 #REF! #REF! #REF!
creeper)

G Landscaping #REF! #REF! #REF!

6/44
Implementation of Multi-Modal Integration Facilities at Bandongri Metro Station (Line – 7) and IC Colony Metro Station (Line – 2A)
BILL OF QUANTITIES (BOQ)-Bandongari
MCGM+PWD-
Sr No. Particulars Amount (Rs.) PWD
Electrical

Bus, Auto and taxi (H)

H1 Excavation/Dismantlig #REF! #REF! #REF!

H2 Excavation #REF! #REF! #REF!

H3 Laying and spreading available soil in the sub-grade #REF! #REF! #REF!

H4 GSB #REF! #REF! #REF!

H5 WMM #REF! #REF!

H6 Dry lean cement concrete Sub- base #REF! #REF! #REF!

H7 Laying 125 micron Low Density Polyethylene #REF! #REF! #REF!

H8 Providing and laying in-situ M40 Grade cement concrete #REF! #REF! #REF!

H9 Dowel bars #REF! #REF! #REF!

H10 Circular Steel Bollards #REF! #REF! #REF!

H11 Ss Dust Bin #REF! #REF! #REF!

H12 Providing and fixing of informatory sign board #REF! #REF! #REF!

H13 Bus Shelter #REF! #REF! #REF!

H14 Providing cast in situ / ready mix M20 grade cement conc #REF! #REF! #REF!

H15 Providing structural steel work in trusses #REF! #REF! #REF!

H Bus, Auto and taxi #REF! #REF! #REF!

Foot over bridge Lift Escalator and pergola (I)

I1 Foot Over Bridge (South bound) #REF! #REF! #REF!


I2 Skyover Bridge 1(Existing FOB Connection) #REF! #REF! #REF!
I3 Skyover Bridge 2 (proposed skywalk) #REF! #REF! #REF!
I4 Pergola #REF! #REF! #REF!
I Foot over bridge Lift Escalator and pergola #REF! #REF! #REF!

Traffic Signal and CCTV (J)

J1 Trafiic signals & CCTV #REF! #REF! #REF!

J2 CCTV #REF! #REF! #REF!

J Trafiic signals & CCTV #REF! #REF! #REF!

Electrical Works (K)

K Electrical works (Street Lighting) #REF! #REF! #REF!

K Electrical works (Street Lighting) #REF! #REF! #REF!

Total (A+B+C+D+E+F+G+H+I+J+K+L)= #REF! #REF! #REF!

Contigency (5%) #REF!

Proof checking (3%) #REF!

Total (Excluding GST) #REF!

7/44
Implementation of Multi-Modal Integration Facilities at Bandongri Metro Station (Line – 7) and IC Colony Metro Station (Line – 2A)
BILL OF QUANTITIES (BOQ)-Bandongari
MCGM+PWD-
Sr No. Particulars Amount (Rs.) PWD
Electrical
Add GST (12%) #REF! ###

Grand Total #REF! ###

8/44
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A

BILL OF QUANTITIES (BOQ)- Top Sheet- Borivali (West)

a Total Construction Cost (Including all taxes and levies)


b Contingency (5%)
c Prrof checking/PMC (3%)
d MMRDA Budget (a+b+c)
ion Facilities at Metro Stations (Line – 2A)

OQ)- Top Sheet- Borivali (West)

₹ 98,499,385.04
₹ 4,924,969.25
₹ 2,954,981.55
₹ 106,379,335.84
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Abstract Sheet-Borivali (West)
Sr no. Description Unit Quantity Rate Amount(Rs.) Reference Remark
A Excavation and Dismentaling

Demolishing existing masonry, structures, (above & belowG.L.) &


carting away serviceable material stoward chowky & stacking the Cum 50.00 708.00 35,400.00
same separately, a sdirected.(Actual Volume of the masonry will
1 bepaid.) R2-RW-7-04, MCGM USOR 2018

Removing existing barbed wire fencing/pipe railing of any height,


including posts & carting away the same to Ward Chowky & Rmt 111.53 19.00 2,119.07
2 stacking the same neatly as directed. R2-RW-7-07, MCGM USOR 2018

Removing the paver blocks of any thickness.,size,& colour from


carriage way OR footpath & transporting the same to ward depot Sqm 9,559.85 157.00 1,500,895.67
OR any where in MCGM limit. The paver blocks shall be stacked
neatly at specified location etc. complete as specified and as
3 directed by the Engineer. R2-RW-3-22, MCGM USOR 2018

Removing existing kerb stones, cleaning off old mortar, carting


away up to a distance of 2 K.M. and stacking the same as directed Rmt 2,445.30 32.00 78,249.60
4 by the Engineer. R2-RW-4-03, MCGM USOR 2018
Extra over above rates of carting for additional distance of every 2 Rmt 12,226.50 5.00 61,132.50
5 K.M. or part thereof. (Kerb stones upto 10 km extra) R2-RW-4-04, MCGM USOR 2018

Removing existing water tables/ cleaning off old mortar & carting
away to the distance of 2 K.M. and stacking the same as directed Rmt 2,445.30 32.00 78,249.60
6 by Engineer. R2-RW-4-08, MCGM USOR 2018
Extra over above rates of carting for additional distance of every 2 Rmt 12,226.50 2.50 30,566.25
7 K.M. or part thereof. (Water table upto 10 km extra) R2-RW-4-09, MCGM USOR 2018

Excavation for road way in earth ,soil of all sorts, sand, gravel or
soft murum including dressing section to there rquired grade, Cum 3,661.27 848.61 3,106,992.46
camber and side slopes and conveying the excavated materials
with all lift & leads upto a lead of 50m.beyond MCGM limits and
spreading for embankment or stacking By Manual Means and
disposing the excess material beyond MCGM limit. (with prior
8 permission of S.E.) Item No. 2.10, SSR 2018-19

Dismantling of flexible pavements and disposal of dismantled Cum 537.12 957.70 514,399.82 Item No. 3.10, SSR 2018-19
materials beyond MCGM limits , stacking serviceable and
9 unserviceable materials separately etc. complete.

Dismantling of cement concrete pavement by mechanical means


using pneumatic tools, breaking to pieces not exceeding 0.02 cum Cum 237.60 1,582.92 376,101.79 Item No. 3.11, SSR 2018-19
in volume and stock piling at designated locations and disposal of
dismantled materials beyond MCGM limits, stacking serviceable
10 and unserviceable materials separately etc. complete.
Total Amount (A) 5,784,106.76
B Footpath

Conveying materials obtained from road cutting including all


11 lifts,laying in layers of 20cm to 30cm. breaking clods, dressing to Cum - 157.19 - Item. No.2.25, SSR 2018-19
the required lines, curves, grades and section, watering and
compacting to not less than 97% of standard Proctor density for a
lead of over 50m. to 300m. inclusive from the site of excavation to
the site of deposition as directed.

Construction of granular sub-base by providing close graded


Material, mixing in a mechanical mix plant at OMC, carriage of Cum 1,098.38 2,415.69 2,653,349.81 Item. No.3.01, SSR 2018-19
mixed Material to work site, spreading in uniform layers with motor
grader/ Paver on prepared surface and compacting with vibratory
roller to achieve the desired density, complete as per clause 401 --
11a Plant Mix Method and Grading - I Material

Wet Mix Macadam -- Providing, laying, spreading and compacting


graded stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in mechanical Cum 926.78 2,442.78 2,263,923.92 Item. No.3.23, SSR 2018-19
mix plant carriage of mixed Material by tipper to site, laying in
uniform layers with paver in sub- base / base course on well
prepared surface and compacting with vibratory roller to achieve
the desired density.
12 Laying By Grader/Paver.

Providing&layingM-10 cement concrete avg.compressive


strength13.5Mpa for foundation/encasement/pavements with or
without chequered design including formwork, mixing in non-tilting Cum 732.25 4,802.00 3,516,286.11
mechanical mixer (with Weigh Batcher), placing,vibrating with plate
vibrator, needlevibrator, finishing, curingetc. complete as specified
and as directed (cement mortar vata will be paid separtely).
Contractors have to make their own arrangement for potable
water for construction/curing with hessain cloth, etc. & will be not R2-RW-10-03, MCGM USOR
13 paid separately for it. 2018
Providing & fixing in the foothpath Concrete Paver blocks 200 X
200 X 80 mm thick or any approved size in grey or any specified
colour with shot blasted texture or any approved texture on top
surface of approved pattern/shape and colour having average
crushing strength not less than 50N/mm² as per technical
specifications and IS CODE 15658:2006 manufactured in double
layer precast concrete Paver blocks 12 to 15 mm thick to player
and consisting of cubical shape Quartz stone aggregate 8mm sieve
100% passing and retained on 4.75 mm size sieve, silica sand. The
bottom layer should be 65 to 68mm thick in grey cement having
12mm sieve100% passing aggregates as per technical
specifications, rested on average compacted thickness of 25mm Sqm 7,877.20 1,717.00 13,525,145.53
well graded sand cushioning uniformly compacted with proper
capacity mechanical compactor with required level, grade and
camber etc. complete as specified and as directed by the Engineer.

14 R2-RW-3-29, MCGM USOR 2018

Transporting & fixing the available muncipal paver blocks having


any type, size, shape, colour & thickness etc. on roads & footpaths.
The paver blocks shall be placed on average compacted thickness Sqm 984.65 240.00 236,315.88 R2-RW-3-23, MCGM USOR
of 25 mm well graded sand cushioning uniformly compacted with 2018
proper capacity mechanical compactor with required level, grade
and camber etc. complete as specified and as directed by the
Engineer. (Rate is inclusive of transporting, loading and unloading
of paver blocks from ward depot or anywhere in MCGM limit to site
15 and fixing the same etc.)

Providing and laying tactile tile (for vision impaired persons as per
standards) of size 300x300x9.8mm having with water absorption Sqm 984.65 1,933.75 1,904,065.97 Item. No. 16.90, CPWD DSR
less than 0.5% and conforming to IS:15622 of approved make in all 2018
colours and shades in for outdoor floors such as footpath, court
yard, multi modals location etc., laid on 20mm thick base of cement
mortar 1:4 (1 cement : 4 coarse sand) in all shapes & patterns
including grouting
the joints with white cement mixed with matching pigments etc.
16 complete as per direction of Engineer-in-Charge.

Providing and fixing of cement concrete Kerb Stone of various


grades of size: 500mm width x 325 height x 165 mm thick (Half
Batter, Bull Nose/ Full Batter manufactured in wet press vacuum Rmt 2,445.30 1116.00 2,728,954.80 R2-RW-10-50, MCGM
dewatering technology plant/ equivalant with face pimple finish for USOR 2018
high visibility with excellent quality and finish and edges perfect
and sharp. Grade–M-25 including excavation in any soile xceptrock,
laying a leveling course of M15 grade RMC 100mm thick to
required slope (inclusive off orm work), jointing in C.M.1:2
proportion flush to concrete surface, painting exposed surface with
one coat of primer and two coats of 1st grade road marking paint in
the yellow/ white/ black or any shade as directed. (Kerb stones
17 shall be procured from MCGM registered agencies ).

35,100.00 R2-RW-4-02, MCGM USOR


Removing & resetting kerb stones in 1:2 C.M. on new R.M.C. M-20
C.C. bed 15 cm, thick including filling the joints with 1:2 C.M. Rmt 100.00 351.00
2018
18 pointing, curing etc. complete.

Providing applying Yellow & Black road marking paint grade–Iin3-


coats including single coat of approved brand primer after cleaning Rmt 100.00 50.00 5,000.00 R2-RW-7-17, MCGM USOR
of old surface of kerb stone with brushing by wire brush as per 2018
relevant I.S. codes to the satisfaction of Engineer-in-charge etc.
19 complete.

Providing and fixing of the precast tapered watertable of thickness


varying from 105 to 125 mm, 300 mm width in M-20 grade RMC R2-RW-10-61, MCGM
(Supplied through MCGM approved plant) or concrete mixed with Rmt 2,445.30 471.00 1,151,736.30
use of weigh batch mixers as detailed in drawing No. USOR 2018
DyChE/Rds/94/E.S. dated 17.8.2005 inclusive of excavation in any
soil except rock, laying of leveling course of M-15 grade RMC 100
mm thick to the required slope, (inclusive of formwork) jointing in
1:2 cement mortar prop. flush to concrete surfaces as directed
20 (Water tables shall be procured from MCGM registered agencies).

Removing & resetting water tables 30 cm wide on a new M-20


cement concrete bed 15 cm. thick including filling in the joints with Rmt 100.00 398.00 39,800.00 R2-RW-4-07, MCGM USOR
C.M.1:2 and cement pointing, curing including removing the old 2018
21 cement bed, curing etc. complete.
Total Amount (B) 28,059,678.32
C Storm Water Drainage

Constructing single water entrance of internal size 0.45m x 0.45m


with cast-in-situ coping in M-20 grade, fixing of grating in M -20 as NOS 142.00 10,575.00 1,501,650.00
per standard drawings (Dwg No. MCGM/SWD/2013-11), etc
complete as specified and as directed by Engineer in Charge. MCGM-SWD-SOR-2018-R2-SWD-
22 (excluding excavation, providing and fixing of gratings and frame) 143
Supply of 0.45m X 0.45m clear internal size of M.S. Galvanised
hinged type grating and frame (weighing minimum 53 kg) of grade
HD20,with minimum 75 microns zinc coating by hot dipped NOS 142.00 6,962.00 988,604.00
galvanising the MS grating and frame as per IS 2629. (The
contractor shall furnish the certificate of galvanising from the
Galvaniser.) incuding testing, inspection of material sample and
finished product in presence of M.C.G.M. Engineers (3 nos.) at
Manufacturers works, as per drawing (Dwg No. MCGM/SWD/2013-
08), etc complete as specified & as directed by Engineer in MCGM-SWD-SOR-2018-R2-SWD-
23 Charge.A228 174

Providing and laying 150mm dia NP2 Class R.C.C. Hume pipes with
Collar joints conforming to IS 458:2003 and laid on approved
bedding as per IS 783:1985 (reaff. 2010) including jointing the pipes RMT 553.26 612.00 338,597.87
and filleting with hemp and stiff mix of cement mortar 1:2,
including testing of pipes at contractors costs (in presence of
municipal staff) as per IS 3597 etc. complete as specified & as
directed by Engineer in Charge. (excluding necessary earthwork & MCGM-SWD-SOR-2018-R2-SWD-
24 bedding ). 72

Raising of manholes / chambers to the required level including


removing the old frame and cover, brickwork with min 16cm thick NOS 5.00 3,155.00 15,775.00
coping in CC M30, plastering the wall in C.M. 1:3 externally and
internally with neat cement rendering , curing, refixing the frame MCGM-SWD-SOR-2018-R2-SWD-
25 and cover etc complete, as directed by Engineer in Charge. 225

Lowering of manholes / chambers to the required level including


removing the old frame and cover, dismantling the brickwork,
coping, plastering to the required level with disposal of debris to NOS 5.00 1,485.00 7,425.00
the approved site, refixing the frame and cover with min 15cm
thick coping in CC M30, curing etc. complete, as directed by MCGM-SWD-SOR-2018-R2-SWD-
26 Engineer in Charge. 226

Supplying 0.90m x 0.45m internal size rectangular air tight


composite resin manhole cover and frame of approved brand with
grade designation C250 as per EN-124 standard with bolt and lever
type locking arrangement. Covers & frame shall have top abrasion NOS 10.00 21,945.00 219,450.00
resistant layer conforming to IS-15658:2006 and permissible
permanent set value of 1.5 mm after the application of 2/3 test
load in five continuous applications as per EN-124, the testing shall
be performed in fully equipped and NABL certified test lab with
random batch test (2% of lot size) as per testing procedure stated
in EN-124 standard, including testing ,inspection of material sample
and finished product in presence of M.C.G.M. Engineers (3 nos.) at
Manufacturers work , etc. complete as specified and as directed by
Engineer in Charge. (Inspection shall be as per guidelines of IS and MCGM-SWD-SOR-2018-R2-SWD-
27 EN-124 standard specifications.) 191

Supplying 0.90m x 0.60m internal size rectangular air tight


composite resin manhole cover and frame of approved brand with
grade designation C250 as per EN-124 standard with bolt and lever
type locking arrangement. Covers & frame shall have top abrasion NOS 244.00 28,263.00 6,896,172.00
resistant layer conforming to IS-15658:2006 and permissible
permanent set value of 2 mm after the application of 2/3 test load
in five continuous applications as per EN-124, the testing shall be
performed in fully equipped and NABL certified test lab with
random batch test (2% of lot size) as per testing procedure stated
in EN-124 standard, including testing ,inspection of material sample
and finished product in presence of M.C.G.M. Engineers (3 nos.) at
Manufacturers work , etc. complete as specified and as directed by
Engineer in Charge. (Inspection shall be as per guidelines of IS and MCGM-SWD-SOR-2018-R2-SWD-
28 EN-124 standard specifications.) 192

Providing and Constructing brick masonary inspection chamber


rectangular 0.9M x 0.60M and 0.6M deep on sewer with 230mm
brick walls in cement mortar 1:3 plastered both inside & outside
with 20 mm thick cement mortar 1:2 and neat cement rendering so NOS 1.00 49,457.43 49,457.43
as to give a smooth surface including 230mm cement concrete
bedding (M 15) and cement concrete (M 15) in haunches and
channels finished smooth with 20 mm thick cement mortar( 1:1)
and fixing C.I. heavy duty airtight rectangular frame & cover of size
0.9M x 0.45M weighing minimum 270Kg. resting on 300 mm high
c.c. cap M 20 with (1:1) cement plaster on both the sides &
necessary C.I. steps ( weighing 5.4 kg each)staggered at 300mm
c/c. including 75 mm wide vata all round the external portion of the
chamber and the foundation concrete in C.M. 1:1 etc. complete as
per plan in and as per drawing (Dwg No. MCGM/SWD/2013-03), etc
complete as specified & as directed by Engineer in Charge. (without MCGM-SWD-SOR-2018-R2-SWD-
29 excavation ) . 119
Providing and laying RMC (Ready Mixed Concrete) M-25 grade RCC
(Reinforced Cement Concrete) work in dhapas, beams and slabs, Cum 10.08 16,195.00 163,245.60
etc. with reinforcement between 0.8% to 1%, including curing by
any means, providing, placing, removing, launching, cleaning,
stripping the form work,finished with cement sand plaster 12 mm
thick in 1:2 proportion, etc. complete as directed by Engineer in MCGM-SWD-SOR-2018-R2-SWD-
30 Charge. 17-A
Desilting underground storm water drains of any size and shape for
all depths by any means without human entry inside the losed
drains, manholes etc including pumping out liquid waste or
sewage / plugging or diverting the flow in the drain if necessary,
sprinkling approved disinfectant on the removed silt to avoid bad
smell as directed within a radius of 300m, Stacking the same for
transportation purpose including taking precautionary & safety
measures such as test for gases, use of safety belts, dry cell torches
for lighting inside the manholes and drains etc. complete as Cum 12.20 569.00 6,941.80
directed by Engineer in Charge. (for payment purpose 30% will be
deducted for voids in silt and 40% for stones and boulders.)

MCGM-SWD-SOR-2018-R2-SWD-
31 1
Total Amount (C) 10,187,318.70
D Street Furniture

Providing, fabrication and fixing M.S. railing of 10 Gauge, 40mm X


40mm square pipe railing with 18mm X18 mm square intermediate
support, 65mm X 65mm square main supports with M.S. pedestal RMT 2,599.60 7,596.00 19,746,561.60
(base -1type) and M.S. cap- (type-1) including cutting, welding,
riveting, oil painting with navy blue colour or any other approved
colour shade as directed and fixing in cement concrete foundation
as shown vide Sr.No. 2f-A1 in catalogue of Street Furniture (Vol.I)
published by M.C.G.M. including removal of surplus material
/debries and restoring damaged portion of footpath, etc. as MCGM-Traffic-SOR-2018-R2-RT-
32 directed. (without advertisement panel) 16-01

Circular Steel Bollards : Providing, fabricating and fixing circular


Steel Bollards of 100mm dia circular Steel Pipe (of type 3F-A-1) as
per the design incorporated in the Catalogue of Street Furniture
(Vol-II). Published by MCGM, made of 10 Guage, 304 quality NOS 246.00 16,062.00 3,951,252.00
material with minimum nickel content not less than 10%
(laboratory testing certificate shall be provided for used material)
with steel pedestal and steel cap as per designs (3F-A1), (3F-A1.1),
(3FA1.2) and (3F-A1-3) suitable to match the design adopted for
surrounding railing including cutting, welding, riveting, polishing.
The foundation shall either be with base plate of 200 x 200 x 6mm
thick, 16 mm dia J Bolts or embedding pipe in foundation by
providing 20mm Dia x 6 nos holdfasts embedded in 1:2:4 concrete
as shown in drawing (3F-A1.1). inclusive of making good the
damage portion of footpath with matching pavers blocks, tiles
removing debris etc. complete as per specifications and as directed MCGM-Traffic-SOR-2018-R2-RT-
33 by the Engineer. 16-14
SS Dust Bin (Refer sketch 10) Product area:0.76Sqm, Capacity in NOS 48.00 17,265.00 828,720.00 MCGM-Garden-SOR-2018-GW-
34 ltrs: 42.0 ltrs, Product height: 0.92m 3-2-f
Standard Bench (Refer sketch 14) Product area: 1.8 x 0.6 mts, NOS 46.00 23,671.00 1,088,866.00 MCGM-Garden-SOR-2018-GW-
35 Capacity in nos: 4 nos, Product height: 0.80m 3-2-j

Supply & Fixing of Pre-Fabricated SS 304 Bus Stop Shelter which is


Made out of Column pipe 168.3 mm OD, Top Column connection NOS 2.00 969,108.00 1,938,216.00
Pipe 141 mm OD, Roofing Structure of SHS 40 x 40 mm & SS Plate 2
To 5 mm thk. Back & Side Display Board frame of RHS 100 x 50 mm,
Back covered by 4mm ACP & front covered by 2 mm transparent
Polycarbonate sheet with Lighting arrangement, Sheeting Bench of
SS Pipe 141 OD / 60 OD / 21.3 OD and Top Roofing of 4 mm thk
including Civil Work With Soling, PCC, Foundation Brick Work &
Chequered Precast Cement Concrete Sheet 22 mm Thk Complete
36 as per provided Image Size: 5L X 2W X 2.5H Mtr. Market Analysis
Total Amount (D) 27,553,615.60
E Signages and Road Markings

Road Marking with Hot Applied Thermoplastic Compound with


Reflectorizing Glass Beads on Bituminous Surface- Providing and SQM 916.40 668.94 613,014.39
laying of hot applied thermoplastic compound 2.5 mm thick
including reflectorizing glass beads @ 250 gms per sqm area,
thickness of 2.5mm is exclusive of surface applied glass beads as
per IRC:35 .The finished surface to be level, uniform and free from PWD-MH-DSR-2018-6.12-
37 streaks and holes.complete. (MORTH-803.4)
Supplying and Fixing of Molded Shank Raised Pavement Markers /
Cat's Eye made of polycarbonate and ABS moulded body and
reflective panels with micro prismatic lens capable of providing
total internal reflection of the light entering the lens face and shall
support a load of 16000 kg tested in accordance to ASTM D 4280 NOS 2,165.00 514.11 1,113,048.15
Type H and complying to Specifications of Category A of MORTH
Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height,
width and length shall not exceed 50 mm, 100 mm and 102 +/- 2
mm and with minimum reflective area of 13 Sqcm on each side and
the slope to the base shall be 35 +/- 5 degree. The strength of
detachment of the integrated cylindrical shanks, (of diameter not
less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from
the body is to be a minimum value of 500 Kg. Fixing will be by
drilling holes on the road for the shanks to go inside, without nails
and using epoxy resin based adhesive as per manufacturer's
recommendation and complete as directed by the engineer.The
contractor shall submit a two year warranty for satisfactory field
performance including stipulated retroreflectance of the reflecting PWD-MH-DSR-2018-6.09-
38 panel, to the Engineer. (MORTH-804/806)

Providing and fixing Mandatory/Regulatory sign boards in circular


shape of 600 mm dia made out of 3mm aluminum composite
material ( ACM) sheet bonded with white retro reflective sheeting
of Class C ( Type XI Micro prismatic grade sheeting) having pressure
sensitive /heat activated adhesive retoreflective specified back
ground, border and back side retoreflctive symbols, letters, NOS 25.00 4,729.88 118,247.00
numerals, arrow as per IRC:67- 2012 Table No 8.3 Supported with
back support frame 25mm x 25mm x 3mm, duly painted on back
side with grey stove enamel paint and supported on one no. of M.
S. angle iron post of size 65 mm X 65 mm X 6 mm, 3.45 m long, duly
painted with with flat oil paint having alternate black and white
bands of 25 cm width including G.I. fixtures etc; fixing the boards in
M25 grade concrete block of size 60cm X 60cm X 75cm including
transportation etc; complete. Class C ( Type XI Micro prismatic
grade sheeting) shall have 10 years written warranty from the
manufacturer and authorised distributor/convertor issued for field
performance including the screen printed areas and cutout
sheeting and cut-out durable transparent overlay film and this
warranty certificate in original should be submitted to the Engineer PWD-MH-DSR-2018-6.28 (b)-
39 in charge by the contractor /supplier. (MORTH-801)

Providing and fixing Cautionary/Warning sign boards in Equilateral


Triangle size of 900 mm made out of 4mm aluminum composite
material ( ACM) sheet bonded with white retro reflective sheeting
of Class C ( Type XI Micro prismatic grade sheeting) having pressure
sensitive /heat activated adhesive retoreflective specified back NOS 25.00 5,553.65 138,841.25
ground, border and back side retoreflctive symbols, letters,
numerals, arrow as per IRC:67-2012 Table No 8.3 Supported with
back support frame 25mm x 25mm x 3mm, duly painted on back
side with grey stove enamel paint and supported on one no. of M.
S. angle iron post of size 65 mm X 65 mm X 6 mm, 3.45 m long, duly
painted with with flat oil paint having alternate black and white
bands of 25 cm width including G.I. fixtures etc; fixing the boards in
M25 grade concrete block of size 60cm X 60cm X 75cm including
transportation etc; complete. Class C ( Type XI Micro prismatic
grade sheeting) shall have 10 years written warranty from the
manufacturer and authorised distributor/convertor issued for field
performance including the screen printed areas and cut-out
sheeting and cut-out durable transparent overlay film and this
warranty certificate in original should be submitted to the Engineer
in charge by the PWD-MH-DSR-2018-6.30 (f)-
40 contractor/supplier. (MORTH-801)
Providing and fixing of retro- reflectorised informatory sign board
ectangular/Square in shape having area less than 0.9 square meter
made out of 4mm aluminum sheet bonded with white retro
reflective sheeting of Class B ( Type IV High intensity micro-
prismatic grade sheeting-HIP) having pressure sensitive/heat
activated adhesive retoreflective specified back ground, border and
back side retoreflctive symbols, letters, numerals, arrow as per Sqm 25.00 8,872.37 221,809.25
IRC:67-2012 Table No 8.3, supported with back support frame
25mm x 25mm x 3mm, duly painted on back side with two coats of
grey stove enamel paint and supported on one no. mild steel angle
iron post 75 mm x 75 mm x 6 mm, 3.5 mt long firmly fixed to the
ground by means of properly designed foundation with M25 grade
cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level
as per approved drawing The angle iron post shall be duly painted
with one coat of epoxy primer and two coats of epoxy finish paints
having alternate black and white bands of 25 cm width including GI
fixures and transportation etc.complete.The nut bolts of board with
angle iron post/supporting structure after fixing at site has to be
electrically welded. Class B ( Type IV High intensity micro-prismatic
grade sheeting-HIP) sheeting shall have 7 years written warranty
from the manufacturer and authorised distributor/convertor issued
for field PWD-MH-DSR-2018-6.33 (b)-
41 performance. (MORTH-801)

Structure 1" x 1" MS square pipe, 16 gz Double Frames painted


with enamel paint ovar coat, 4MM ACP sheet on back and all 4 NOS 1.00 29,250.00 29,250.00
side, used LED stripps 4 doted with 2 year warranty, printing with
42 branded Star Flex. 10' x 6.5' Market Analysis

Providing, fabricating & erecting Street Name Board (type 2S-A-1)


as per the design incorporated in the catalogue of street Furniture
(Volume-II) Published by M.C.G.M. Vertical pole shall Hot dip
galvanised M.S. Square pipe of size 75x75x3.5mm thk. Signage NOS 8.00 22,712.00 181,696.00
plaque (box) shall be Hot dip galvanised M.S. angle frame covered
with 4mm thk aluminum composite panel. The signage plaque shall
be fixed to the vertical pole with 40x10mm thk size MS support
plate. Both the boxes shall be pasted with MICRO PRISMATIC
GRADE retro reflective base sheets on both sides conforming to
Type XI standards of I.R.C. 67 2012 CODE. Letters or borders to be
pasted using transparent electro cuttable film. The reflectivity of
sheet shall have guarantee of 10 years, the reflection count shall
not be less than 80% of its original reflection after 10 years. The
vertical pole shall be fixed to the ground by means of a properly MCGM-Traffic-SOR-2018-R2-RT-
43 designed foundation of size 750x750x900mm. 16-08

Providing, fixing & erecting on site Junction Name Board / Chowk


(type 2S-D), as per the design incorporated in the catalogue of
street Furniture published by M.C.G.M., Vertical pole shall be Hot
dip galvanised M.S. Square pipe of size 100mm x 100mm x 3.5mm NOS 8.00 35,459.00 283,672.00
thick. Signage plaque (box) shall be of size 900mm x 900mm made
of M.S.L angle frame of size 50mm x 50mm x 6mm thick covered
with4mm thick aluminum composite panel on both sides, The box
shall be pasted with MICRO PRISMATIC GRADE retro reflective base
sheets on both sides conforming to Type XI standards of R.C. 67
2012 CODE. Letters or borders to be pasted using transparent
electro cuttable film. The reflective of sheet shall have guarantee
of10 years. The refection count shall not be less than80%of its
original reflection after10 years. The vertical pole shall be fixed by
means of a properly designed foundation of size MCGM-Traffic-SOR-2018-R2-RT-
44 750mmx750mmx900mm. 16-15
Total Amount (E) 2,699,578.04
F Road Repair Works

Providing and laying Cast in situ/Ready Mix cement concrete in


M20 of trap/ granite/quartzite/gneiss metal for bed blocks,
foundation blocks and such other items including bailing out water,
45 Steel centering, formwork, laying/ pumping, compacting, Cum 9 6575 56,216.59
roughening them if special finish is to be provided, finishing uneven
and honeycombed surface and curing etc. complete. The Cement
Mortar 1:3 plaster is considered for rendering uneven and
honeycombed surface only. Newly laid concrete shall be covered
by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be
allowed.), with fully automatic micro processor based PLC with
SCADA enabled reversible Drum Type mixer/ concrete Batch mix
plant (Pan mixer) etc. complete. With fine aggregate (Natural
Sand / Crushed sand VSI Grade finely washed etc) Item no. 24.10, SSR 2018-19
Providing and laying 125 micron Low Density Polyethylene (LDPE)
46 sheet confirming to IS 3395 : 1997 below concrete pavement Sqm 532 22.46 11,948.72 Item no. 5.19, SSR 2018-19
including all materials and labour complete.

Providing and laying in-situ M40 Grade unreinforced plain cement


concrete pavement over a prepared sub base with 43 grade
cement , coarse and fine aggregate ( natural sand/ VSI grade finely
washed crushed sand) conforming to IS 383, using fine and coarse Cum 544.58 7,423.63 4,042,723.31
aggregates combined gradation as per Table 600-3 of MORTH
Specification 2013, mixed in a batching and mixing plant/ non
tilting mixer and Weigh batcher as per approved mix design,
admixtures, transporting to site, spreading, laying with approved
make paver,compacted and finished in a continuous operation,
finishing to lines and grades as directed by Engineer-in-charge and
curing by curing compound /by providing cement vata in cement
Mortar 1:8 @0.6m X 0.6m centre to centre, admeasuring 80 mm at
bottom and 40 mm at top with depth of 75mm and maintaining the
same throughout curing period by any other method approved by
47 Engineer-in-charge. Item no. 5.03, SSR 2018-19

Prime coat - Providing and applying primer coat with bitumen


emulsion on prepared surface of granular Base including cleaning Sqm 490.00 22.46 11,005.40
of road surface and spraying, primer at the rate of 0.60 kg/sqm
48 using mechanical means. Item no 3.29, SSR 2018-19

DENSE BITUMINOUS MACADAM: Proving and laying dense


bituminous macadam using crushed aggregates of Grading 1,
premixed with bituminous binder of specified grade of Bitumen @ Cum 73.50 7,444.39 547,162.67
4.50 per cent by weight of total mix and filler, transported to site
with VTS , laid over a previously prepared surface, finished to the
required grade, level, alignment, and rolling to achieve the desired
density for 76-100 mm compacted thickness .USING Batch mix type
hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone
Dust filler.(VG-30 bulk bitumen rates are considered to arrive at
49 rates) Item no. 3.44, SSR 2018-19

Providing and applying tack coat on the prepared surface heating


by fames in Boiler and spraying bitumen with sprayer on Dry / Sqm 490.00 13.00 6,370.00
Hungry B.T. surface 3 kg/10 sqm. (VG-30 bulk bitumen rates are
50 considered to arrive at rates) Item no. 3.31, SSR 2018-19

BITUMINOUS CONCRETE:- Providing and laying bituminous


concrete using crushed aggregates of grading 1, premixed with Cum 73.50 7,762.32 570,530.52
bituminous binder @ 5.20 per cent by weight of total mix and
filler, transported to site with VTS , laid over a previously prepared
surface, finished to the required grade, level, alignment, and rolling
to achieve the desired compaction for 50 mm compacted thickness
with specified grade of Bitumen,Excluding prime / tack coat. For
Bitumen of specified grade -- USING Batch mix type hot mix plant
with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.
51 (VG-30 bulk bitumen rates are considered to arrive at rates) Item no. 3.48, SSR 2018-19

Filling Pot-holes and Patch Repairs with Bituminous


concrete,40mm.(Removal of all failed material, trimming of
complete dexcavation to provide firm vertical faces, cleaning of Sqm 200.00 288.00 57,600.00
surface,painting of tackcoat on the sides and base of excavation as
per clause503 ,backfilling the potholes with hot bituminous materia
l as per clause 504, compacting, trimming and finishing the surface
to form a smooth continuous surface, all as per clause 3004.2 as R2-RW-12-05 a, MCGM USOR
52 per MORTH 5th revision 2013) for grading II Material 2018
Total Amount (F) 5,303,557.21
G Landscaping
Excavation for planting Hedges/ Edges/ Flower Beds on Hard
surface: Excavating the ground to the depth of 30 cm removing SQM - 121.00 -
53 excavated material from the site. MCGM-GW-1-4-b

Planting Hedges/ Edges/ Flower Beds on Soft/Hard surface: Filling


Red Hill Earth & Cow Dung Manure in the excavated area mixing in
2:1 proportion, watering, weeding after every watering before SQM - 503.00 -
planting the shrub, leveling, providing and planting well grown,
healthy, bushy shrubs including transport and unloading as per
specified variety and sizes, planting at desired location and
specified distances, maintaining for 1 month after completion of
plantation and replacement of casualties till 1 month. Filling good
garden soil mix with manure (Fine Dressing), Leveling, Weeding,
Maintenance, Planting Creeper (Labour, transport and unloading)
54 (Excluding cost of plant) GW 2-4-a MCGM
Supplying of small & mediam Shrubs Thuja compacta, Arundodonax NOS - 50.00 - GW-5-157, GW-5-
55 veisicolor, Hydrangia macrophylla 79, GW-5-161 MCGM
Providing and fixing of the precast TREE GUARD KERB of M-20 C.C.
of height 230mm., width 100mm., Length 400 mm.,finished neatly, RMT 125.00 471.07 58,883.75
compacting , curing, formwork etc. including bedding of M-10
C.C.procured from M.C.G.M.approved R.M.C plant,10cm.thick,
filling of jointing in C.M. 1:2 and panting the exposed surface with 3
coats of road marking paint, Grade I of approved colours and
quality including single coat of approved brand primer including
56 excavation in C.C. ,asphalt etc. as specified and as directed. R2-RW-10-37 MCGM

Providing and fixing 30mm thick FRP moulded grating around tree SQM - 7,592.00 -
as a tree guard , capable to withstand minimum point load of 5 MT.
(For Pedestrin, two wheeler) as per drwaing and details to
57 satisfaction by Engineer in charge. Market Analysis

Excavation for Transplanting Trees on Hard surface: Excavating the


ground in the Concrete/ masonry/ asphalt/ hard rock for -
transplanting the tree to the desired location, with required
machinery. Tree to be lifted with roots & replaced in fresh soil.
Making trench at suitable distance away from the stem based on
age of the plant in a circular fashion to a sufficient depth to remove
58 the ball of earth & applying fungicide on cut portion. GW 1-6-a MCGM pg.no.13
(a) Tree Girth upto 0.15 M NOS - 349.00 -
(b) Tree Girth upto 0.3 M NOS - 394.00 -
(c) Tree Girth upto 0.6 M or more NOS - 815.00 -

Excavation for planting Transplanted Trees: Excavating the ground NOS - 202.00 -
for planting individual Tree (Transplanted tree) in the area
59 demarketed making trench based on age of the plant. GW 1-6-b MCGM pg.no.13

Transplanting of Trees: Planting the tree in the pit filled with good
soil, pressed down layer by layer, insecticide to be sprayed before
planting, broken limbs tobe removed. tree to be supported by NOS - 616.00 -
three strong stakes driven into the ground metre away from the
stem, transport to the site & planting , preparation of tree basin,
watering & maintaining for 1 month after completion of plantation
and replacement of casualties till 1 month.a) Filling good garden
soil mix with manure (Fine Dressing), b) Levelling, c) Weeding, d)
Maintenance, and e) Planting Tree (Labour, transport and
60 unloading) GW 2-5-c MCGM pg.no. 17

Providing second class Burnt Brick masonry with conventional/ I.S. CUM - 5,877.49 -
type bricks in cement mortar 1:6 in plinth as backing in composite
masonry including bailing out water manually, striking joints, raking
61 out joints and watering etc Complete. 27.03 BDG 3 PWD

Steel reinforcement for R.C.C. work including straightening, cutting,


bending, placing in position and binding all complete upto plinth Kg - 56.60 -
level.(Thermo-
62 mechanically Treated bars of grade Fe-500D or more.) CPWD DSR (5.22.6 & Pg 100)

Providing internal cement plaster 25mm thick in two coats in


cement mortar 1:4 without neeru finish, to concrete, brick or stone SQM - 544.85 -
surfaces, in all positions including scaffolding and curing
63 etc.complete. 32.09 BDL 5 PWD
64 Coloured Granite of size 200 x 200 x 40mm thick SQM - 1,722.00 - MA-RW-050a

Providing and fabricating structural steel work in rolled sections like


joists, channels, angles, tees etc. as per detailed design and KG - 86.45 -
drawings or as directed including cutting, fabricating, hoisting,
erecting, fixing in position making riveted / bolted /welded
connections without connecting plates, braces etc. and including
one coat of anticorrosive paint and over it two coats of oil painting
65 of approved quality and shade etc. complete. 23.01 BDC 2

Providing and laying in situ / ready mix M-20 cement concrete of


trap /granite /quartzite /gneiss metal for approach slab / Rigid CUM - 5,745.12 - Item. No.11.25, SSR 2018-19
pavement including compacting, finishing, curing etc. complete.
(excluding reinforcement) (with reversible drum type mixer/
concrete batch mix plant (pan mixer) with SCADA with fine
agreegates of required specifications (Natural sand / VSI sand finely
66 washed etc ), cement 6.40 bags/cumt)

Excavation for raising Lawn on Hard surface: Excavating the ground Sqm 1,182.00 89.00 105,198.00 As per Item GW 1-1 b , MCGM
67 to the depth of 30 cm removing excavated material from the site. garden SOR 2014

Excavation for planting Shrubs on Soft surface (Individual): Sqm 561.00 121.00 67,881.00
Excavating the ground for planting individual shrub in the earth / As per Item GW 1-2 a , MCGM
68 murum / sand for a pit size of 0.60 m X 0.60 m X 0.60 m garden SOR 2014

Excavation for planting Creepers/Climbers on Soft surface:


Excavating the ground to the depth of 30 cm removing excavated Cum - 61.00 - As per Item GW 1-3 a , MCGM
69 material from the site. garden SOR 2014
Excavating the ground for planting individual Tree (sapling ht. 4'-5'
at the time of plantation) in the earth / murum / sand for a pit size Nos 78.00 202.00 15,756.00 As per Item GW 1-5 a , MCGM
70 of 1.0 m X 1.0 m X 1.0 m garden SOR 2014

Planting Doob grass at 50mm c/c and Providing and filling Red Hill
Earth & Cow Dung Manure mixing in 2:1 proportion, watering to
the depth of 1" three times, weeding after every watering before Sqm 1,182.00 338.00 399,516.00
plantation of the grass, leveling, rolling after proper compaction,
planting of good quality lawn suckers by dibbling method in
staggered fashion at specified intervals including transport &
unloading. Watering and proper mowing etc. maintaining for 1
month after completion of plantation and replacement of As per Item GW 2-1 a , MCGM
71 casualties till 1 month. garden SOR 2013

Planting Shrubs on Soft/Hard surface (Individual): Filling Red Hill


Earth & Cow Dung Manure and soil excaveted from pit in the
excavated pits mixing in 2:1:1 proportion, watering, weeding after Sqm 561.00 667.00 374,187.00
every watering before planting the shrub, leveling, providing and
planting well grown, healthy, bushy shrubs including transport and
unloading as per specified variety and sizes, planting at desired
location and specified distances with appropriate staking,
maintaining for 1 month after completion of plantation and As per Item GW 2-2 a , MCGM
72 replacement of casualties till 1 month. garden SOR 2014

Planting Creepers/Climbers on Soft/Hard surface: Filling Red Hill


Earth & Cow Dung Manure in the excavated area mixing in 2:1
proportion, watering, weeding after every watering before planting Sqm - 358.00 -
the shrub, leveling, providing and planting healthy, bushy creepers
including transport and unloading as per specified variety and sizes,
planting at desired location and specified distances with
appropriate staking, maintaining for 1 month after completion of As per Item GW 2-3 a, MCGM
73 plantation and replacement of casualties till 1 month. garden SOR 2014

Planting Trees on Soft/Hard surface (Individual): Filling of Red Hill


Earth, Cow Dung Manure & good earth from excaveted pit in the
excavated pits mixing in 2:1:1 proportion, watering & providing
well grown trees with minimum average girth of 2" and minimum Nos 78.00 735.00 57,330.00
height of 10' above finished level after plantation of specified
variety , at desired location & at specified distances. Achieving
finished grade level. Planting the tree with appropriate anchoring,
leveling the top soil surface as specified after plantation, staking to
balance the tree. Including transport to the site & planting ,
preparation of tree basin, watering & maintaining for 1 month after
completion of plantation and replacement of casualties till 1 As per Item GW 2-5 a, MCGM
74 month. garden SOR 2014

Supply and stacking of Nauclea cadamba (Kadam) plant of height Nos 40.00 60.00 2,400.00
150-165 cm. in big poly bag of size 25 cm as per direction of the
officer-in-charge These rates are inclusive of contractor’s profit, As per Item 7.6, MCGM
75 over heads, carriage, octroi, royalty, sales tax (VAT) etc. Horticulture DSR DAR 2016

Supply and stacking of Tabebuia sp. plant of height 150-165 cm. in Nos 38.00 80.00 3,040.00
big polybags of size 25 cm as per direction of the officer-in-charge
These rates are inclusive of contractor’s profit, over heads, As per Item 7.84, MCGM
76 carriage, octroi, royalty, sales tax (VAT) etc. Horticulture DSR DAR 2016

Supply and stacking of plant Bauhinia acuminata height 60-75 cm. Nos 755.00 45.00 33,975.00
in earthen pots of size 20 cm as per direction of the officer-in-
charge. These rates are inclusive of contractor’s profit, over heads, As per Item 8.1 , MCGM
77 carriage, octroi, royalty, sales tax (VAT) etc. Horticulture DSR DAR 2016

Supply and stacking of plant Murraya Koenigii spreng


(Kadipatta/meetha neem) of ht 45-60 cm well developed in earthen Nos 755.00 25.00 18,875.00
pots of size 20 cm. per direction of the officer-in-charge. These
rates are inclusive of contractor’s profit, over heads, carriage, As per Item 8.45, MCGM
78 octroi, royalty, sales tax (VAT) etc. Horticulture DSR DAR 2016

Supply and stacking of Vernonia elaegnifolia (curtain creeper) plant Nos - 25.00 -
of height 30 cm to 45 cm. in 20 cm size of Earthen pots / Plastic As per Item 9.14 , MCGM
79 pots & as per direction of the officer-in-charge. Horticulture DSR DAR 2017
Total Amount (G) 1,137,041.75
H CCTV Camera
Supply of Galvanised Iron Class B Traffic Signal straight pole of 6 NOS 4.00 14,369.00 57,476.00
80 mtr height as per Specification MCGM-R2-RT-ATC 4.1
Supply of Outdoor PTZ Infrared IP High Definition camera, Image
sensor : 1/2.8" Progressive Scan CCD/CMOS, Video resolution: FHD
1920x1080, Lens : 30 X (4.3-129 mm or better), min. illumination:
0.3 lux for color and 0.01 lux for B/W, viedo compression: NOS 8.00 172,863.00 1,382,904.00
H.264/MPEG-4, Motion JPEG, SNR >50 dB, IP v4/ v6 network,
Housing : Vandal Proof, IP 66, Rugged, wide dynamic range > 80 dB,
PAN: 360 deg. , Tilt: min 180 deg., Zoom: min 30x optical & 12x
digital; Embedded comprehensive Intelligent Video Analytic with
Up to 40 zones (multi-segment polygons and lines) 60 VCA filter
rules in total should include minimum filters like Object: Enter, Exit,
Appear, Disappear, Stop, Direction, AutoTrack Dwell, Speed,
Unauthorized Access,Counting Line, Color Filter, Object
Classification, Logical Rules; PTZ Object Autotracking, fit with
81 VCAfollow; MCGM-R2-RT-ATC 11.1

Server for CCTV HP ProLiant DL380p Gen8 (1) Intel® Xeon® E5-2643
(3.3GHz/ 4-core/10MB/8 GT-s QPI/130 W) Processor/ 10MB
(1x10MB) Level 3/ 16 GB RAM PC3L-10600R (DDR3-1333) NOS 1.00 871,847.00 871,847.00
Registered DIMMS/HP Smart Array P420i/ZM (RAID 0/1/1+0)/ 8 SFF
SAS/SATA HDD Bays; includes 6 SFF hard drive blanks/(1) HP 460W
Common Slot Gold Hot Plug Power Supply (92% Efficient)/ 3 Years
24x7 Onsite WarrantyServer for CCTV HP ProLiant DL380p Gen8 (1)
82 Intel® Xeon® E5-2643 MCGM-R2-RT-ATC 10.19
Memory for CCTV - 1 TB SATA 2.5" HDD (Hot swappable) - For NOS 5.00 17,948.00 89,740.00
83 archiver Server MCGM-R2-RT-ATC 10.20

Supply, intsallation of Operator terminal Intel Processor based PC


with i7 processor, 1TB HDD, 16GB RAM, 20.5 inch LED Monitor, 4 NOS 1.00 118,144.00 118,144.00
GB graphic card with NVIDA facility, with the Licencse copy of
84 operating System, Mocrosoft office. MCGM-R2-RT-ATC 10.23

Supply of single 63 mm (OD)/ 47 mm (ID) double walled corrugated RMT 400.00 91.00 36,400.00
High Density Poly Ethylene (HDPE) Pipes conforming to the IS
85 14930 (Part-II) including supply of necessary sockets, couplings etc. MCGM-R2-RT-NATC 3.3

Laying 63 mm (OD)/47 mm (ID) double walled corrugated High


Density Poly Ethylene (HDPE) Pipes including pull wire along with RMT 400.00 8.00 3,200.00
necessary sockets, couplings etc. as per drawing no. RT-NATC-3.2A
86 & RT-NATC-3.2B MCGM-R2-RT-NATC 3.4
87 Supply of CAT-6 cable for CCTV application armoured RMT 2,000.00 30.00 60,000.00 MCGM-R2-RT-ATC 7.9

Laying of signal cables (all types including communication cables


with multi pairs as described above) in trenches, existing ducts / RMT 2,000.00 38.00 76,000.00
G.I. Pipes including ferruling, testing etc. but excluding any cable
88 joint, excavation etc. MCGM-R2-RT-ATC 7.14
Total Amount (H) 2,695,711.00
I Electrical Works
Excavation and dismantling of structures on roadway,shifting and
relocating of essential utilities,streetpoles,signals,road sign boards
including taking necessary permission from the service
providers/authorities including payment of necessary deposit sand
supervision charges,shifting charges etc.complete as directed
byEngineer-in-charge. a) Street Pole NOS 123.00 1229.00 151,167.00 MCGM-M&E-USOR-2018-R2-RW-7-
29

89
Excavating the trenches and refilling,reinstatement of the same
after the cable is laid in approved manner (750mm deep, 600 mm
wide),in all types of soils 1 Cu. Mtr. = 2.2 RMT. CUM 916.99 307.00 281,515.16 MCGM-M&E-USOR-2018-R2-ME-2-8

90
Supply & Laying of double wall corrugated ( DWC) pipes of HDPE
for underground cable protection as per IS 14930 Part II. With
necessary connecting socket/couplings, tees of some material at
required
depth up to 900 mm below road ground surface. backfilling of with RMT 612.00 382.00 233,784.00 MCGM-M&E-USOR-2018-R2-ME-2-
22-d
light ramming is included in the scope.
(d) 90 mm OD / 76 mm I.D.

91
Cables : Supply & laying " XLPE cables" on walls or through existing
trenches etc. (SP-ME-TS- 6)
LV Cables of following sizes to be laid buried in ground/laid in cable
trays in ready made trenches, cables shall be fitted on wall / ceiling
by the means of saddle & spacers. Miscellaneous items such as
cable dressing accessories like nylon tie, Aluminium clamps, GI
cleats, cable tags etc. are included in the scope. Removal of empty MCGM-M&E-USOR-2018-R2-ME-2
drums, cartoons and making the site normal as instructed by
Purchaser client is included in scope.

92
1.1 kV grade stranded Al conductor, XLPE insulated, extruded PVC
inner and FRLS outer sheathed, galvanised steel round or strip
armoured cables. RMT 2,445.30 250.00 611,325.00 R2-ME-2-1-t
(t) 4C x 25 Sq.mm
(a)
Galvanised Octagonal Poles - Design, engineering, manufacture,
testing at factory, packing & forwarding, delivery to site, unloading
and handling at site, assembly, installation, testing and
commissioning of Octagonal street light poles with embeded
junction box inclusive of terminals, 3Cx 2.5 sqmm PVC insulated MCGM-M&E-USOR-2018-R2-ME-10
multistranded flexible copper cable from Junction box to the
luminaires, termination at both ends and other accessories.
Foundation for the pole erection and all civil works shall be in the
scope of the contractor.

93
Providing & erecting 5 m high (clear height) galvanized
OCTAGONAL pole with foundation bolts having bottom of 130 mm
A/F, top 70 mm A/F on provided foundation as per specification NOS 20.00 40981.00 819,620.00 R2-ME-10-5-c

(a)
Providing & erecting 9 m high (clear height) galvanized
OCTAGONAL pole with foundation bolts having bottom of 130 mm
A/F, top 70 mm A/F on provided foundation as per specification NOS 37.00 78928.00 2,920,336.00 R2-ME-10-5-g

(b)
Providing & erecting double arm standard bracket 1500MM long
made up of 40 NB GI pipe suitable for octagonal pole of having top NOS 143.00 14269.00 2,040,467.00 R2-ME-10-6-d
dia 70 MM as per specification
94
Making M- 20 grade reinforced cement concrete foundation by
considering the safe soil bearing capacity at site as 10 T/sq.m at 1.5
m depth including supply of steel, concrete, excavation and fixing
provided nut bolts with the help of template, duly plastered as per Each 143.00 4874.24 697,016.32 As per PWD-SR-2018-19
design complete (for 9m & 10m high octagonal /conical GI pole).

95
96 Fixing existing poles with refubrishment Poles 9 m Height Each 87.00 1790.88 155,806.56 As per PWD-SR-2018-19
LED LIGHT FIXTURES (SP-ME-TS-21a) MCGM-M&E-USOR-2018-R2-ME-4-
LED Street Light fittings 27
97
(a) 100-120 W NOS 123.00 9182.00 1,129,386.00 R2-ME-4-27-f
(b) 70-90 W NOS 163.00 5774.00 941,162.00 R2-ME-4-27-e
Providing pipe type earthing with 40mm. dia. G.l. pipe or 20 mm
dia. G.l. Rod complete with all materials as per specification No. EA- Each 143.00 1398.88 200,039.84 As per PWD-SR-2018-19
EP
98
Total Amount (I) 10,181,624.88
J Miscellaneous

Providing and erecting 2.00 metre high temporary barricading at


site as per drawing/ direction of Engineer-in-Charge which includes
writing and painting, arrangement for traffic diversion such as
traffic signals during construction at site for day and night, glow RMT 1,956.24 1,577.10 3,085,186.10
lamps, reflective signs, marking, flags, caution tape as directed by
the Engineer-in- Charge. The barricading provided shall be retained
in position at site continuously i/c shifting of barricading from one
location to another location as many times as required during the
execution of the entire work till its completion. Rate include its
maintenance for damages, painting, all incidentals, labour
materials, equipments and works required to execute the job. The
barricading shall not be removed without prior approval of
Engineer-in- Charge. (Note :- One time payment shall be made for
providing barricading from start of work till completion of work i/c
shifting. The barricading provided shall remain to be the property CPWD (16.81 &
99 of the contractor on completion of the work). Pg 279)

Providing labour for traffic regulation (Management for traffic


safety during construction) complete and as directed by Engineer- NOS 2,340.00 470.40 1,100,736.00 As per relevant
100 incharge. PWD/MCGM/CPWD rates

Providing and applying external raincoat painting with crack filling


acrylic polymer based chemical compound coating to the external
surface of walls to prevent water seepage in the masonry walls
during monsoon added with required shade Steiner to give SQM 2,760.56 257.64 711,230.68
required shade to the surface in two coats. Including providing
three coat of priming of polymer base primer including preparing
surface scrapping the existing loose old paint, removing loose
particles of sand on the surface opening and cleaning the cracks
developed in the external plaster, removing loose particles by
chiseling, filling cracks by chemicals compound of approved make
with proper penetration etc. Coating of Raincoat with the help of
brush and as per instructions and specification given by
manufacturer and with instruction from Engineer in-charge. Work
shall be executed by certified applicator only and covering
gurantee of 3 years on court stamp paper of Rs. 500/- and
101 necessary testing etc. complete. PWD-35.29-BDO
Pergola- providing and fixing 6”x6” MS square pipe for piller; 6”x4”
MS square pipe for rafter; 4”x4” MS square pipe for cross support;
providing foundation with concrete; providing and applying a coat SQM 0 5,627.29 -
of red oxide and finish with two coat of epoxy paint on external
surface of pipe.
102
Total Amount (J) 4,897,152.78
Total Cost (A+B+C+D+E+F+G+H+I+J) 98,499,385.04
Excavation for road way in earth ,soil of all sorts, sand, gravel or soft murum including Statement C1 page 488&489 of SSR For excavated
8 dressing section to there rquired grade, camber and side slopes and conveying the excavated Earthwork Rate inclusive of loading + unloading and
materials with all lift upto a lead of 50m. and spreading for embankment or stacking By transport
Manual Means. (with prior permission of S.E.)
For 40 km lead
Basic Rate 216.00 Rs/cum Rate for 500 m 150.26
Item No. 2.10, SSR 2018-19,page 29 Rate for 1000 m 156.71
Add extra lead 40km as derived 502.02 Rs/cum Hence transport charges for 500 m 6.45
Add for corporation area 5% as per ii ) page 1 35.90 Rs/cum Loading +unloading 500 m ( 150.26-6.45) 143.81
Add insurance cost as per i ) page 6- 0.50% 3.77 Rs/cum Transport for 50 m = 6.45*50/500 0.645
Total 757.69 Rs/cum So rate for 50m will be = 143.81+.645 144.46
Add for GST @12% as per iv) a) page 3 90.92 Rs/cum Rate for 40km page 49 C1 statement 562.81
Total rate to be considered 848.61 Rs/cum Hence extra amount = (562.81-144.46) 418.35
Compacted density 1.2 502.02

9 Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 Transportation of excavated material /debris
metres, stacking serviceable and unserviceable materials separately etc. complete. for Rigid and Flexible pavements up to 40km

Basic Rate 323.00 Rs/cum Rate as per C1 for 1.0 km 156.71


Item No. 3.10, SSR 2018-19 page 35 Rate for 40km page 49 C1 statement 562.81
Add extra lead 40km as derived 487.32 Rs/cum Hence extra amount = (562.81-156.71) 406.1
Add for corporation area 5% as per ii ) page 1 40.52 Rs/cum Compacted density 1.2 487.32
Add insurance cost as per i ) page 6- 0.50% 4.25 Rs/cum
Total 855.09 Rs/cum
Add for GST @12% as per iv) a) page 3 102.61 Rs/cum
Total rate to be considered 957.70 Rs/cum

Dismantling of cement concrete pavement by mechanical means using pneumatic tools,


10 breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations
and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and
unserviceable materials separately etc. complete.

Basic Rate 852.00 Rs/cum


Item No. 3.10, SSR 2018-19 page 35
Add extra lead 40km as derived 487.32 Rs/cum
Add for corporation area 5% as per ii ) page 1 66.97 Rs/cum
Add insurance cost as per i ) page 6- 0.50% 7.03 Rs/cum
Total 1413.32 Rs/cum
Add for GST @12% as per iv) a) page 3 169.60 Rs/cum
Total rate to be considered 1582.92 Rs/cum

11 Construction of granular sub-base by providing close graded Material, mixing in a mechanical


mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with
motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the
desired density, complete as per clause 401 -- Plant Mix Method and Grading - I Material

Basic Rate 1521.00 Rs/cum


Item. No.3.01, SSR 2018-19 page 33
Add extra lead 40km as derived viii) e ) page 3: 1.25 den 522.94 Rs/cum
Add for corporation area 5% as per ii ) page 1 102.20 Rs/cum
Add insurance cost as per i ) page 6- 0.50% 10.73 Rs/cum
Total 2156.87 Rs/cum
Add for GST @12% as per iv) a) page 3 258.82 Rs/cum
Total rate to be considered 2415.69 Rs/cum

12 Wet Mix Macadam -- Providing, laying, spreading and compacting graded stone aggregate to
wet mix macadam specification including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with
paver in sub- base / base course on well prepared surface and compacting with vibratory
roller to achieve the desired density. Laying By Grader/Paver.

Basic Rate 1523.00 Rs/cum


Item. No.3.23, SSR 2018-19 page 37
Add extra lead 40km as derived viii) e ) page 3: 1.3 den 543.86 Rs/cum
Add for corporation area 5% as per ii ) page 1 103.34 Rs/cum
Add insurance cost as per i ) page 6- 0.50% 10.85 Rs/cum
Total 2181.05 Rs/cum
Add for GST @12% as per iv) a) page 3 261.73 Rs/cum
Total rate to be considered 2442.78 Rs/cum

Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on
37 Bituminous Surface- Providing and laying of hot applied thermoplastic compound 2.5 mm
thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5mm is
exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level,
uniform and free from streaks and holes.complete.

Basic Rate 566.00 Rs./sqm


PWD-MH-DSR-2018-6.12-(MORTH-803.4) page 60 Rs./sqm
Add for corporation area 5% as per ii ) page 1 28.30 Rs./sqm
Add insurance cost as per i ) page 6- 0.50% 2.97 Rs./sqm
Total 597.27 Rs./sqm
Add for GST @12% as per iv) a) page 3 71.67 Rs./sqm
Total rate to be considered 668.94 Rs./sqm

Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of
polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable
of providing total internal reflection of the light entering the lens face and shall support a load
38 of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of
Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height,
width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum
reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The
strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/-
2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500
Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and
using epoxy resin based adhesive as per manufacturer's recommendation and complete as
directed by the engineer.The contractor shall submit a two year warranty for satisfactory field
performance including stipulated retroreflectance of the reflecting panel, to the Engineer.

Basic Rate 435.00 Rs./No.


PWD-MH-DSR-2018-6.09-(MORTH-804/806) page 60
Add for corporation area 5% as per ii ) page 1 21.75 Rs./No.
Add insurance cost as per i ) page 6- 0.50% 2.28 Rs./No.
Total 459.03 Rs./No.
Add for GST @12% as per iv) a) page 3 55.08 Rs./No.
Total rate to be considered 514.11 Rs./No.

Providing and fixing Mandatory/Regulatory sign boards in circular shape of 600 mm dia made
out of 3mm aluminum composite material ( ACM) sheet bonded with white retro reflective
39 sheeting of Class C ( Type XI Micro prismatic grade sheeting) having pressure sensitive /heat
activated adhesive retoreflective specified back ground, border and back side retoreflctive
symbols, letters, numerals, arrow as per IRC:67- 2012 Table No 8.3 Supported with back
support frame 25mm x 25mm x 3mm, duly painted on back side with grey stove enamel paint
and supported on one no. of M. S. angle iron post of size 65 mm X 65 mm X 6 mm, 3.45 m
long, duly painted with with flat oil paint having alternate black and white bands of 25 cm
width including G.I. fixtures etc; fixing the boards in M25 grade concrete block of size 60cm X
60cm X 75cm including transportation etc; complete. Class C ( Type XI Micro prismatic grade
sheeting) shall have 10 years written warranty from the manufacturer and authorised
distributor/convertor issued for field performance including the screen printed areas and
cutout sheeting and cut-out durable transparent overlay film and this warranty certificate in
original should be submitted to the Engineer in charge by the contractor /supplier.

Basic Rate 4002.00 Rs./No.


PWD-MH-DSR-2018-6.28 (b)-(MORTH-801) page 67
Add for corporation area 5% as per ii ) page 1 200.10 Rs./No.
Add insurance cost as per i ) page 6- 0.50% 21.01 Rs./No.
Total 4223.11 Rs./No.
Add for GST @12% as per iv) a) page 3 506.77 Rs./No.
Total rate to be considered 4729.88 Rs./No.

Providing and fixing Cautionary/Warning sign boards in Equilateral Triangle size of 900 mm
made out of 4mm aluminum composite material ( ACM) sheet bonded with white retro
reflective sheeting of Class C ( Type XI Micro prismatic grade sheeting) having pressure
40 sensitive /heat activated adhesive retoreflective specified back ground, border and back side
retoreflctive symbols, letters, numerals, arrow as per IRC:67-2012 Table No 8.3 Supported
with back support frame 25mm x 25mm x 3mm, duly painted on back side with grey stove
enamel paint and supported on one no. of M. S. angle iron post of size 65 mm X 65 mm X 6
mm, 3.45 m long, duly painted with with flat oil paint having alternate black and white bands
of 25 cm width including G.I. fixtures etc; fixing the boards in M25 grade concrete block of
size 60cm X 60cm X 75cm including transportation etc; complete. Class C ( Type XI Micro
prismatic grade sheeting) shall have 10 years written warranty from the manufacturer and
authorised distributor/convertor issued for field performance including the screen printed
areas and cut-out sheeting and cut-out durable transparent overlay film and this warranty
certificate in original should be submitted to the Engineer in charge by the
contractor/supplier.

Basic Rate 4699.00 Rs./No.


PWD-MH-DSR-2018-6.28 (b)-(MORTH-801) page 70
Add for corporation area 5% as per ii ) page 1 234.95 Rs./No.
Add insurance cost as per i ) page 6- 0.50% 24.67 Rs./No.
Total 4958.62 Rs./No.
Add for GST @12% as per iv) a) page 3 595.03 Rs./No.
Total rate to be considered 5553.65 Rs./No.
Providing and fixing of retro- reflectorised informatory sign board ectangular/Square in shape
having area less than 0.9 square meter made out of 4mm aluminum sheet bonded with white
retro reflective sheeting of Class B ( Type IV High intensity micro-prismatic grade sheeting-
41 HIP) having pressure sensitive/heat activated adhesive retoreflective specified back ground,
border and back side retoreflctive symbols, letters, numerals, arrow as per IRC:67-2012 Table
No 8.3, supported with back support frame 25mm x 25mm x 3mm, duly painted on back side
with two coats of grey stove enamel paint and supported on one no. mild steel angle iron
post 75 mm x 75 mm x 6 mm, 3.5 mt long firmly fixed to the ground by means of properly
designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below
ground level as per approved drawing The angle iron post shall be duly painted with one coat
of epoxy primer and two coats of epoxy finish paints having alternate black and white bands
of 25 cm width including GI fixures and transportation etc.complete.The nut bolts of board
with angle iron post/supporting structure after fixing at site has to be electrically welded.
Class B ( Type IV High intensity micro-prismatic grade sheeting-HIP) sheeting shall have 7
years written warranty from the manufacturer and authorised distributor/convertor issued
for field
performance.

Basic Rate 7507.00 Rs./No.


PWD-MH-DSR-2018-6.33 (b)-(MORTH-801)page 73
Add for corporation area 5% as per ii ) page 1 375.35 Rs./No.
Add insurance cost as per i ) page 6- 0.50% 39.41 Rs./No.
Total 7921.76 Rs./No.
Add for GST @12% as per iv) a) page 3 950.61 Rs./No.
Total rate to be considered 8872.37 Rs./No.

Providing and laying Cast in situ/Ready Mix cement concrete in M20 of trap/
granite/quartzite/gneiss metal for bed blocks, foundation blocks and such other items
45 including bailing out water, Steel centering, formwork, laying/ pumping, compacting,
roughening them if special finish is to be provided, finishing uneven and honeycombed
surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering
uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag,
plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro
processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix
plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade
finely washed etc)

Basic Rate 5028.00 Rs/cum


Item no. 24.10, SSR 2018-19 page 219
Add extra lead 40km as derived viii) e ) page 3: 1.35 den 564.77 Rs/cum
Add for corporation area 5% as per ii ) page 1 251.40 Rs/cum
Add insurance cost as per i ) page 6- 0.50% 26.40 Rs/cum
Total 5870.57 Rs/cum
Add for GST @12% as per iv) a) page 3 704.47 Rs/cum
Total rate to be considered 6575.04 Rs/cum

46
Providing and laying 125 micron Low Density Polyethylene (LDPE) sheet confirming to IS
3395 : 1997 below concrete pavement including all materials and labour complete.

Basic Rate 19.00 Rs./sqm


Item no. 5.19, SSR 2018-19 page 55 Rs./sqm
Add for corporation area 5% as per ii ) page 1 0.95 Rs./sqm
Add insurance cost as per i ) page 6- 0.50% 0.10 Rs./sqm
Total 20.05 Rs./sqm
Add for GST @12% as per iv) a) page 3 2.41 Rs./sqm
Total rate to be considered 22.46 Rs./sqm

Providing and laying in-situ M40 Grade unreinforced plain cement concrete pavement over a
prepared sub base with 43 grade cement , coarse and fine aggregate ( natural sand/ VSI grade
47 finely washed crushed sand) conforming to IS 383, using fine and coarse aggregates combined
gradation as per Table 600-3 of MORTH Specification 2013, mixed in a batching and mixing
plant/ non tilting mixer and Weigh batcher as per approved mix design, admixtures,
transporting to site, spreading, laying with approved make paver,compacted and finished in a
continuous operation, finishing to lines and grades as directed by Engineer-in-charge and
curing by curing compound /by providing cement vata in cement Mortar 1:8 @0.6m X 0.6m
centre to centre, admeasuring 80 mm at bottom and 40 mm at top with depth of 75mm and
maintaining the same throughout curing period by any other method approved by Engineer-
in-charge.

Basic Rate 5746.00 Rs/cum


Item no. 5.03, SSR 2018-19 page 49
Add extra lead 40km as derived viii) e ) page 3: 1.35 den 564.77 Rs/cum
Add for corporation area 5% as per ii ) page 1 287.30 Rs/cum
Add insurance cost as per i ) page 6- 0.50% 30.17 Rs/cum
Total 6628.24 Rs/cum
Add for GST @12% as per iv) a) page 3 795.39 Rs/cum
Total rate to be considered 7423.63 Rs/cum

48 Prime coat - Providing and applying primer coat with bitumen emulsion on prepared surface
of granular Base including cleaning of road surface and spraying, primer at the rate of 0.60
kg/sqm using mechanical means.

Basic Rate 19.00 Rs./sqm


IItem no 3.29, SSR 2018-19page 38 Rs./sqm
Add for corporation area 5% as per ii ) page 1 0.95 Rs./sqm
Add insurance cost as per i ) page 6- 0.50% 0.10 Rs./sqm
Total 20.05 Rs./sqm
Add for GST @12% as per iv) a) page 3 2.41 Rs./sqm
Total rate to be considered 22.46 Rs./sqm

DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using
49 crushed aggregates of Grading 1, premixed with bituminous binder of specified grade of
Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid
over a previously prepared surface, finished to the required grade, level, alignment, and
rolling to achieve the desired density for 76-100 mm compacted thickness .USING Batch mix
type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-30
bulk bitumen rates are considered to arrive at rates)

Basic Rate 5734.00 Rs/cum


Item no. 3.44, SSR 2018-19 page 42
Add extra lead 40km as derived viii) e ) page 3: 1.3 5den 564.77 Rs/cum
Add for corporation area 5% as per ii ) page 1 314.94 Rs/cum
Add insurance cost as per i ) page 6- 0.50% 33.07 Rs/cum
Total 6646.78 Rs/cum
Add for GST @12% as per iv) a) page 3 797.61 Rs/cum
Total rate to be considered 7444.39 Rs/cum

50 Providing and applying tack coat on the prepared surface heating by fames in Boiler and
spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. (VG-30 bulk bitumen
rates are considered to arrive at rates)

Basic Rate 11.00 Rs./sqm


Item no. 3.31, SSR 2018-19 page 38 Rs./sqm
Add for corporation area 5% as per ii ) page 1 0.55 Rs./sqm
Add insurance cost as per i ) page 6- 0.50% 0.06 Rs./sqm
Total 11.61 Rs./sqm
Add for GST @12% as per iv) a) page 3 1.39 Rs./sqm
Total rate to be considered 13.00 Rs./sqm

BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates
of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and
51 filler, transported to site with VTS , laid over a previously prepared surface, finished to the
required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm
compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For
Bitumen of specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver,
Vibratory roller with Stone Dust filler. (VG-30 bulk bitumen rates are considered to arrive at
rates)

Basic Rate 6003.00 Rs/cum


Item no. 3.48, SSR 2018-19 page 43
Add extra lead 40km as derived viii) e ) page 3: 1.35 den 564.77 Rs/cum
Add for corporation area 5% as per ii ) page 1 328.39 Rs/cum
Add insurance cost as per i ) page 6- 0.50% 34.48 Rs/cum
Total 6930.64 Rs/cum
Add for GST @12% as per iv) a) page 3 831.68 Rs/cum
Total rate to be considered 7762.32 Rs/cum

61 Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement
mortar 1:6 in plinth as backing in composite masonry including bailing out water manually,
striking joints, raking out joints and watering etc Complete.

Basic Rate 4973 Rs/cum


Add for corporation area 5% as per ii ) page 1 248.65 Rs/cum
Add insurance cost as per i ) page 6- 0.50% 26.11 Rs/cum
Total 5247.76 Rs/cum
Add for GST @12% as per iv) a) page 3 629.73 Rs/cum
Total rate to be considered 5877.49 Rs/cum

63 Providing internal cement plaster 25mm thick in two coats in cement mortar 1:4 without
neeru finish, to concrete, brick or stone surfaces, in all positions including scaffolding and
curing etc.complete.
Basic Rate 461 Rs/Sqm
Add for corporation area 5% as per ii ) page 1 23.05 Rs/Sqm
Add insurance cost as per i ) page 6- 0.50% 2.42 Rs/Sqm
Total 486.47 Rs/Sqm
Add for GST @12% as per iv) a) page 3 58.38 Rs/Sqm
Total rate to be considered 544.85 Rs/Sqm

66 Providing and laying M-20 concrete

Basic Rate 4861 Rs/Cum


Add for corporation area 5% as per ii ) page 1 243.05 Rs/Cum
Add insurance cost as per i ) page 6- 0.50% 25.52 Rs/Cum
Total 5129.57 Rs/Cum
Add for GST @12% as per iv) a) page 3 615.55 Rs/Cum
Total rate to be considered 5745.12 Rs/Cum

Making M- 20 grade reinforced cement concrete foundation by considering the safe soil
bearing capacity at site as 10 T/sq.m at 1.5 m depth including supply of steel, concrete,
excavation and fixing provided nut bolts with the help of template, duly plastered as per
95 design complete (for 9m & 10m high octagonal /conical GI pole).

Basic Rate 4352 Rs/Each


Item no. 16-3-10, PWD Electrical CSr 2018-19, Page 244
Add for GST @12% as per 12) page 2 522.24 Rs/Each
Total rate to be considered 4874.24 Rs/Each

96 Fixing existing poles with refubrishment Poles 9 m Height

Basic Rate (Labour rate) 1599 Rs/Each


Item no. 8-3-16, PWD Electrical CSR 2018-19, Page 150
Add for GST @12% as per 12) page 2 191.88 Rs/Each
Total rate to be considered 1790.88 Rs/Each

98 Providing pipe type earthing with 40mm. dia. G.l. pipe or 20 mm dia. G.l. Rod complete with
all materials as per specification No. EA-EP

Basic Rate 1249 Rs/Each


Item no. 9-1-4, PWD Electrical CSR 2018-19, Page 161
Add for GST @12% as per 12) page 2 149.88 Rs/Each
Total rate to be considered 1398.88 Rs/Each

Providing and applying external raincoat painting with crack filling acrylic polymer based
chemical compound coating to the external surface of walls to prevent water seepage in the
101 masonry walls during monsoon added with required shade Steiner to give required shade to
the surface in two coats. Including providing three coat of priming of polymer base primer
including preparing surface scrapping the existing loose old paint, removing loose particles of
sand on the surface opening and cleaning the cracks developed in the external plaster,
removing loose particles by chiseling, filling cracks by chemicals compound of approved make
with proper penetration etc. Coating of Raincoat with the help of brush and as per
instructions and specification given by manufacturer and with instruction from Engineer in-
charge. Work shall be executed by certified applicator only and covering gurantee of 3 years
on court stamp paper of Rs. 500/- and necessary testing etc. complete.

Basic Rate 218.00 Rs./sqm


PWD-35.29-BDO page 283
Add for corporation area 5% as per ii ) page 1 10.90 Rs./sqm
Add insurance cost as per i ) page 6- 0.50% 1.14 Rs./sqm
Total 230.04 Rs./sqm
Add for GST @12% as per iv) a) page 3 27.60 Rs./sqm
Total rate to be considered 257.64 Rs./sqm
All rates are inclusive of GST " PREFACE" cl.no.6.1.2 page IV
CPWD (16.81 &
Pg 279)
Barricading - providing and as such qty should be for construction zone to be carried out in phases.
As such qty will be as per phase requirement and not full qty.
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit


A Excavation and Dismentaling
1 Dismantling of existing masonary structures
(Provisional Quantity) Both sides 50.00 Cum

Total (1) 50.00 Cum

2 Removing existing barbed wire fencing/pipe railing


(Provisional Quantity) 111.53 RMT

Total (2) 111.53 RMT

3 Removing of existing Paver Blocks


C.S. Link Road West 0.90 445.00 4.70 1,882.35 Sqm
C.S. Link Road East 0.90 505.00 4.00 1,818.00 Sqm
Lokmanya Tilak Road Both sides 1.80 355.00 2.70 1,725.30 Sqm
Chandavarkar Road Both sides 1.80 210.00 3.25 1,228.50 Sqm

C.S. Link Road West 0.90 202.00 6.40 1,163.52 Sqm


C.S. Link Road East 0.90 435.00 4.45 1,742.18 Sqm

Total (3) 9,559.85 Sqm

4 Removing Existing Kerb


C.S. Link Road West 0.90 445.00 400.50 RMT
C.S. Link Road East 0.90 505.00 454.50 RMT
Lokmanya Tilak Road Both sides 1.80 355.00 639.00 RMT
Chandavarkar Road Both sides 1.80 210.00 378.00 RMT

C.S. Link Road West 0.90 202.00 181.80 RMT


C.S. Link Road East 0.90 435.00 391.50 RMT

Total (4) 2,445.30 RMT

5 Extra above A10 for every 2 km


(taking 5 times of Kerb stone removing for 10 km extra) 5 2,445.30 12,226.50 RMT

Total (5) 12,226.50 RMT

6 Removing existing water table


C.S. Link Road West 0.90 445.00 400.50 RMT
C.S. Link Road East 0.90 505.00 454.50 RMT
Lokmanya Tilak Road Both sides 1.80 355.00 639.00 RMT
Chandavarkar Road Both sides 1.80 210.00 378.00 RMT

C.S. Link Road West 0.90 202.00 181.80 RMT


C.S. Link Road East 0.90 435.00 391.50 RMT

Total (6) 2,445.30 RMT

7 Extra above A10 for every 2 km


(taking 5 times of water table removing for 10 km extra) 5 2,445.30 12,226.50 RMT

Total (7) 12,226.50 RMT

8 Excavation
C.S. Link Road West 0.90 445.00 3.20 0.50 640.80 Cum
C.S. Link Road East 0.90 505.00 2.50 0.50 568.13 Cum
Lokmanya Tilak Road Both sides 1.80 355.00 1.20 0.50 383.40 Cum
Chandavarkar Road Both sides 1.80 210.00 1.75 0.50 330.75 Cum

C.S. Link Road West 0.90 202.00 5.40 0.50 490.86 Cum
C.S. Link Road East 0.90 435.00 3.45 0.50 675.34 Cum

Auto
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit


C.S. Link Road both side 1.00 30 2.5 0.5 38 Cum
Lokmanya Tilak Road both side 2.00 33.00 2.50 0.5 83 Cum
Chandavarkar Road both side 2.00 30.00 2.50 0.5 75 Cum

C.S. Link Road West 1.00 30 2.5 0.5 38 Cum


C.S. Link Road East 1.00 35 2.80 0.5 49 Cum
Taxi
C.S. Link Road West 1.00 35 3.3 0.5 58 Cum
C.S. Link Road East 1.00 35 3.3 0.5 58 Cum

Bus
C.S. Link Road both side 1.00 50 3.5 0.5 88 Cum

C.S. Link Road West 1.00 50 3.5 0.5 88 Cum

Total (8) 3,661.27 Cum

9 Dismantling of flexible (Aspaltic) pavements and disposal


C.S. Link Road West 0.90 100.00 5.42 0.20 97.56 Cum
C.S. Link Road East 0.90 100.00 7.52 0.20 135.36 Cum
Lokmanya Tilak Road Both sides 1.80 50.00 3.45 0.20 62.10 Cum
Chandavarkar Road Both sides 1.80 50.00 3.20 0.20 57.60 Cum

C.S. Link Road West 0.90 50.00 7.00 0.20 63.00 Cum
C.S. Link Road East 0.90 50.00 3.50 0.20 31.50 Cum

At Junctions 5.00 15.00 3.00 0.20 45.00


Misc 5.00 15.00 3.00 0.20 45.00 Cum

Total (9) 537.12 Cum

10 Dismantling of cement concrete pavement and Disposal


C.S. Link Road West 0.90 50.00 1.50 0.30 20.25 Cum
C.S. Link Road East 0.90 50.00 1.50 0.30 20.25 Cum
Lokmanya Tilak Road Both sides 1.80 20.00 1.00 0.30 10.80 Cum
Chandavarkar Road Both sides 1.80 20.00 1.00 0.30 10.80 Cum

C.S. Link Road West 0.90 50.00 1.50 0.30 20.25 Cum
C.S. Link Road East 0.90 50.00 1.50 0.30 20.25 Cum

Misc 10.00 15.00 3.00 0.30 135.00 Cum

Total (10) 237.60 Cum

B Footpath
11 Embakment

Total (11) - Cum

11a Providing filling & compaction of GSB


C.S. Link Road West 0.90 445.00 3.20 0.15 192.24 Cum
C.S. Link Road East 0.90 505.00 2.50 0.15 170.44 Cum
Lokmanya Tilak Road Both sides 1.80 355.00 1.20 0.15 115.02 Cum
Chandavarkar Road Both sides 1.80 210.00 1.75 0.15 99.23 Cum

C.S. Link Road West 0.90 202.00 5.40 0.15 147.26 Cum
C.S. Link Road East 0.90 435.00 3.45 0.15 202.60 Cum

Auto
C.S. Link Road both side 1.00 30 2.5 0.15 11 Cum
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit


Lokmanya Tilak Road both side 2.00 33.00 2.50 0.15 25 Cum
Chandavarkar Road both side 2.00 30.00 2.50 0.15 23 Cum

C.S. Link Road West 1.00 30 2.5 0.15 11 Cum


C.S. Link Road East 1.00 35 2.80 0.15 15 Cum
Taxi
C.S. Link Road West 1.00 35 3.3 0.15 17 Cum
C.S. Link Road East 1.00 35 3.3 0.15 17 Cum

Bus
C.S. Link Road both side 1.00 50 3.5 0.15 26 Cum

C.S. Link Road West 1.00 50 3.5 0.15 26 Cum

Total (11a) 1,098.38 Cum

12 Providing filling & compaction of WMM


C.S. Link Road West 0.90 445.00 3.20 0.15 192.24 Cum
C.S. Link Road East 0.90 505.00 2.50 0.15 170.44 Cum
Lokmanya Tilak Road Both sides 1.80 355.00 1.20 0.15 115.02 Cum
Chandavarkar Road Both sides 1.80 210.00 1.75 0.15 99.23 Cum

C.S. Link Road West 0.90 202.00 5.40 0.15 147.26 Cum
C.S. Link Road East 0.90 435.00 3.45 0.15 202.60 Cum

Total (12) 926.78 Cum

13 Providing filling & compaction of PCC


C.S. Link Road West 0.90 445.00 3.20 0.10 128.16 Cum
C.S. Link Road East 0.90 505.00 2.50 0.10 113.63 Cum
Lokmanya Tilak Road Both sides 1.80 355.00 1.20 0.10 76.68 Cum
Chandavarkar Road Both sides 1.80 210.00 1.75 0.10 66.15 Cum

C.S. Link Road West 0.90 202.00 5.40 0.10 98.17 Cum
C.S. Link Road East 0.90 435.00 3.45 0.10 135.07 Cum

Auto
C.S. Link Road both side 1.00 30 2.5 0.1 8 Cum
Lokmanya Tilak Road both side 2.00 33.00 2.50 0.1 17 Cum
Chandavarkar Road both side 2.00 30.00 2.50 0.1 15 Cum

C.S. Link Road West 1.00 30 2.5 0.1 8 Cum


C.S. Link Road East 1.00 35 2.80 0.1 10 Cum
Taxi
C.S. Link Road West 1.00 35 3.3 0.1 12 Cum
C.S. Link Road East 1.00 35 3.3 0.1 12 Cum

Bus
C.S. Link Road both side 1.00 50 3.5 0.1 18 Cum
C.S. Link Road West 1.00 50 3.5 0.1 18 Cum

Total (13) 732.25 Cum

14 Providing and Fixing Concrete Blocks


C.S. Link Road West 0.90 445.00 4.70 1,882.35 Sqm
C.S. Link Road East 0.90 505.00 4.00 1,818.00 Sqm
Lokmanya Tilak Road Both sides 1.80 355.00 2.70 1,725.30 Sqm
Chandavarkar Road Both sides 1.80 210.00 3.25 1,228.50 Sqm

C.S. Link Road West 0.90 202.00 6.90 1,254.42 Sqm


C.S. Link Road East 0.90 435.00 4.95 1,937.93 Sqm

Total area for paver Blocks 9,846.50 Sqm


New paver Blocks = (Total area- Refixed paver blocks- Tactile tiles) 7,877.20 Sqm
Total (14) 7,877.20 Sqm
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit

15 Transporting &Refixing exstg good tiles


(10% of Total area for paver blocks) 10% 9,846.50 984.65 Sqm

Total (15) 984.65 Sqm

16 Providing and Fixing Tectile Tiles 300*300*9.80mm


(10% of Total area for paver blocks) 10% 9,846.50 984.65 Sqm

Total (16) 984.65 Sqm

17 Providing and fixing New Kerb Stones


C.S. Link Road West 0.90 445.00 400.50 Rmt
C.S. Link Road East 0.90 505.00 454.50 Rmt
Lokmanya Tilak Road Both sides 1.80 355.00 639.00 Rmt
Chandavarkar Road Both sides 1.80 210.00 378.00 Rmt

C.S. Link Road West 0.90 202.00 181.80 Rmt


C.S. Link Road East 0.90 435.00 391.50 Rmt

Total (17) 2,445.30 RMT

18 Removing and resetting Kerb stone


(Provisional quantity) 100.00 100.00

Total (18) 100.00 RMT

19 Painting of kerb stone


As per Item no. 20 100.00 100.00

Total (19) 100.00 sq.m

20 Providing and fixing New Water table


C.S. Link Road West 0.90 445.00 400.50 Rmt
C.S. Link Road East 0.90 505.00 454.50 Rmt
Lokmanya Tilak Road Both sides 1.80 355.00 639.00 Rmt
Chandavarkar Road Both sides 1.80 210.00 378.00 Rmt

C.S. Link Road West 0.90 202.00 181.80 Rmt


C.S. Link Road East 0.90 435.00 391.50 Rmt

Total (20) 2,445.30 RMT

21 Removing and resetting Water table


(Provisional quantity) 100.00 100.00

Total (21) 100.00 RMT

C Storm Water Drainage


22 Water Entrance of 0.45m x 0.45 m
C.S. Link Road West 40.00 40.00 Nos
C.S. Link Road East 45.00 45.00 Nos

C.S. Link Road West 18.00 18.00 Nos


C.S. Link Road East 39.00 39.00 Nos

Total (22) 142.00 Nos

23 Providing and laying 0.45m X 0.45m hinged type grating and frame ( on road side)
C.S. Link Road West 40.00 40.00 Nos
C.S. Link Road East 45.00 45.00 Nos
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit

C.S. Link Road West 18.00 18.00 Nos


C.S. Link Road East 39.00 39.00 Nos

Total (23) 142.00 Nos

24 Providing and laying R.C.C. Hume pipes with Collar joints 150mm diameter
C.S. Link Road West 40.00 3.20 128.00 Rmt
C.S. Link Road East 45.00 2.50 112.50 Rmt
Lokmanya Tilak Road Both sides 32.00 1.20 38.40 Rmt
Chandavarkar Road Both sides 19.00 1.75 33.25 Rmt

C.S. Link Road West 18.00 5.40 97.20 Rmt


C.S. Link Road East 39.00 3.45 134.55 Rmt

Add 3% for /Islandsetc 3% 312.15 9.36 Rmt

Total (24) 553.26 Rmt

25 Raising of manholes/ chanmbers


(Provisional quantity) 5.00 Nos

Total (25) 5.00 Nos

26 Lowering of manholes/ chambers


(Provisional quantity) 5.00 Nos

Total (26) 5.00 Nos

27 0.90m x 0.45m Resin manhole cover and frame


(Provisional quantity) 10.00 Nos

Total (27) 10.00 Nos

28 Supplying and fixing 0.9m x 0.60m internal size rectangular Resin air-tight hinged type cover and frame
C.S. Link Road West 1.00 40.00 40 Nos
C.S. Link Road East 1.00 45.00 45 Nos
Lokmanya Tilak Road Both sides 2.00 32.00 64 Nos
Chandavarkar Road Both sides 2.00 19.00 38 Nos

C.S. Link Road West 1.00 18.00 18 Nos


C.S. Link Road East 1.00 39.00 39 Nos

Total (28) 244.00 Nos

29 Constructing inspection chember


(Provisional quantity) 1.00 Nos

Total (29) 1.00 Nos

30 Construction of Top slab


(Provisional quantity) 21.00 1.60 0.30 10.08 Cum

Total (30) 10.08 Cum

31 Desilting
(0.05 Cum per manhole) 244.00 0.05 12.20 Cum

Total (31) 12.20 Cum


Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit

D Street Furniture
32 Guard Railing-MS
C.S. Link Road West 0.90 445.00 400.50 Rmt
C.S. Link Road East 0.90 505.00 454.50 Rmt
Lokmanya Tilak Road Both sides 1.80 355.00 639.00 Rmt
Chandavarkar Road Both sides 1.80 210.00 378.00 Rmt

C.S. Link Road West 0.90 202.00 181.80 Rmt


C.S. Link Road East 0.90 435.00 391.50 Rmt

Extra 154.30

Total (32) 2,599.60 Rmt

33 Providing, fabricating and fixing circular SteelBollards of 100mm dia circular Steel Pipe (M.S.circular Bollards)
C.S. Link Road West 54.00 54 Nos
C.S. Link Road East 66.00 66 Nos

C.S. Link Road West 66.00 66 Nos


C.S. Link Road East 60.00 60 Nos

Total (33) 246.00 Nos

34 Providing SS Dust Bin


48.00 Nos

Total (34) 48.00 Nos

35 Providing Standard Benches/or as specified by engineers


46.00 Nos

Total (35) 46.00 Nos

36 Providing and Fixing Bus shelters


C.S. Link Road both side 1.00 1.00 Nos

C.S. Link Road both side 1.00 1.00 Nos

Total (36) 2.00 Nos

E Signages and Road Markings


37 Painting Line, Dashes, Arrows etc on Road
C.S. Link Road West 118.67 Sqm
C.S. Link Road East 134.67 Sqm
Lokmanya Tilak Road Both sides 165.67 Sqm
Chandavarkar Road Both sides 98.00 Sqm

C.S. Link Road West 53.87 Sqm


C.S. Link Road East 116.00 Sqm

Zebra crossing 110.00 Sqm


Add for markings at Junctions/Islands//etc 15% 796.87 119.53 Sqm

Total (37) 916.40 Sqm

38 Cat's Eye/ Studs


C.S. Link Road West 396 Nos
C.S. Link Road East 449 Nos
Lokmanya Tilak Road Both sides 473 Nos
Chandavarkar Road Both sides 280 Nos

C.S. Link Road West 180 Nos


C.S. Link Road East 387 Nos
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit

Total (38) 2,165.00 Nos

39 Mandatory Signs
(Provisional quantity) Both sides - - - 25.00 Nos

Total (39) 25.00 Nos

40 Cautionary Signs
(Provisional quantity) Both sides - - - 25.00 Nos

Total (40) 25.00 Nos

41 Informatory Signs
(Provisional quantity) Both sides - - - 25.00 Sqm

Total (41) 25.00 Sqm

42 Wayfinding Signs
(Provisional quantity) Both sides - - - 1.00 Nos

Total (42) 1.00 Nos

43 Street Name
(Provisional quantity) 8.00 Nos

Total (43) 8.00 Nos

44 Junction name
(Provisional quantity) 8.00 Nos

Total (44) 8.00 Nos

F Road Repair Works


45 Providing and laying M20 PCC for misc works
C.S. Link Road West 2.00 3.00 3.50 0.10 2.10 Cum
C.S. Link Road East 2.00 3.00 3.50 0.10 2.10 Cum
Lokmanya Tilak Road Both sides 3.00 1.50 3.50 0.10 1.58 Cum
Chandavarkar Road Both sides 3.00 1.50 3.50 0.10 1.58 Cum

C.S. Link Road West 1.00 3.00 2.00 0.10 0.60 Cum
C.S. Link Road East 1.00 3.00 2.00 0.10 0.60 Cum

Total (45) 8.55 Cum

46 Providing filling & compaction of LDPE sheet


(Provisional quantity) 532.00 Sqm

Total (46) 532.00 Sqm

47 Providing, laying & compaction PQC M40


C.S. Link Road West 1.00 25.00 3.50 0.30 26.25 Cum
C.S. Link Road East 1.00 25.00 3.50 0.30 26.25 Cum
Lokmanya Tilak Road Both sides 1.00 15.00 3.50 0.30 15.75 Cum
Chandavarkar Road Both sides 1.00 15.00 3.50 0.30 15.75 Cum

C.S. Link Road West 1.00 25.00 6.92 0.30 51.90 Cum
C.S. Link Road East 1.00 25.00 4.95 0.30 37.13 Cum

At Junctions 0.90 15.00 7.00 0.30 28.35 Cum

Auto
C.S. Link Road both side 1.00 30 2.5 0.3 23 Cum
Lokmanya Tilak Road both side 2.00 33.00 2.50 0.3 50 Cum
Chandavarkar Road both side 2.00 30.00 2.50 0.3 45 Cum

C.S. Link Road West 1.00 30 2.5 0.3 23 Cum


Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit


C.S. Link Road East 1.00 35 2.80 0.3 29 Cum
Taxi
C.S. Link Road West 1.00 35 3.3 0.3 35 Cum
C.S. Link Road East 1.00 35 3.3 0.3 35 Cum

Bus
C.S. Link Road both side 1.00 50 3.5 0.3 53 Cum

C.S. Link Road West 1.00 50 3.5 0.3 53 Cum

Total (47) 544.58 Cum

48 Providing and laying Asphaltic/ bitum layers at junctions and roads sides (prime coat)
C.S. Link Road West 5.00 10 3.50 175.00 Sqm
C.S. Link Road East 5.00 10 3.50 175.00 Sqm
Lokmanya Tilak Road Both sides 2.00 10 3.50 70.00 Sqm
Chandavarkar Road Both sides 2.00 10 3.50 70.00 Sqm

Total (48) 490.00 Sqm

49 DBM
C.S. Link Road West 5.00 10 3.50 0.15 26.25 Cum
C.S. Link Road East 5.00 10 3.50 0.15 26.25 Cum
Lokmanya Tilak Road Both sides 2.00 10 3.50 0.15 10.50 Cum
Chandavarkar Road Both sides 2.00 10 3.50 0.15 10.50 Cum

Total (49) 73.50 Cum

50 Providing and laying Asphaltic/ bitum layers at junctions and roads sides (Tack coat)
C.S. Link Road West 5.00 10 3.50 175.00 Sqm
C.S. Link Road East 5.00 10 3.50 175.00 Sqm
Lokmanya Tilak Road Both sides 2.00 10 3.50 70.00 Sqm
Chandavarkar Road Both sides 2.00 10 3.50 70.00 Sqm

Total (50) 490.00 Sqm

51 BC
C.S. Link Road West 5.00 10 3.50 0.15 26.25 Cum
C.S. Link Road East 5.00 10 3.50 0.15 26.25 Cum
Lokmanya Tilak Road Both sides 2.00 10 3.50 0.15 10.50 Cum
Chandavarkar Road Both sides 2.00 10 3.50 0.15 10.50 Cum

Total (51) 73.50 Cum

52 Filling Pot-holes and Patch Repairs with Bituminous concrete


(Provisional Quantity) 2.00 50.00 2.00 - 200.00 Sqm

Total (52) 200.00 Sqm

G Landscaping
53 Excavation for Hedges/Flowers

Total (53) - Sqm

54 Planting Hedges/Flowers
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit

Total (54) - Sqm

55 Supplying of shrubs etc.

Total (55) - Nos

56 Providing and fixing of the precast TREE GUARD KERB


(Provisional Quantity) 125.00 RMT

Total (56) 125.00 RMT

57 Providing and fixing 30 mm thk FRP gratting

Total (57) - Sqm

58 (a) Excavation for tree Transplanting- Girth 0.15 m

Total (58 (a)) - Nos

58 (b) Excavation for tree Transplanting- Girth 0.3 m

Total (58 (b)) - Nos

58 (c) Excavation for tree Transplanting- Girth 0.6 m or more

Total (58 (c)) - Nos

59 Excavation for planting of transplanted tree

Total (59) - Nos

60 Transplanting of trees

Total (60) - Nos

61 Burnt brick masonry

Total (61) - Cum

62 Steel reinforcement

Total (62) - kg

63 Plaster

Total (63) - Sqm

64 Granite Tiles

Total (64) - Sqm

65 Structural steel

Total (65) - kg

66 M 20 concrete

Total (66) - Cum

67 Excavation for raising Lawn on Hard surface


Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit


C.S. Link Road West 220.00 1.50 330.00 Sqm
C.S. Link Road East 206.00 1.75 360.50 Sqm
Lokmanya Tilak Road Both sides 222.00 1.00 222.00 Sqm

C.S. Link Road West 160.00 0.70 112.00 Sqm


C.S. Link Road East 225.00 0.70 157.50 Sqm

Total (67) 1,182.00 Sqm

68 Excavation for planting Shrub


C.S. Link Road West 316.67 0.60 0.60 114 Sqm
C.S. Link Road East 225.00 0.60 0.60 81 Sqm
Lokmanya Tilak Road Both sides 375.00 0.60 0.60 135 Sqm

C.S. Link Road West 266.67 0.60 0.60 96 Sqm


C.S. Link Road East 375.00 0.60 0.60 135 Sqm

Total (68) 561.00 Sqm

69 Excavation for planting Creepers/Climbers

Total (69) - Cum

70 Excavating the ground for planting individual Tree


C.S. Link Road West 13.00 13.00 Nos
C.S. Link Road East 30.00 30.00 Nos

C.S. Link Road West 35.00 35.00 Nos


C.S. Link Road East - Nos

Total (70) 78.00 Nos

71 Planting Doob grass at 50mm c/c and Providing and filling Red Hill Earth
C.S. Link Road West 220.00 1.50 330.00 Sqm
C.S. Link Road East 206.00 1.75 360.50 Sqm
Lokmanya Tilak Road Both sides 222.00 1.00 222.00
Chandavarkar Road Both sides -

C.S. Link Road West 160.00 0.70 112.00 Sqm


C.S. Link Road East 225.00 0.70 157.50 Sqm

Total (71) 1,182.00 Sqm

72 Planting Shrubs on Soft/Hard surface


C.S. Link Road West 316.67 0.60 0.60 114 Sqm
C.S. Link Road East 225.00 0.60 0.60 81 Sqm
Lokmanya Tilak Road Both sides 375.00 0.60 0.60 135
Chandavarkar Road Both sides 0.60 0.60 -

C.S. Link Road West 266.67 0.60 0.60 96 Sqm


C.S. Link Road East 375.00 0.60 0.60 135 Sqm
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit

Total (72) 561.00 Sqm

73 Planting Creepers/Climbers on Soft/Hard surface

Total (73) - Sqm

74 Planting Trees on Soft/Hard surface


C.S. Link Road West 13.00 13.00 Nos
C.S. Link Road East 30.00 30.00 Nos

C.S. Link Road West 35.00 35.00 Nos

Total (74) 78.00 Nos

75 Supply and stacking of Nauclea cadamba (Kadam)


C.S. Link Road West 7.00 7.00 Nos
C.S. Link Road East 15.00 15.00 Nos

C.S. Link Road West 18.00 18.00 Nos

Total (75) 40.00 Nos

76 Supply and stacking of Tabebuia


C.S. Link Road West 6.00 6.00 Nos
C.S. Link Road East 14.00 14.00 Nos

C.S. Link Road West 18.00 18.00 Nos

Total (76) 38.00 Nos

77 Supply and stacking of plant Bauhinia acuminata


C.S. Link Road West 155.00 155.00 Nos
C.S. Link Road East 112.00 112.00 Nos
Lokmanya Tilak Road Both sides 190.00 190.00 Nos
Chandavarkar Road Both sides -

C.S. Link Road West 123.00 123.00 Nos


C.S. Link Road East 175.00 175.00 Nos

Total (77) 755.00 Nos

78 Supply and stacking of plant Murraya Koenigii spreng (Kadipatta/meetha neem)


C.S. Link Road West 155.00 155.00 Nos
C.S. Link Road East 112.00 112.00 Nos
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit


Lokmanya Tilak Road Both sides 190.00 190.00 Nos
Chandavarkar Road Both sides -

C.S. Link Road West 123.00 123.00 Nos


C.S. Link Road East 175.00 175.00 Nos

Total (78) 755.00 Nos

79 Supply and stacking of Vernonia elaegnifolia (curtain creeper)

Total (79) - Nos

H CCTV Camera
80 Traffic Signal Pole
4.00

Total (80) 4.00 Nos

81 CCTV Camera
8.00

Total (81) 8.00 Nos

82 Server
1.00

Total (82) 1.00 Nos

83 Memory
5.00

Total (83) 5.00 Nos

84 Computer
1.00

Total (84) 1.00 Nos

85 Supply of HDPE Pipe


400.00

Total (85) 400.00 Rmt

86 Laying of HDPE Pipe


400.00

Total (86) 400.00 Rmt

87 CAT-6 Cable for CCTV


2,000.00

Total (87) 2,000.00 Rmt

88 Laying of signal cable


2,000.00

Total (88) 2,000.00 Rmt


I Electrical Works
89 Dismentling of Civil Foundation for light poles
C.S. Link Road West 22.00 20 Nos
C.S. Link Road East 25.00 23 Nos
Lokmanya Tilak Road Both sides 36.00 32 Nos
Chandavarkar Road Both sides 21.00 19 Nos

C.S. Link Road West 10.00 9 Nos


Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit


C.S. Link Road East 22.00 20 Nos

Total (89) 123.00 Nos

90 Excavation for trenches


C.S. Link Road West 1.00 445.00 0.50 0.75 150.19 cum
C.S. Link Road East 1.00 505.00 0.50 0.75 170.44 cum
Lokmanya Tilak Road Both sides 2.00 355.00 0.50 0.75 239.63 cum
Chandavarkar Road Both sides 2.00 210.00 0.50 0.75 141.75 cum

C.S. Link Road West 1.00 202.00 0.50 0.75 68.18 cum
C.S. Link Road East 1.00 435.00 0.50 0.75 146.81 cum

Total (90) 916.99 Cum

91 HDEP Pipes (50mm Dia) for poles and DBs


C.S. Link Road West 22.00 5.00 99 Rmt
C.S. Link Road East 25.00 5.00 113 Rmt
Lokmanya Tilak Road Both sides 36.00 5.00 162 Rmt
Chandavarkar Road Both sides 21.00 5.00 95 Rmt

C.S. Link Road West 10.00 5.00 45 Rmt


C.S. Link Road East 22.00 5.00 99 Rmt

Total (91) 612.00 Rmt

92 (a) Laying and fixing Cable along the footpath


C.S. Link Road West 1.00 445.00 400.50 Rmt
C.S. Link Road East 1.00 505.00 454.50 Rmt
Lokmanya Tilak Road Both sides 2.00 355.00 639.00 Rmt
Chandavarkar Road Both sides 2.00 210.00 378.00 Rmt

C.S. Link Road West 1.00 202.00 181.80 Rmt


C.S. Link Road East 1.00 435.00 391.50 Rmt

Total (92 (a)) 2,445.30 Rmt

93 (a) Providing and erecting new Poles 5 m Height


C.S. Link Road West 10 10.00 Nos
C.S. Link Road East 10 10.00 Nos

Total (93 (a)) 20.00 Nos

93 (b) Providing and erecting new Poles 9 m Height


Lokmanya Tilak Road Both sides 11.00 10 Nos
Chandavarkar Road Both sides 6.00 5 Nos

C.S. Link Road West 7.00 6 Nos


C.S. Link Road East 8.00 7 Nos

C.S. Link Road West 3.00 3 Nos


C.S. Link Road East 7.00 6 Nos

Total (93 (b)) 37.00 Nos

94 Providing and erecting Double arm standard bracket


C.S. Link Road West 22.00 20 Nos
C.S. Link Road East 25.00 23 Nos
Lokmanya Tilak Road Both sides 36.00 32 Nos
Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit


Chandavarkar Road Both sides 21.00 19 Nos

C.S. Link Road West 10.00 9 Nos


C.S. Link Road East 22.00 20 Nos

5 m Pole
C.S. Link Road West 10 10.00 Nos
C.S. Link Road East 10 10.00 Nos

Total (94) 143.00 Nos

95 Civil Foundation for light poles


C.S. Link Road West 22.00 20 Nos
C.S. Link Road East 25.00 23 Nos

C.S. Link Road West 10.00 9 Nos


C.S. Link Road East 22.00 20 Nos

Lokmanya Tilak Road Both sides 36.00 32 Nos


Chandavarkar Road Both sides 21.00 19 Nos

5 m Pole
C.S. Link Road West 10 10.00 Nos
C.S. Link Road East 10 10.00 Nos

Total (95) 143.00 Nos

96 Fixing existing poles with refubrishment Poles


C.S. Link Road West 16.00 14 Nos
C.S. Link Road East 18.00 16 Nos

C.S. Link Road West 7.00 6 Nos


C.S. Link Road East 15.00 14 Nos

Lokmanya Tilak Road Both sides 25.00 23 Nos


Chandavarkar Road Both sides 15.00 14 Nos

Total (96) 87.00 Nos

97 (a) Providing and fixing LED fixtures 100-120W


C.S. Link Road West 22.00 20 Nos
C.S. Link Road East 25.00 23 Nos
Lokmanya Tilak Road Both sides 36.00 32 Nos
Chandavarkar Road Both sides 21.00 19 Nos

C.S. Link Road West 10.00 9 Nos


C.S. Link Road East 22.00 20 Nos

Total (97 (a)) 123.00 Nos

97 (b) Providing and fixing LED fixtures 70-90W


C.S. Link Road West 22.00 20 Nos
C.S. Link Road East 25.00 23 Nos
Lokmanya Tilak Road Both sides 36.00 32 Nos
Chandavarkar Road Both sides 21.00 19 Nos

C.S. Link Road West 10.00 9 Nos


C.S. Link Road East 22.00 20 Nos
5 m Pole
C.S. Link Road West 20.00 20 Nos
C.S. Link Road East 20.00 20 Nos

Total (97 (b)) 163.00 Nos

98 Providing and fixing Earthing rodes


Implementation of Multi-Modal Integration Facilities at Metro Stations (Line – 2A)
BILL OF QUANTITIES (BOQ)- Measurement Sheet- Borivali (West)

Sr No. Description Side Numbers Length Breadth Depth Quantity Unit


C.S. Link Road West 22.00 20 Nos
C.S. Link Road East 25.00 23 Nos
Lokmanya Tilak Road Both sides 36.00 32 Nos
Chandavarkar Road Both sides 21.00 19 Nos

C.S. Link Road West 10.00 9 Nos


C.S. Link Road East 22.00 20 Nos
5 m Pole
C.S. Link Road West 10 10.00 Nos
C.S. Link Road East 10 10.00 Nos

Total (98) 143.00 Nos

J Miscellaneous
99 Temp. bericading
C.S. Link Road West 0.90 445.00 320.40 Rmt
C.S. Link Road East 0.90 505.00 363.60 Rmt
Lokmanya Tilak Road Both sides 1.80 355.00 511.20 Rmt
Chandavarkar Road Both sides 1.80 210.00 302.40 Rmt

C.S. Link Road West 0.90 202.00 145.44 Rmt


C.S. Link Road East 0.90 435.00 313.20 Rmt

Total (99) 1,956.24 Rmt

100 Traffic warden


2,340.00 Nos

Total (100) 2,340.00 Nos

101 Providing and painting asthetic painting


C.S. Link Road West 1.00 445.00 0.80 356.00 Sqm
C.S. Link Road East 1.00 505.00 0.80 404.00 Sqm
Lokmanya Tilak Road Both sides 2.00 355.00 0.80 568.00 Sqm
Chandavarkar Road Both sides 2.00 210.00 0.80 336.00 Sqm

Juntions traffic islands and other areas 7.00 20.00 1.20 168.00 Sqm
add 10% for other facilities 10% 1,832.00 0.80 183.20 Sqm

C.S. Link Road


West 1.00 202.00 0.80 161.60 Sqm
C.S. Link Road East 1.00 435.00 0.80 348.00 Sqm

Juntions traffic islands and other areas 7.00 20.00 1.20 168.00 Sqm
add 10% for other facilities 10% 677.60 0.80 67.76 Sqm

Total (101) 2,760.56 Sqm

102 Pergolas
Sqm

Total (102) - Sqm


Statement C1 page 488&489 of SSR
For excavated Earthwork
Rate inclusive of loading + unloading and transport
For 40 km lead
Rate for 500 m 150.26
Rate for 1000 m 156.71
Hence transport charges for 500 m 6.45
Loading +unloading 500 m ( 150.26-6.45) 143.81
Transport for 50 m = 6.45*50/500 0.645
So rate for 50m will be = 143.81+.645 144.46
Rate for 40km page 49 C1 statement 562.81
Hence extra amount = (562.81-144.46) 418.35
Compacted density 1.2 502.02

For Dismentaled Rigid and Flexible pavement

For 1km Transportation of excavated material /debris


for Rigid and Flexible pavements up to 40km
Rate as per C1 156.71
Rate for 40km page 49 C1 statement 562.81
Hence extra amount = (562.81-156.71) 406.1
Compacted density 1.2 487.32