Prime / Tack Coat Test

Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:

Name of the Contractor : M/s. KCC Buildcon Pvt. Ltd.


Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling:...
……….....
Make/Brand ……………. Date of Testing: ………..……
OBSERVATION TABLE

S.No. DESCRIPTION UNIT TRIAL-1 TRIAL-2

1 Initial weight of Plate W1 Kg

2 Area of Plate A m2

3 Weight of Plate after Prime / Tack Kg


coat W2
4 Weight of Prime / Tack coat Kg
W3=W2-W1

5 Prime / Tack coat W3/A Kg/10m


2
6 Average of Prime / Tack coat Kg/10m
2
7 Permissible Limit Kg/10m
2

Remarks: …..…………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

FLAKINESS INDEX AND ELONGATION INDEX


(As per IS: 2386 Part-I)

Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:

Name of the Contractor : M/s. KCC Buildcon Pvt. Ltd.


Client : Military Engineer Services

Type of Sample……………… Test No……………….


Location/Source: …………….. Date of Sampling:…………….
Date of Testing: ………..……
OBSERVATION TABLE
SIZE OF SIEVE WEIGHT OF WEIGHT OF WEIGHT OF WEIGHT OF
SL. FRACTION AGG. IN AGG. IN EACH AGG.IN
NO. PASSING RETAINED CONSISTING EACH FRACTION EACH
THROUGH ON SIEVE OF ATLEAST FRACTION RETAINED ON FRACTION
SIEVE (mm) (mm) 200 RETAINED PASSING THICKNESS RETAINED
PIECES THICKNESS GAUGE ON LENGTH
(gm) GAUGE (gm) GAUGE
(gm) (gm)
A B C D E F
1 63 50
2 50 40
3 40 31.5
4 31.5 25
5 25 20
6 20 16

7 16 12.5
8 12.5 10
9 10 6.3

TOTAL

(A) FLAKINESS INDEX (F.I ) = Total wt.of flaky material x 100 = ……………...….%
Total wt. Sample

(B) ELONGATION INDEX (E.I) = Total wt.of Elongation material x 100 = …..………...…. %
Total wt.ofnon flaky material

(C) COMBINED F.I & E.I = (A) + (B) =………………...…%

PERMISSIBLE LIMIT = ……….. %…( Flakiness)&………..% (Combined)


Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SIEVE ANALYSIS FOR 20MM AGGREGATE


(As per IS: 383)

Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:

Name of the Contractor : M/s. KCC Buildcon Pvt. Ltd.


Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of sampling……………
Wt. of sample……………….. Date of Testing: ………..……
OBSERVATION TABLE

S.No. Sieve Wt.retained Cumulative Percentage Percentage Permissible


Size(mm) (gm) wt.retained Cumulative wt. passing Limits
(gm) wt.retained (%) (%)
(%)

1 37.5 100

2 31.5 85-100

3 19 0-20

4 9.5 0-5

Remarks:
……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

SIEVE ANALYSIS FOR 10MM AGGREGATE

Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:

Name of the Contractor : M/s. KCC Buildcon Pvt. Ltd.


Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Source: …………….. Date of Sampling: ...……….....
Wt. of sample……………. Date of Testing: ………..……

OBSERVATION TABLE

Sr.N Sieve Wt.retained Cumulative Percentage Percentage Permissible


o. Size(mm) (gm) wt.retained Cumulative wt. passing Limits
(gm) wt.retained (%) (%)
(%)

1 12.5 100

2 10 85-100

3 4.75 0-20

4 2.36 0-5

Remarks:
……………………………………………………………………………………………………..

Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE


SIEVE ANALYSIS OF CRUSHED STONE SAND

Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:

Name of the Contractor : M/s. KCC Buildcon Pvt. Ltd.


Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: ……………. Date of Sampling: ...………......
Weight of Sample……………… Date of Testing: ………..……

OBSERVATION TABLE

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (Zone –II)
(%)
1. 10 100

2. 4.75 90-100

3. 2.36 75-100

4. 1.18 55-90

5. 0.600 35-59

6. 0.300 8-30

7. 0.150 0-20

Remarks: ………………………………………………………………………………………
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

AGGREGATE IMPACT VALUE TEST


(As per IS: 2386 Part-IV)

Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:

Name of the Contractor : M/s. KCC Buildcon Pvt. Ltd.


Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Date of Testing: ………..……
OBSERVATION TABLE

S.
No. Test No. 1 2 Permissible
Limit
(%)
1 Mass of Aggregate(Oven Dry) Passing 12.5 mm IS Sieve
and Retained on 10 mm IS Sieve (Wa) (gm)

2 Mass of Fraction Retained on 2.36 mm IS Sieve(Wb)


(gm)

3 Mass of Fraction Passing 2.36 mm IS Sieve (Wc) (gm)

4 Aggregate Impact Value = Wc/Wa x 100 %

5 Average Aggregate Impact Value (%)


. …...% MAX

Remarks:
……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARG

SLUMP AND COMPACTION FACTOR OF CONCRETE


(As per IS: 1199)

Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:

Name of the Contractor : M/s. KCC Buildcon Pvt. Ltd.


Client : Military Engineer Services

Type of Sample…………… Test No….……


Location/Source…………. Date of Sampling……………
Date of Testing……………
OBSERVATION TABLE

S. Admixture / W/C Ratio Slump(mm) Compaction factor


No. cement Partially Fully C.F
compacted compacted
Ratio

Remarks:
…………………………………………………………………………………………………….
Lab Engineer Contractor’s Rep. J.E.(Civil) ENGR-IN-CHARGE

CORE CUTTING DENSITY

Name of work : Resurfacing of Runway and allied works services at A/F station, Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:

Name of the Contractor : M/s. KCC Buildcon Pvt. Ltd.


Client : Military Engineer Services

Type of Sample: ……………… Test No….……


Location/Layer No.: ……………. Date of Sampling: ...……….....
Lab Density :……………g/cc Date of Testing: ………..……
OBSERVATION SHEET
S. Chainage Height Wt. of Wt. of Wt. of Volume Density
No. of core sample Sample in S.S.D (cc) (g/cc)
(mm) in Air Water Sample(gm)
(gm) (gm)
1

Remarks:
……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

CEMENT TEST
Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:

Name of the Contractor : M/s. KCC Buildcon Pvt. Ltd.


Client : Military Engineer Services

Make:……………..

Week No:…………. Date of Testing:…………………

Grade:……………. Date of Cube Casting………..…


OBSERVATION SHEET

S.No Test Result Limit

1 Fineness Test (0-10)%

2 Consistency Test (27-35)%


3 Compressive
Strength Test
(i) 3 Days ( ) 23 N/mm2

(ii) 7 Days ( ) 33N/mm2

(iii) 28 Days( ) 43N/mm2

4 Setting Time
(i) Initial Setting Time Min 30 minutes

(ii) Final Setting Time Max 600 minutes

5 Soundness Test (0-10)mm

Remarks:
…………………………………………………………………………………………………….
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE

COMBINED AGGREGATE GRADING FOR PQC


IRC-15(2017)

Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:

Name of the Contractor : M/s. KCC Buildcon Pvt. Ltd.


Client : Military Engineer Services

Type of Sample: …………….… Test No….……


Location/Source: …………….. Date of Sampling: ...………......
Weight of Sample……………… Date of Testing: ………..……

Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)

1 37.5 100

2 31.5 90-100

3 26.5 85-95

4 19.00 68-88

5 9.5 45-65

6 4.75 30-55

7 600 micron 8-30

8 150 micron 0-10

9 75 micron 0-5

Remarks: ………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE