CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed

CONTRACT AMOUNT : AED 134,726,236.92

CONTRACT NUMBER: N14673.2

START DATE : 11-11-2018 COC

DURATION : 24 Months Specs

COMPLETION DATE : 10-11-2020 Preamble Click here

CONTRAT REFERENCE LOG BOOK

Volume Clasue Description Specs Page No Quick Ref Remark

V-3 Clasue-5 Lumpsum only payable Preamble AD-0051-2/7 Lumpsum Item&Qty Contractor responsible.Transco description indicative only
V-3 Clasue-6 Protection &Dewatering Preamble AD-0051-2/7 Lumpsum Dewatering ,Protection adjusent site,overpulling etc inclusive
V-3 Clasue-7 No remesurement& No re evaluation Preamble AD-0051-2/7 Lumpsum No re measurement for Lumpsum
V-3 Clasue-8 SOP or Spec not listed item Not payable Preamble AD-0051-2/7 Lumpsum Scope,Spec,SOP not specifically mentioned deemed to be in other item
Contract Clasue-10 Not priced item not payable Preamble AD-0051-3/7 Lumpsum Items not priced deemed to be included elsewhere

AIC/QS/1 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed

CONTRACT AMOUNT : AED 134,726,236.92

CONTRACT NUMBER: N14673.2

START DATE : 11-11-2018 COC Click Here

DURATION : 24 Months Specs Click Here

COMPLETION DATE : 10-11-2020 BOQ Click Here

CONTRAT REFERENCE LOG BOOK

Clasue Description Specs Page No Sub Clause

Contract Nil Signed Conract Documents PCOC P-1 to 3 Contract Doc Particular Conditions of Contract-PCOC
Contract Nil Apendix to Tender PCOC P-4 to 6 Appendix Tender
Contract 1.16.12 Mile Stone Defenition PCOC P-9 Mile Stone
Contract 1.16.13 Mile Stone Dates-Annexure-I PCOC P-9 Mile Stone
Contract 3.5E Mile Stone Percentage breakdown Empl:Req: P-10 Mile Stone Mile stone percentage
Mile Stone Percentage
Contract Appendix G Empl:Req: P-1&2 after P32 Mile Stone Mile stone percentage&Duration
breakdown&Duration
Contract 1.5 Documents Priority PCOC P-10 Documents
Contract 3.3 Instructons of the Engineer PCOC P-15 EI
Contract 4.2 Instructons of the Engineer PCOC P-16 EI Performance bond with in 14 days
Contract 4.26 Product Guarantee PCOC P-19 Warranty 10% hold until gurantee
Contract 4.30. TOC related 4.30.1.3 PCOC P-20 TOC
Maximum cost is limited to 10% as per
Contract 4.30. Delay Damages 4.30.1.6 PCOC P-20 Delay Damage
Appendix to tender
Delay Damages Wave off& Engineers
Contract 8.7 PCOC P-75 Delay Damage
Cost

AIC/QS/2 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed

CONTRACT AMOUNT : AED 134,726,236.92

CONTRACT NUMBER: N14673.2

START DATE : 11-11-2018 COC Click Here

DURATION : 24 Months Specs Click Here

COMPLETION DATE : 10-11-2020 BOQ Click Here

CONTRAT REFERENCE LOG BOOK

Clasue Description Specs Page No Sub Clause


Delay Damages Wave off& Engineers
Contract 8.7 PCOC P-25 Delay Damage
Cost
Contract 8.2 Completion GCOC P-71 Delay Damage
Contract 4.30. Defects of Notification period 4.30.1.7 PCOC P-20 Warranty
Contract 8.2 Time of Completion PCOC P-23 TOC
Contract 8.4 EOT-Extension of time PCOC P-23 EOT

Contract 8.4 EOT-Extension of time GCOC P-73 EOT

Contract 10.1 Tacking over Certificate (TOC) PCOC P-25 TOC


Contract 10.1 Tacking over Certificate (TOC) GCOC P-80 TOC
Contract 10.2 Tacking over part of Work PCOC P-26 TOC
Contract 11.12 Collateral Warranties PCOC P-26 Warranty 15% hold right
Contract 13.1 Variation Procedure GCOC P-92 VO
Contract 13.3 Variation Procedure PCOC P-28 VO
Contract 13.5 Provisional Sum GCOC P-95 Provisional Sum
Contract 13.5 Provisional Sum PCOC P-28 Provisional Sum

AIC/QS/3 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed

CONTRACT AMOUNT : AED 134,726,236.92

CONTRACT NUMBER: N14673.2

START DATE : 11-11-2018 COC Click Here

DURATION : 24 Months Specs Click Here

COMPLETION DATE : 10-11-2020 BOQ Click Here

CONTRAT REFERENCE LOG BOOK

Clasue Description Specs Page No Sub Clause

Contract 13.8 Unit Rate fixed PCOC P-29 BOQ


Contract 14.1a Works to Measured PCOC P-29 Payment Measurement
Contract 14.2 Advance Payment GCOC P-101 Ad PC Measurement
Contract 14.3 Interim Payment GCOC P-102 Payment Measurement
Contract 14.3 Interim Payment PCOC P-31 Payment Measurement
Contract 14.4 Schedule of Interim Payment GCOC P-103 Payment Measurement
Contract 14.5 Plant & material GCOC P-104 Payment 80% of Amt
Contract 14.6 Interim Payment-14 days PCOC P-32 Payment Measurement
Contract 14.7 Payments GCOC P-107 Payment payment
Contract 14.9 Payments of Retention money GCOC P-108 Payment Retention
Contract 14.10 Statement of Completion GCOC P-109 Payment Completion
Contract 14.11 Final Payment GCOC P-109 Final PC payment
Contract 14.13 Issue of Final Payment GCOC P-110 Final PC payment
Contract 18.1 Insurances GCOC P-126 Insurance
Contract 18.1 Insurances PCOC P-34 Insurance

AIC/QS/4 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed

CONTRACT AMOUNT : AED 134,726,236.92

CONTRACT NUMBER: N14673.2

START DATE : 11-11-2018 COC Click Here

DURATION : 24 Months Specs Click Here

COMPLETION DATE : 10-11-2020 BOQ Click Here

CONTRAT REFERENCE LOG BOOK

Clasue Description Specs Page No Sub Clause

Contract 18.2 Insurances-Contrator Equipemts PCOC P-35 Insurance


Insurances-Persons Injury/Property
Contract 18.3 PCOC P-35 Insurance
Damage
Contract 23.3 Retention Guarantee PCOC P-38 Retantion

Contract 1.1.1.3 Letter of acceptance GCOC P-16 Ltr Acceptance

Contract 2.5 Employer Claim GCOC P-33 Emp Cl

Contract 3.1 Engineers duty GCOC P-35 Eng Duty

Contract 4.1A Contractor Warranty-Dsign&Permit GCOC P-38 Design Design Responsibilty

Contract 4.20 Free isue material GCOC P-51 Free Issue

Contract 4.21 Monthly Progress Report GCOC P-52 Progres Report 6 copies+Commencement Date+7 days

Contract 5.2 Contractor's Document GCOC P-57 Contractor;s Doc 21 days for review+Only after approval

Contract 5.6 Asbuilt Documents GCOC P-61 Asbuilt

Contract 6.6 Engineers Facility &Contractor GCOC P-63 Engineers Facility

Contract 7.2 Sample of Material GCOC P-67 Material Sample

AIC/QS/5 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed

CONTRACT AMOUNT : AED 134,726,236.92

CONTRACT NUMBER: N14673.2

START DATE : 11-11-2018 COC Click Here

DURATION : 24 Months Specs Click Here

COMPLETION DATE : 10-11-2020 BOQ Click Here

CONTRAT REFERENCE LOG BOOK

Clasue Description Specs Page No Sub Clause

Contract 7.5 Rejection GCOC P-69 Rejection

Contract 7.6 Remedial Work GCOC P-70 Remedial Work

Contract 8.2 Programme GCOC P-71 Detail Programe

Contract 4.12A Project Execution Plan Empl:Req: P-18 Detail Programe With 14 days of commencement

Contract 4.12B Project Monthly Report Empl:Req: P-20 Monthly report 23rd of Every month

Contract 4.15C Const Drawing & Documents Empl:Req: P-25 Drawings

Contract 4.16A Approved Drawing Empl:Req: P-26 Drawings

Contract 1.15.2o Donot Work without shop drawing G.Spec P-51 Shop Drawing Donot allow contractor without shop drawing

Contract 1.15.q4 Drawing review not allowing for EOT G.Spec P-52 EOT Contractor do not have right

Contract 1.16.7 Health and Safety G.Spec P-60 Drawings

Contract 102.13 Exisiting Utilities ADM-SS P-25 Untility

AIC/QS/6 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed

CONTRACT AMOUNT : AED 134,726,236.92

CONTRACT NUMBER: N14673.2

START DATE : 11-11-2018 COC Click Here

DURATION : 24 Months Specs Click Here

COMPLETION DATE : 10-11-2020 BOQ Click Here

CONTRAT REFERENCE LOG BOOK

Clasue Description Specs Page No Sub Clause

AIC/QS/7 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed

CONTRACT AMOUNT : AED 134,726,236.92

CONTRACT NUMBER: N14673.2

START DATE : 11-11-2018 COC Click Here

DURATION : 24 Months Specs Click Here

COMPLETION DATE : 10-11-2020 BOQ Click Here

CONTRAT REFERENCE LOG BOOK

Clasue Description Specs Page No Sub Clause

AIC/QS/8 Page 1 of 9
CONTRACT : MIRFA C-Additional Pumps Group to Supply DN 1200 CS Pipeline to Madinat Zayed

CONTRACT AMOUNT : AED 134,726,236.92

CONTRACT NUMBER: N14673.2

START DATE : 11-11-2018 COC Click Here

DURATION : 24 Months Specs Click Here

COMPLETION DATE : 10-11-2020 BOQ Click Here

CONTRAT REFERENCE LOG BOOK

Clasue Description Specs Page No Sub Clause

AIC/QS/9 Page 1 of 9