A Field Dev
velopment Project
Clien
nt:
Kuwwait Energgy Iraq Lim
mited (KE
EIL),
P.O.B
Box. 5614, SSalmiya, Ku
uwait
PMC
C:
Toucchstone.
P.O.B
Box. 72129,, Sharjah, U
UAE
EPC Contractor:
ROJET
PETR
P.O. B
Box. 2048,H
Horreya‐Heeliopolice
Cairoo, EGY
Project Title:
SIB
BA FIEL
LD DEV
VELOPMENT PROJE
ECT
Conttract No:
KEIL//SIBA/2015/C‐051
1‐REV‐CP
PF EPC
Docu
ument Tittle:
Pre
e‐Com
mmissio
oning a
and Co
ommisssionin
ng Pro
ocedurre
A 31/01/16 For Ap
pproval PN AS AC
Prepared Approved Approveed
Rev. Date Rev. Desscription Checked By
y Rep.
PMC R Clien
nt Rep.
By By PTJ
PO No.. :DXB13//735/TRK
K/2016
Docu
ument No
o: C‐051‐V
VP‐040‐CLTW‐PRO
O‐0007
SDRL C
Code: P03
3
Form
mat Pages
A
A4 Page 1 of 11
SIBA FIE
ELD DEV
VELOPME
ENT PROJJECT
KEIL
L/SIBA/2015/C-051-REV–CPF EPC
C
Document Num
mber Doccument Title Page Page 2 of 11
Rev. A
C-051-V
VP-040-CLTW
W-PRO-0007 Pre-Comm
missioning an
nd Commissioning Proccedure Date 31/01/16
A
Amendm
ment Summary
Revision
n No D
Date Descrip
ption
Discclaimer: ‐ “This document is issued for the party wh hich commissioned it and ffor specific purposes conn
nected with th
he
capttioned project only. It shou
uld not be rellied upon by any other party or used fo
or any other ppurpose.
Page 2 o
of 11
SIBA FIE
ELD DEV
VELOPME
ENT PROJJECT
KEIL
L/SIBA/2015/C-051-REV–CPF EPC
C
Document Num
mber Doccument Title Page Page 3 of 11
Rev. A
C-051-V
VP-040-CLTW
W-PRO-0007 Pre-Comm
missioning an
nd Commissioning Proccedure Date 31/01/16
TA
ABLE OF
O CONTENT
TS
Page 3 o
of 11
SIBA FIELD PROJECT
ISSUED FOR
0 01/10/2015 AI KS AS
APPROVAL
Rev No. DESCRIPTION DATE PREPARED BY CHECKED BY APPROVED BY
5.0 Responsibilities
9.0 Reference
This method statement defines the procedures and instructions for cooling
tower pre-commissioning activities.
The purpose of this method of statement is to cover all the activities in pre-
commissioning the CT towers. The pre-commissioning must be carried out
strictly accordance with the approved manuals, installation manual & Hamon
Supervisor instructions.
Mechanical Engineer
Hamon Engineer
Safety Officer
Site Supervisor
Fitters, Mill-wrights
Helpers
5.0 Responsibilities.
Mechanical engineer:
To assign good mill-Wright supervisor and ensures that he is aware of all the
tools and equipment required for pre-commissioning and commissioning the
cooling towers.
Hamon Engineer/Supervisor:
To train the team for special jobs or methods arising in the cooling tower pre-
commissioning.
Safety officer:
To ensure the safe working conditions prior and during the pre commissioning
activities.
To ensure that the team is wearing the proper and the necessary PPE.
To ensure the proper barricading and safety signs surrounding the working
area is maintained.
Site supervisor:
To create a work force that is supported with the qualified fitters, mill-wrights,
and helpers with proper tools.
To ensure that the work is done with proper work permits and safely.
Prior to start the cooling tower commissioning the following activities should be
completed.
Dimension.
Level and slope (slope if applicable).
Post support and mounting.
Basin is leak proof.
Basin is clean.
Float valve is working properly.
Level switch is working and level is set.
Check fan blade angle (as per hamon pitch angle data table).
Check the tip clearances between the blades and the fan stack.( as per
hamon tip clearance design range)
Ensure adequate width approach ladder and access to gear box and
fan.
NOTE:
Make sure all these points are covered before first startup of CT
towers.
Follow for other cells and keep ready for running start.
Do not sign installation report until and unless you are fully satisfied.
9.0 Reference:
Fill the data’s on the Inspection Check List, Pitch angle data table, tip clearance data
table, Alignment data table and VFD data Table.