Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:
2 Area of Plate A m2
Remarks: …..…………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:
7 16 12.5
8 12.5 10
9 10 6.3
TOTAL
(A) FLAKINESS INDEX (F.I ) = Total wt.of flaky material x 100 = ……………...….%
Total wt. Sample
(B) ELONGATION INDEX (E.I) = Total wt.of Elongation material x 100 = …..………...…. %
Total wt.ofnon flaky material
Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:
1 37.5 100
2 31.5 85-100
3 19 0-20
4 9.5 0-5
Remarks:
……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:
OBSERVATION TABLE
1 12.5 100
2 10 85-100
3 4.75 0-20
4 2.36 0-5
Remarks:
……………………………………………………………………………………………………..
Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:
OBSERVATION TABLE
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (Zone –II)
(%)
1. 10 100
2. 4.75 90-100
3. 2.36 75-100
4. 1.18 55-90
5. 0.600 35-59
6. 0.300 8-30
7. 0.150 0-20
Remarks: ………………………………………………………………………………………
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:
S.
No. Test No. 1 2 Permissible
Limit
(%)
1 Mass of Aggregate(Oven Dry) Passing 12.5 mm IS Sieve
and Retained on 10 mm IS Sieve (Wa) (gm)
Remarks:
……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARG
Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:
Remarks:
…………………………………………………………………………………………………….
Lab Engineer Contractor’s Rep. J.E.(Civil) ENGR-IN-CHARGE
Name of work : Resurfacing of Runway and allied works services at A/F station, Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:
Remarks:
……………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
CEMENT TEST
Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:
Make:……………..
4 Setting Time
(i) Initial Setting Time Min 30 minutes
Remarks:
…………………………………………………………………………………………………….
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE
Name of work : Resurfacing of Runway and allied works services at A/F station,Jamnagar
Contract Agreement No. : CE(AF)G/JAM/39 OF 2018-2019
:
Sl. Sieve size Wt. Retained Cumulative % Cum. Wt. % Wt. Permissible
No. (mm) (gm) Wt. Retained Retained Passing Limits
(gm) (%)
1 37.5 100
2 31.5 90-100
3 26.5 85-95
4 19.00 68-88
5 9.5 45-65
6 4.75 30-55
9 75 micron 0-5
Remarks: ………………………………………………………………………………………………..
Lab Engineer Contractor’s Rep. J.E.(Civ) ENGR-IN-CHARGE