QUANTITY PLANNED AND EXECUTED.

Planned / Percentage Achieved Difference in


Sl No Sl No Achieved Structure Description Section Unit Date Number Length Breadth Height Total Net Total Achieved Planned Dates Dates Dates Remarks

Columns below grade SSL = +4.10,


1 1.5.a Planned SGR C1 cum 4 0.400 0.700 1.200 1.344 28/01/2020 -43858 PCC bottom =
slab
+1.55
Columns below grade
2 1.5.b Planned SGR C2 cum 1 0.350 0.350 1.200 0.147 28/01/2020
slab
Columns below grade
3 1.5.c Planned SGR C3 cum 2 0.400 0.800 1.750 1.120 27.547 28/01/2020
slab
4 1.5.d Planned SGR Cable trench walls Along Grid C cum 1 5.300 0.280 1.900 2.820 28/01/2020
4 1.5.e Planned SGR Cable trench walls Along Grid A1 cum 1 5.600 0.300 1.900 3.192 28/01/2020
Between A1 and
4 1.5.f Planned SGR Cable trench walls cum 2 4.300 0.300 1.900 4.902 28/01/2020
C
4 1.5.g Planned SGR Cable trench walls Alond Grid 1,2 cum 2 12.300 0.300 1.900 14.022 28/01/2020
As buiit drawing coordinates Coordinates from Site Differences
Sl No Station Remarks
Easting Northing Easting Northing X difference Y difference Aligned Difference

1 AVC 01 747543.71 2668502.83 747543.731 2668502.838 -0.021000000066 -0.007999999914 0.022

2 FMC 02 747543.256 2668491.912 747543.848 2668490.625 -0.591999999946 1.287000000011 1.417


''' 747549.566 2668494.55 747549.904 2668493.136 -0.337999999989 1.413999999873 1.454
''' 747551.628 2668489.618 747551.784 2668488.653 -0.155999999959 0.964999999851 0.978
''' 747545.317 2668486.98 747545.711 2668486.126 -0.393999999971 0.853999999817 0.941

3 T1200 S tank Outlet 01 747548.317 2668425.423 747548.39 2668425.407 -0.072999999975 0.015999999829 0.075
Outlet 2 747564.392 2668407.696 747564.897 2668408.629 -0.505000000005 -0.933000000194 1.061

4 T14200 S tank Outlet 01 747605.984 2668305.862 747606.129 2668306.62 -0.144999999902 -0.757999999914 0.772

5 Drain chamber line 2 747608.485 2668388.816 747608.235 2668390.617 0.25 -1.800999999978 1.818
''' 747607.918 2668390.204 747607.856 2668391.584 0.061999999918 -1.379999999888 1.381
''' 747606.53 2668389.637 747606.888 2668391.2 -0.358000000007 -1.563000000082 1.603
''' 747607.097 2668388.249 747607.269 2668390.231 -0.17200000002 -1.982000000309 1.989
As buiit drawing coordinates Coordinates from Site Differences
Sl No Station Remarks
Easting Northing Easting Northing X difference Y difference Aligned Difference
6 Pump station 747708.521 2668265.029 747707.899 2668264.776 0.621999999974 0.253000000026 0.671 Point A
''' 747733.514 2668275.097 747733.152 2668275.097 0.361999999965 0 0.362 Point B

Pump station 747735.801 2668269.692 747735.373 2668269.516 0.427999999956 0.175999999978 0.463


''' 747710.756 2668259.561 747710.129 2668259.307 0.627000000095 0.25400000019 0.676

7 Existing Electrical room 747690.297 2668257.412 747689.84 2668257.225 0.457000000053 0.186999999918 0.494
''' 747691.99 2668253.27 747692.581 2668250.408 -0.591000000015 2.862000000197 2.922
''' 747674.864 2668246.273 747675.007 2668243.318 -0.14300000004 2.955000000075 2.958
''' 747672.255 2668252.66 747672.28 2668250.153 -0.025000000023 2.507000000216 2.507

8 Oil Chamber 747671.075 2668243.106 747671.495 2668240.261 -0.420000000042 2.845000000205 2.876


''' 747666.447 2668241.216 747667.988 2668238.844 -1.540999999968 2.371999999974 2.829
''' 747664.556 2668245.844 747666.473 2668242.594 -1.917000000016 3.25 3.773
''' 747669.185 2668247.735 747669.986 2668244.019 -0.800999999978 3.716000000015 3.801

9 BM 2 747651.775 2668183.323 747651.809 2668183.392 -0.033999999985 -0.069000000134 0.077 Closing error


Sl No Description BL start BL finish Start Finish

1 Preparatory works for Construction of RCC Wall of AVC‐1 (#1 & #2) 03‐May‐20 17‐May‐20 10‐May‐20 23‐May‐20
2 IVC1 - ( Over existing 800mm) Excavation works 25‐Feb‐20 12‐Mar‐20 10‐Mar‐20 26‐Mar‐20
3 IVC2‐ ( Over Existing 1200mm) Excavation works 25‐Feb‐20 14‐Mar‐20 10‐Mar‐20 28‐Mar‐20
4 FMC1‐( Over existing 800mm) Excavation works 21‐Apr‐20 30‐Apr‐20 16‐Mar‐20 26‐Mar‐20
5 WC1‐(Line 02) Dewatering works 05‐May‐20 18‐May‐20 25‐Mar‐20 07‐Apr‐20
6 FMC2‐(Line 01) Submission of PTW for Isolation of existing DN 1400 CS pipeline for modification works at FMC‐2 27‐May‐20 27‐May‐20 13‐Jul‐20 14‐Jul‐20
7 800CS‐Submission of Work Permit for Isolation of existing DN 800 Pipeline 22‐Jul‐20 23‐Jul‐20 25‐Jul‐20 25‐Jul‐20
8 1400CS‐Submission of Work permit for Re‐routing of Existing services obstructing NEW DN 1400 CS Pipelines 4‐Feb‐20 0 04‐Feb‐20 11‐Mar‐20 12‐Mar‐20
9 1400CS‐2025 Open‐cut works for exis􀆟ng Road Crossing (Outside Boundary Limit) 04‐Jun‐20 10‐Jun‐20 17‐May‐20 26‐May‐20
10 1800CS‐Construction of Pipe supports for laying DN 1800 CS pipeline 06‐Sep‐20 18‐Oct‐20 24‐Sep‐20 28‐Oct‐20
11 1600CS‐Construction of Pipe Support for Laying DN 1600 & DN 1200 CS Discharge Header pipelines (3 Lines) 06‐Sep‐20 19‐Oct‐20 24‐Sep‐20 28‐Oct‐20
12 1200CS- Construction of Pipe supports for DN 1200 CS pipeline from Sta􀆟on outlet pipeline to Surge vessels Header 27‐Sep‐20 25‐Oct‐20 04‐Oct‐20 01‐Nov‐20
13 SSV‐1000 Preparatory works for Suc􀆟on Surge Vessel founda􀆟on #01 (Near FMC‐2 for DN 1400 laid by Other Contract ) 18‐Feb‐20 15‐Mar‐20 10‐Mar‐20 06‐Apr‐20
14 EPH‐1000 Excavation works 06‐Apr‐20 12‐Apr‐20 01‐Jun‐20 07‐Jun‐20
15 Ashpalt Road works 1‐Dec‐20 28‐Dec‐20 29‐Dec‐20 26‐Jan‐21
16 DSV - Preparatory works for Discharge Surge Vessels foundation 13‐Aug‐20 12‐Sep‐20 25‐Aug‐20 19‐Sep‐20
17 Madinat Sayeed - Installation of Gate Valve, Dismantling Joint & Fittings(BF), VS, etc 09‐Jul‐20 12‐Jul‐20 02‐Jul‐20 06‐Jul‐20
As buiit drawing coordinates Coordinates from Site Differences
Sl No Station Remarks
Easting Northing Easting Northing X difference Y difference Aligned Difference
6 Pump station 747708.521 2668265.029 747707.899 2668264.776 0.621999999974 0.253000000026 0.671 Point A
''' 747733.514 2668275.097 747733.152 2668275.097 0.361999999965 0 0.362 Point B

Pump station 747735.801 2668269.692 747735.373 2668269.516 0.427999999956 0.175999999978 0.463


''' 747710.756 2668259.561 747710.129 2668259.307 0.627000000095 0.25400000019 0.676

7 Existing Electrical room 747690.297 2668257.412 747689.84 2668257.225 0.457000000053 0.186999999918 0.494
''' 747691.99 2668253.27 747692.581 2668250.408 -0.591000000015 2.862000000197 2.922
''' 747674.864 2668246.273 747675.007 2668243.318 -0.14300000004 2.955000000075 2.958
''' 747672.255 2668252.66 747672.28 2668250.153 -0.025000000023 2.507000000216 2.507

8 Oil Chamber 747671.075 2668243.106 747671.495 2668240.261 -0.420000000042 2.845000000205 2.876


''' 747666.447 2668241.216 747667.988 2668238.844 -1.540999999968 2.371999999974 2.829
''' 747664.556 2668245.844 747666.473 2668242.594 -1.917000000016 3.25 3.773
''' 747669.185 2668247.735 747669.986 2668244.019 -0.800999999978 3.716000000015 3.801

9 BM 2 747651.775 2668183.323 747651.809 2668183.392 -0.033999999985 -0.069000000134 0.077 Closing error

747670.593 2668235.791 12
747669.64 2668235.406 13
747670.185 2668234.078 14
747671.15 2668234.466 15
747664.5 2668239.168 16
747666.135 2668235.511 17
747671.05 2668232.214 18
747676.724 2668233.577 19
747679.915 2668237.765 20
747679.103 2668243.356 21
747658.791 2668236.977 22
747664.489 2668228.286 23
747673.423 2668226.006 24
747682.468 2668229.118 25
747704.059 2668237.796 26
1 AVC 01 747543.71 2668502.83 747543.731 2668502.838 -0.021000000066 -0.007999999914 0.022 AVC 01
0 0 0.000
2 FMC 02 747543.256 2668491.912 747543.848 2668490.625 -0.591999999946 1.287000000011 1.417 FMC 02
''' 747549.566 2668494.55 747549.904 2668493.136 -0.337999999989 1.413999999873 1.454 '''
''' 747551.628 2668489.618 747551.784 2668488.653 -0.155999999959 0.964999999851 0.978 '''
''' 747545.317 2668486.98 747545.711 2668486.126 -0.393999999971 0.853999999817 0.941 '''

3 T1200 S tank Outlet 01 747548.317 2668425.423 747548.39 2668425.407 -0.072999999975 0.015999999829 0.075 T1200 S tank Outlet 01
Outlet 2 747564.392 2668407.696 747564.897 2668408.629 -0.505000000005 -0.933000000194 1.061 Outlet 2

4 T14200 S tank Outlet 01 747605.984 2668305.862 747606.129 2668306.62 -0.144999999902 -0.757999999914 0.772 T14200 S tank Outlet 01

5 Drain chamber line 2 747608.485 2668388.816 747608.235 2668390.617 0.25 -1.800999999978 1.818 Drain chamber line 2
''' 747607.918 2668390.204 747607.856 2668391.584 0.061999999918 -1.379999999888 1.381 '''
''' 747606.53 2668389.637 747606.888 2668391.2 -0.358000000007 -1.563000000082 1.603 '''
''' 747607.097 2668388.249 747607.269 2668390.231 -0.17200000002 -1.982000000309 1.989 '''
12/9/2019 12/10/2019 12/11/2019 12/12/2019 12/14/2019 12/15/2019
MV 25 14.1666667 10 19.3333333
Nachi 26.25
KH 10 19 12 13

1/19/2020 1/20/2020 1/21/2020 1/22/2020 1/23/2020


MV 19.6666667 11.25 19.08334
Nachi
KH 19.6666667 -8.5 11.5 11.25 21
WV 11.25
AP 21

2/19/2020 2/20/2020 2/21/2020 2/22/2020 2/23/2020


MV 23
Nachi 26.25
Iftihar 166 17.5
Wilson 11.25
Nazeer 18
Anil 8
44
12/16/2019 12/17/2019 12/18/2019 12/19/2019 12/21/2019 12/22/2019 12/23/2019 12/24/2019
21 13.75 29.3333333 21

7.5 21 13.75 -7.75 -35 29.3333333 12 21

1/25/2020 1/26/2020 1/27/2020 1/28/2020 1/29/2020 1/30/2020 2/1/2020 2/2/2020


11.6666667 21 17.5 15 21

10.5 -6.3333333 38.5 15 17.5 21

22.5

2/24/2020 2/25/2020 2/26/2020 2/27/2020 2/28/2020 2/29/2020 3/1/2020 3/2/2020


21 10

15 10 10

10
-505 -400.5833333

19.58333333

2/3/2020 2/4/2020 2/5/2020 2/6/2020 2/7/2020 2/8/2020 2/9/2020


15 11.33333333 ---- 2

---- 11.33333333 ---- 10 15

10

3/3/2020 3/4/2020 3/5/2020 3/6/2020 3/7/2020 3/8/2020 3/9/2020


13.33333333 6.25 31.5 47 7

13.33333333 6.25 31.5


6.25

31.5

0.2
3.9 0.8 3.1 2.35
3.1 1.8 1.3
1.3 0.45 0.85 349
0.85 0.1 0.75
2/10/2020 2/11/2020 2/12/2020 2/13/2020 2/14/2020 2/15/2020
31.5 -5

21 15 158

2/14/2020 2/15/2020