(Firestop) Breathing valve

Weather (firestop) breathing valve

According to the national standard "Petrochemical Enterprises fire protection design"


(GB50160-92) of: A, B liquid fixed roof tanks, flame arrester should be located and breathing
valve. Visible breathing valve, flame arrester tank is an indispensable safety. It can not only
maintain the pressure Ping Heng tank to ensure that the tank from damage during overpressure
or vacuum, volatilization and loss of the tank and can reduce the medium.

I produced the breathing valve having a compact structure, good ventilation volume, and the
sealing performance characteristics. Recently developed explosion-proof Fire breathing valve
with advanced international standards, the flame arrester breathing valve suction port is located,
the complete elimination of the source of fire into the breathing valve housing. Small size, light
weight, maintenance, cleaning, replacement, etc. easy. Installation] [
Technical Parameters Size mm
model HXF-I HXF-IZ specification L H
WCB 304 316L
The main material DN 25 160 165
Aluminum
Flame arrester core 304 316L DN 32 180 185
Positive valve disk 304 316L Aluminum DN 40 190 190
Negative valve disc 304、316、PTFE DN 50 220 220
Spacer PTFE DN 80 270 260
Bolts and nuts 20 # 304 316L DN 100 310 280
Explosion levels BS 5501:ⅡA B C DN 150 380 330
Operating pressure + 1765Pa ~ -295Pa DN 200 450 380
GB HG JIS ANSI
Standard flange DN 250 520 420
DIN
Manufacturing GB5908-2005
DN 300 670 520
Standards SY5117-87

1, breathing valve should be installed at the highest point of the tank the gas source, to reduce
the evaporation loss of material and in order to smoothly provide the most direct access to the
valve and the maximum breathing passages. For generally vertical tank, breathing valve should
be installed in the roof tank top central range, for roof storage tank for an insulating layer is
provided, it may be mounted in the vicinity of the ladder internet.
2, breathing valve at the factory, our company in the installation of a flange surface dust
protection cover, be sure to remove the dust cover during installation, when you need to install
two breathing valve, and they should be symmetrically arranged in the center of the tank top
. When loading and unloading, the breathing valve must be vertically upward, not upside down
or horizontally. When taken out for cleaning the stem, to a vertical light, otherwise the stem
easily deformed.
3, when the breathing valve on the seaming nitrogen, the nitrogen gas supply pipe to take
over the position of the interface away from the breathing valve, inserted into the top of the tank
by about 200mm in the tank, is not discharged directly into the tank such as nitrogen, a nitrogen
blanket to achieve .

[] Repair and maintenance

order (fire retardant) breathing valve safe to use, should periodically corrugated fire
barrier removed within 3-6 months, clean, fire resistant layer on each hole to ensure smooth
flow, prevent clogging, to ensure safety Normal use. Ventilation air periodically check the
positive and negative movement is flexible valve disk, the valve disk contact the guide rod and
the sealing surface for damage, if any damage should be replaced immediately. When
reinstalling inspection, maintenance, should ensure that each of the valve with tight joint
surface, a flexible valve disc down. When enabled new valve, should be installed before
removing the flange cover, remove shockproof material between the valve disc, or breathing
valve malfunction.