DESIGN OF CANTILEVER RETAINING WALL OF
3.0M HEIGHT ABOVE GROUND LEVEL
DESIGN OF CANTILEVER TYPE RETAINING WALL
* INPUT DATA
DEGREE
TOP WIDTH OF STEM X1 = 0.30 m ANGLE OF FRICTION j = 30
2
BOTTOM WIDTH OF STEM X2 = 0.80 m COHESION C = 0.00 Kg/CM
TOE PROJECTION X3 = 1.30 m DENSITY OF BACKFILL tb = 2.00 T/M3
HEEL PROJECTION 4X = 2.60 m DENSITY OF CONCRETE tc = 2.50 T/M3
BOTTOM WIDTH X5 = 4.70 m S.B.C. OF SOIL = 15.00 T/M2
TOP R.L. A = 5.000 m
BOTTOM STEM R.L. B = 0.900 m
MID. LEVEL ABOVE FRL C = 0.450 m
F.R.L. D = 0.000 m
GROUND LEVEL E = 2.000 m
LENGTH OF RETURN WALL L = 100.00 m
COVER OF REINF. AT FOOTING = 75 mm
COVER OF REINF. AT STEM = 40 mm
P.C.C. OFFSET = 0.15 m
THICKNESS OF P.C.C. = 0.15 m
GRADE OF CONCRETE = M 30
GRADE OF STEEL = FE 500
Q = 40.08 kg/cm2
DESIGN:
STEM HEIGHT H1 = ( 5.000 - 0.900 ) = 4.100 m
TOTAL HEIGHT H2 = ( 5.000 - 0.000 ) = 5.000 m
HEIGHT H3 = ( 0.900 - 0.450 ) = 0.450 m
HEIGHT H4 = ( 0.450 - 0.000 ) = 0.450 m
HEIGHT H5 = ( 2.000 - 0.000 ) = 2.000 m
HEIGHT H6 = ( 0.900 - 0.000 ) = 0.900 m
WIDTH X = ( 0.800 - 0.300 ) = 0.500 m
2
COSj ---(2)
PASSIVE EARTH PRESSURE COEFF. Kp = 1 - n
n = SIN( 30 + 20 ) x SIN 30 .
COS 20
= 0.407604 = 0.638
This value put in Eq (1) & (2), So That
Ka = 0.279 , FOR j = 30
Kp = 5.737 , FOR j = 30
* PRESSURE DISTRIBUTION:
5.000 m
0.900 m
2.29 T/M2
0.000 m
0.67 T/M2 2.790 T/M2
Max B.M. in vertical slab at R.L. 0.90 m
(Neglect earth pressure effect of soil located at toe side)
SV = 42.00 T Sm = 88.20
Sh = 10.32 T Tm
Sm = 88.20 = 2.100 m
Z = Sv 42.00
e = B --Z = 4.70 - 2.100 = 0.250 m
2 2
B/6 > e 0.783 m > 0.250 m STABILITY IS O.K......
Pmax = SV ( 1 + 6e/B )
B
= 42.00 ( 1 + 6 x 0.250 )
4.70 4.70
= 11.79 T/M2 < 15.00 T/M2 (S.B.C. OF SOIL) OK
Pmin = SV ( 1 - 6e/B )
B
= 42.00 ( 1 - 6 x 0.250 )
4.70 4.70
= 6.08 T/M2 (COMPRESSION).......O.K.
STABILITY CHECK
LOAD
Mk VERT. HORI L.ARM MOM. FACTOR
No LOAD T T M T-M
SV = 56.71 T
Sm = 115.62 Tm
Sh = 15.48 T
* CHECK FOR F.O.S. AGANIST OVERTURNING:
Restoring Moment = 6.019313 + 6.11156 + 4.131 + 1.28334 + 13.426 + 0.8555625 + 5.857313 + 97.8588 +
6.05475 + 5.3505 + 0.00
= 146.95 tm
Overturning Moment = 21.97 + 12.555 = 34.526
Sm = 115.62 = 2.039 m
Z = Sv 56.71
e = B --Z = 4.7 - 2.039 = 0.311 m
2 2
B/6 > e 0.783 m > 0.311 m
7.27 T/M2
12.57
14.21 T/M2
16.86 T/M2 T/M2
= 14.21 x 1.30 x 1.30 + 0.50 x 2.65 x 1.30 x 1.30 X2/3 -1.28 -0.43
2
= 12.00 + 1.5 -1.28 -0.43
= 11.79 TM/M
Net B.M. at face of heel slab = Moment due to (soil + self wt.) - Moment due to upward pressure
Net Shear =( 28.78 +3.95 +1.97 +1.58 ) - ( 12.57 +7.27 )/2 x 2.600
LEVEL HT OF HT INCL EP COEF EP BM d Reqd D Prov Ast Reqd Ast Provided Ast
STEM SURCHA Mini.
1.51
5.000 0.000 1.200 1.004 0.00 0.00 0.252
10 T @ 225 c/c 3.49 2.98
3.000 2.000 3.200 2.678 3.12 0.09 0.496 1.46
12 T @ 225 c/c 5.03
12 T @ 225 c/c 5.03 4.44
1.000 4.000 5.200 4.352 16.96 0.21 0.740 5.34
12 T @ 225 c/c 5.03
25 T @ 225 c/c 21.82 5.90
-1.000 6.000 7.200 6.026 48.21 0.35 0.984 11.49
12 T @ 225 c/c 5.03
25 T @ 225 c/c 21.82 4.51
0.900 4.100 5.300 4.436 18.06 0.21 0.752 5.59
12 T @ 225 c/c 5.03
5.00 Wp
W10
AVG GL 2.00
4.10
W8
1.10 W1 EP
W12 W2
0.9
W11 W6 W3 W7 W9 0.45
0.90
TOE 0 W4 W5 0.45 HEEL
4.70