A N T E M A S U R A T O A R E

CONSOLIDARE DRUM – DJ 100 H - JUGURENI


Km 9+040,00
CONSOLIDARE DRUM I-1
-ZID SPRIJIN PE ELEMENTE FISATE (MINIPILOTI FORATI);
L ZID = 100,00 m; L MINIPILOTI = 8,00 m; D = 250 mm
AC3988 PAG: 1
===============================================================
=NR. SIMBOL ART. CANTITATE UM =
= D E N U M I R E =
= A R T I C O L =
= =
===============================================================
CAP. A – PLATFORMA MINIPILOTI FORATI
01 TSC03G1
SAPAT.MEC.CU EXC.DE 0,41-0,7 MC IN PAM C
U UMIDITATE NATURAL DESC.AUTO.TEREN CAT 3
-amplasare:
120,00x3,50x1,00X1/2= 210,00
210,00:100= 2,10
Cantitate= 2.100 100 MC.
02 TSC19C1
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL.I
MPING.PAMINTULUI LA 10 M TEREN CAT.3
-platforma minipiloti: 100,00x3,50x0,50= 175,00
175,00:100= 1,75
Cantitate= 1.800 100 MC.
03 TSC22E1
SPOR PT. FIECARE 10 M IN PLUS LA TSC19C
1 BULDOZER DE 81-180 CP TEREN CATEGORIA
3
1x1,75= 1,75
Cantitate= 1.800 100 MC.
04 TRA04A
TRANSPORT RUTIER MATER.SEMIFABR. CU AUTO
REMORCHERE CU REMORCI TREILER SUB 20T PE
DIS. KM.*
-buldozer : 2x20 t= 40 t
-excavator: 2x20 t= 40 t
-----------------------
TOTAL = 80 t
Cantitate= 80.000 TONA
05 TRI1AA01C2
INCARCAREA MATERIALELOR,GRUPA A-GRELE SI
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN-A
UTO CATEG.2
175,00x1,24x1,8x50%= 195,30
Cantitate= 195.000 TONA
06 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM.
210,00x1,24x1,8+195,30= 664,02
Cantitate= 664.000 TONA
CAP. B – MINIPILOTI FORATI
07 TSJ08C1
FORAJ ROTATIV CU CIRCULATIE DIRECT.TUBAT
T.CAT.3
20 trons.x10 buc./trons.x8,40 m/buc.= 1680,00
Cantitate= 1680.000 M
08 TSA02C1
SAP.MAN.IN SPATII LIMIT.SUB 1M CU TALUZ
VERT.NESPR.IN PAM.NECOEZ.SI SL.COEZ.ADIN
C.<0,75M T.TARE
-amplasare: 100,00x3,50x0,10= 35,00
Cantitate= 35.000 M.C.
09 TRI1AA01C2
INCARCAREA MATERIALELOR,GRUPA A-GRELE SI
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN-A
UTO CATEG.2
-material din sapatura: 35,00x1,24x1,8= 78,12
-material din forare minipiloti:
1680,00x3,14x0,25x0,25/4x1,24x1,8= 183,97
----------------------------------------
TOTAL = 262,09
Cantitate= 262.000 TONA
10 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM.
262,09
Cantitate= 262.000 TONA
11 CZ0301G1
CONFECT.ARMAT.FASONARE BARE PT.FUNDATII
IZOL.CONTINUI SI RADIERE IN ATEL.SANT.OB
37 D=6-8 MM
-D=6 mm, freta, conf. plansa:
20 trons.x10 piloti/trons.x(8,00:0,10)x0,70x0,222 kg/m = 2486,40 kg
-D=8 mm, patine de ghidare, conf. plansa:
20 trons.x10 piloti/trons.x12 buc./pilot x0,20x0,395 kg/m= 189,60 kg
---------------------------------------------------------------------
TOTAL = 2676,00 kg
Cantitate= 2676.000 KG
12 CZ0301I1
CONFECT.ARMAT.FASONARE BARE PT.FUNDATII
IZOL.CONTINUI SI RADIERE IN ATEL.SANT.OB
37 D>16 MM
-D=20 mm, inel de rigidizare, conf. plansa:
20 trons.x10 piloti/trons.x4 buc./pilot x0,65x2,460 kg/m= 1279,20 kg
Cantitate= 1279.000 KG
13 CZ0301L1
CONFECT.ARMAT.FASONARE BARE PT.FUNDATII
IZOL.CONTINUI SI RADIERE IN ATEL.SANT.PC
52 D> 16MM
-D=22 mm, conf. plansa:
20 trons.x10 piloti/trons.x4x8,70 m/buc.x2,980 kg/m= 20740,80 kg
Cantitate= 20741.000 KG
14 PD09C1
TAIEREA CU FLACARA OXIACETILENICA A BARE
LOR DE OTEL CU D DELA 18 PINA LA 22MM
20 trons.x10 buc./trons.x4= 800,00
800,00:100= 8,00
Cantitate= 8.000 100 BUC.
15 PD05A1
CONFECTIONAREA CENTRALIZATA A CARCASELOR
SUDATE DIN OTEL BETON PT.COLOANE FORATE
2676,00+1279,20+20740,80= 24696,00 kg
Cantitate= 24696.000 KG
16 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.=
KM.
-otel beton OB 37 (Furnizor-Atelier):
(2676,00+1279,20)x1,015= 4014,53 kg
Cantitate= 4.100 TONA
17 TRA04A
TRANSPORT RUTIER MATER.SEMIFABR. CU AUTO
REMORCHERE CU REMORCI TREILER SUB 20T PE
DIS. KM.*
-otel beton PC 52 (Furnizor-Atelier): 20740,80x1,015= 21051,91 kg
Cantitate= 21.100 TONA
18 TRI1AC03E2
INCARCARE MAT.GR.C-AMBALATE,50-100KG DEP
LAS.PRIN PURTARE PINA LA 10M,ASEZARE RAM
PA,TEREN-AUTO CT
-carcase: 24696,00 kg
Cantitate= 24.700 TONA
19 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.=
KM.
-carcase (Atelier-Lucrare): 24696,00 kg
Cantitate= 24.700 TONA
20 TRI1AC14E2
DESCARCARE MAT.GR.C-AMBALATE,50-100KG DE
PLAS.PRIN PURTARE PINA LA 10M,ASEZ.AUTO-
RAMPA,TEREN CTG.
-carcase: 24696,00 kg
Cantitate= 24.700 TONA
21 PD11A1
MONTAREA CARCASELOR DE ARMATURI GATA CON
F.IN COL.BA SI LANSAREA LA ADINCIME
24696,00 kg
Cantitate= 24.700 TONA
22 TSJ11A1
PREPARAREA SUSPENSIEI PT.INJECTARE IN FO
RAJE DIN: CIMENT SI SILICAT DE SODIU IN
RAPORTUL 50:1
20 trons.x10 buc./trons.x8,00 m/buc.x3,14x0,25x0,25/4= 78,50
-spor pierderi infiltratii teren fracturat: 78,50x20%= 15,70
-----------------------------------------------------------
TOTAL = 94,20
Cantitate= 94.200 M.C.
23 TSJ16A1
INJECTARE DE UMPLERE CU SUSPENSIE CIMENT
A FORAJULUI PT.TIRANTI DE ANCORARE FIXA
TI IN TEREN
20 trons.x10 buc./trons.x8,00 m/buc.= 1600,00
Cantitate= 1600.000 M
24 TRA06A
TRANSPORTUL RUTIER AL BETONULUI-MORTARUL
UI CU AUTOBETONIERA DE 5,5 MC DIST.=
KM
-suspensie injectare: 94,20x2,00 t/mc= 188,40
Cantitate= 188.000 TONA
25 TSJ13A1
EXTRAGEREA TUBAJULUI DE PROTECTIE CU EXT
RACTOR
20 trons.x10 buc./trons.x8,00 m/buc.= 1600,00
Cantitate= 1600.000 M
26 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.=
KM.
-materiale: 3,68
Cantitate= 4.000 TONA
CAP. C – RADIERE BETON
27 TSA02C1
SAP.MAN.IN SPATII LIMIT.SUB 1M CU TALUZ
VERT.NESPR.IN PAM.NECOEZ.SI SL.COEZ.ADIN
C.<0,75M T.TARE
100,00x1,80x0,50= 90,00
Cantitate= 90.000 M.C.
28 TRI1AA01C2
INCARCAREA MATERIALELOR,GRUPA A-GRELE SI
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN-A
UTO CATEG.2
90,00x1,24x1,8= 200,88
Cantitate= 201.000 TONA
29 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.=
KM.
200,88
Cantitate= 201.000 TONA
30 CZ0302H1
CONFECT ARMAT PT PERETI GRINZI STILPI DI
AFRAGME LACONST OBIS IN ATELIERE SANTIE
R OB 37 D=10-16M
-conf. plansa: 20 trons.x439,09 kg/trons.= 8781,80 kg
Cantitate= 8782.000 KG
31 CZ0302K1
CONFECT ARMAT PT PERETI GRINZI STILPI DI
AFRAGME LACONST OBIS IN ATELIERE SANTIE
R PC 52 D=10-16M
-conf. plansa: 20 trons.x508,72 kg/trons.= 10174,40 kg
Cantitate= 10174.000 KG
32 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM.
-otel beton OB 37 (Furnizor-Atelier): 8781,80x1,015= 8913,53 kg
Cantitate= 8.900 TONA
33 TRA04A
TRANSPORT RUTIER MATER.SEMIFABR. CU AUTO
REMORCHERE CU REMORCI TREILER SUB 20T PE
DIS. KM.*
-otel beton PC 52 (Furnizor-Atelier): 10174,40x1,015= 10327,02 kg
Cantitate= 10.400 TONA
34 TRI1AC01E2
INCARCARE MAT.GR.C-AMBALATE,SUB 10KG,DEP
LAS.PRIN PURTARE PINA LA 10M,ASEZ..RAMPA
,TEREN-AUTO CTG.
-armaturi: 8781,80+10174,40= 18956,20 kg
Cantitate= 19.000 TONA
35 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM.
-armaturi (Atelier-Lucrare): 18956,20 kg
Cantitate= 19.000 TONA

36 TRI1AC12E2
DESCARCARE MAT.GR.C-AMBALATE,SUB 10KG DE
PLAS.PRIN PURTARE PINA LA 10M,ASEZ..AUTO
-RAMPA,TEREN CTG
-armaturi: 18956,20 kg
Cantitate= 19.000 TONA
37 CC01D1
MONTARE ARMATURI DIN OTEL BETON IN GRINZ
I DE RADI ERE CU DISTANTIERI DIN MASE PL
ASTICE
18956,20 kg
Cantitate= 18956.000 KG
38 CB02A1
COFRAJE PT.BETON IN ELEVATIE DIN PANOURI
REFOL.DIN SCINDURI LA ZIDURI DREPTE INC
L.SPRIJINIRILE.0
100,00x(2x1,00+1,27+1,20)+21x[1,20x(0,50+0,90)/2+1,00x1,80]= 407,84
Cantitate= 408.000 MP.
39 PB01A1
TURNARE BETON SIMPLU B50 IN COMPLETARI N
IVELARI UMPLUTURI SI BET.PANTA EXEC.IN S
TRAT DE 5-20CM.
-beton egalizare : 100,00x1,80x0,10= 18,00
-beton panta dren: 100,00x0,45x0,10= 4,50
-----------------------------------------
TOTAL = 22,50
Cantitate= 22.500 M.C.
40 PB09A1
TURN.BET.ARMAT B150 IN FUND.TALPI RADIER
E MANUAL
100,00x1,80x0,90= 162,00
Cantitate= 162.000 M.C.
41 PB10A1
TURN.BET.ARMAT B150 IN ELEV.INFR.DE POD
PILE CASETCHESOANE FUNDATII ZID SPRIJIN
ETC.MANUAL
100,00x1,20x(0,50+0,90)/2= 84,00
Cantitate= 84.000 M.C.
42 2100933
BETON DE CIMENT B 100 STAS 3622
22,50x1,008= 22,68
Cantitate= 22.700 M.C.
43 2100969
BETON DE CIMENT B 250 STAS 3622
(162,00+84,00)x1,008= 247,97
Cantitate= 248.000 M.C.
44 TRA06A
TRANSPORTUL RUTIER AL BETONULUI-MORTARUL
UI CU AUTOBETONIERA DE 5,5 MC DIST.=
KM
-beton C 6/7,5 (B 100): 22,68x2,27= 51,48
-beton C 16/20 (B 250): 247,97x2,51= 622,40
------------------------------------------
TOTAL = 673,88
Cantitate= 674.000 TONA
45 SB16E1
TEAVA PVC-U NEPLASTIF.PT.CANALIZARE,MONT
.APARENT IN NISA,INGROP.PAMINT,SUSPEND.P
LANSEU,CU D=110
-barbacane: 20 trons.x2 buc./trons.x1,15 m/buc.= 46,00
Cantitate= 46.000 M
46 PE01D1
ZIDARIE USCATA IN DREN.LA CULEI SI ZID.S
PRIJ.DIN BOLOVANI DE RIU
100,00x0,45x0,95x2/3= 28,50
Cantitate= 29.000 M.C.
47 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.=
KM.
-bolovani de rau: 28,50x1,160x1,50= 49,59
Cantitate= 50.000 TONA
48 PE02D1
UMPLUTURA DE PIATRA IN CHESOANE,CASOAIE
SPARG.DIN BALAST
100,00x0,45x0,95x1/3= 14,25
Cantitate= 14.000 M.C.
49 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.=
KM.
-balast: 14,25x1,145x1,7= 27,74
Cantitate= 28.000 TONA

50 PF10A1
ROST VERTICAL DE SEPAR. INTRE DOUA ZIDAR
II ALATUR
99 rost.x[1,20x(0,50+0,90)/2+0,90x1,80]= 243,54
Cantitate= 244.000 MP.
51 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.=
KM.
-materiale: 2,00
Cantitate= 2.000 TONA
52 TRA05A
TRANSPORT RUTIER MATERIALE,SEMIFABRICATE
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON.ET
C)PE DIST.DE
-apa: 26,86
Cantitate= 27.000 TONA
CAP. D – PARAPET METALIC
53 DF09A1
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP
A CU LISA SI STILPI METALICI
96,00
Cantitate= 96.000 M
54 6304525
PARAPET METALIC TIP A CU LISA SIMPLA PROD INDU
STR.
96,00x16,41 kg/m= 1575,36 kg
Cantitate= 1575.000 KG
55 TRI1AC04E2
INCARCARE MAT.GR.C-AMBALATE,PESTE 100KG
DEPLAS.PRIN PURTARE PINA LA 10M,ASEZ.RAM
PA,TEREN-AUTO CT
-parapet metalic: 1575,36 kg
Cantitate= 1.600 TONA
56 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.=
KM.
-parapet metalic: 1575,36 kg
Cantitate= 1.600 TONA
57 TRI1AC15E2
DESCARCARE MAT.GR.C-AMBALATE,PESTE 100KG
DEP.PRIN PURTARE PINA LA 10M,ASEZ.AUTO-
RAMPA,TEREN CTG.
-parapet metalic: 1575,36 kg
Cantitate= 1.600 TONA
58 CL21A1
MONTAREA CONFECTIILOR METALICE DIVERSE I
NGLOBATE IN BETON
-conf. plansa:
-ancora A1: 33 buc.x0,77 m/buc.x3,850 kg/m= 97,83
-placa P1 : 33 buc.x0,25 m/buc.x1,96 kg/m = 16,17
-placa P2 : 33 buc.x0,25 m/buc.x2,94 kg/m = 24,26
-------------------------------------------------
TOTAL = 138,26 kg
Cantitate= 138.000 KG
59 6309886
CONFECTII METALICE INGLOBATE IN BETON
138,26 kg
Cantitate= 138.000 KG
CAP. E – RIGOLA PEREATA
60 TSA19E1
SAP.MAN.SANTURI SI RIGOLE PT.SCURGEREA A
PELOR RIGOLE TRIUNGHIULARE CU ADINC.<0,3
5M,T.TARE
100,00x[(0,15+0,57+0,72+1,00)x0,15+1,00x0,40/2]= 56,60
Cantitate= 57.000 M.C.
61 TRI1AA01C2
INCARCAREA MATERIALELOR,GRUPA A-GRELE SI
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN-A
UTO CATEG.2
-material din sapatura: 56,60x1,24x1,8= 126,33
Cantitate= 126.000 TONA
62 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.=
KM.
126,33
Cantitate= 126.000 TONA
63 IFB09A1
STRAT DRENANT GROSIME 5 CM DIN NISIP
100,00x(0,75+0,50+0,57+0,72)= 254,00
Cantitate= 254.000 MP.
64 IFA03C1
PEREU PLACI B 200 TURNAT IN CIMPURI 2 M
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10
CM.
100,00x(0,15+0,57+0,72+1,00)= 244,00
Cantitate= 244.000 MP.
65 2100957
BETON DE CIMENT B 200 STAS 3622
244,00x0,10= 24,40
Cantitate= 24.400 M.C.
66 TRA06A
TRANSPORTUL RUTIER AL BETONULUI-MORTARUL
UI CU AUTOBETONIERA DE 5,5 MC DIST.=
KM
-beton C 12/15 (B 200): 24,40x2,45= 59,78
Cantitate= 60.000 TONA
67 IFA07B1
ROSTUIRE PEREU DALE MORTAR CIMENT ADINC
4 CM SI NISIP PE REST ADINC. PT DALE 6 C
M.
4x100,00+(100,00:2,00)x(0,15+0,57+0,72+1,00)= 522,00
Cantitate= 522.000 M
68 CZ0204G1
PREPARARE MORTAR DE CIMENT PT.ZIDARIE M1
00-Z CU CIMENT M30 MANUAL FARA ADAOS VAR
522,00x0,00063= 0,33
Cantitate= .400 M.C.
69 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.=
KM.
-nisip: 244,00x0,052x1,35= 17,13
522,00x0,00095x1,35= 0,67
0,33x1,210x1,35= 0,54
--------------------------
TOTAL = 18,34
Cantitate= 18.000 TONA
70 TRA05A
TRANSPORT RUTIER MATERIALE,SEMIFABRICATE
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON.ET
C)PE DIST.DE
-apa: 244,00x0,030= 7,32
0,33x0,320= 0,11
------------------
TOTAL = 7,43
Cantitate= 7.000 TONA

Intocmit, Verificat,
A N T E M A S U R A T O A R E
CONSOLIDARE DRUM – DJ 100 H - JUGURENI
Km 9+040,00
PODET D=800 MM I-2
AC3998 PAG: 1
===============================================================
=NR. SIMBOL ART. CANTITATE UM =
= D E N U M I R E =
= A R T I C O L =
= =
===============================================================
01 TSA07C1
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU SPRI
J.SI EVAC.MAN.IN PAM.CU UMID.NAT.ADINC.0
,0-2M,T.TARE
-tub: 8,40x1,50x1,80= 22,68
22,68x80%= 18,14
-camera: 3,54x2,52x1,27+2,74x2,12x0,85= 16,27
18,14+16,27= 34,41
Cantitate= 34.400 M.C.
02 TSA07D1
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU SPRI
J.SI EVAC.MAN.IN PAM.CU UMID.NAT.ADINC.0
,0-2M,T.F.TARE
-tub: 22,68x20%= 4,54
Cantitate= 4.500 M.C.
03 TSA04C1
SAP.MAN.IN SPATII LIMIT.SUB 1M CU SPRIJ.
SI EVAC.MAN.IN PAM.CU UMID.NAT.LA ADINC.
0,0-1,5M T.TARE
-fudatii tub: 8,40x1,00x0,40= 3,36
-timpane 2x4,00x0,87x1,50= 10,44
------------
Total= 13,80
Cantitate= 14.000 M.C.
04 TSA04F1
SAP.MAN.IN SPATII LIMIT.SUB 1M CU SPRIJ.
SI EVAC.MAN.IN PAM.CU UMID.NAT.LA ADINC.
1,51-3M T.TARE
-timpane: 2x4,00x0,87x0,80= 5,57
Cantitate= 5.600 M.C.
05 TRB01C15
TRANSPORTUL MATERIALELOR CU ROABA PE PNE
URI INC ARUNCARE DESC RASTURNARE GRUP1-3
DISTANTA 50M
34,41+4,54+13,80+5,57= 58,32
58,32x20%= 11,66
11,66x1,24x1,8= 26,03
Cantitate= 26.000 TONA
06 TSD01C1
IMPRASTIEREA CU LOPATA A PAMINT.AFINAT,S
TRAT UNIFORM 10-30CM.GROS CU SFARIM.BULG.
TEREN TARE
11,66x1,24= 14,46
Cantitate= 14.500 M.C.
07 TRI1AA01C2
INCARCAREA MATERIALELOR,GRUPA A-GRELE SI
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN-AUTO CATEG.2
58,32x80%= 46,66
46,66x1,24x1,8= 104,15
Cantitate= 104.000 TONA
08 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM.
104,15
Cantitate= 104.000 TONA
09 TSF06B1
SPRIJ.MAL.CU DULAPI MET.ASEZ.ORIZ.,LAT.I
NTRE MAL.1,51-2,5M,LA ADINC.SUB 4M;0,21-
0,6M INTRE DULAP
-camera: 2x(1,27+0,85)x3,54= 15,01
-tub: 2x8,40x1,50= 25,20
-------------------------
Total= 40,21
Cantitate= 40.000 MP.
10 TSF05B1
SPRIJ.MAL.CU DULAPI MET.ASEZ.ORIZ.,LAT.I
NTRE MAL.<1,5M LA ADINC.SUB 4M; 0,21-0,6
M INTRE DULAPI
-fundatii tub: 2x8,40x0,40= 6,72
-timpane: 2x2x4x2,30 = 36,80
------------------
Total= 43,52
Cantitate= 44.000 MP.
11 PB02A1
TURNARE BETON SIMPLU B75 IN FUNDATII OBI
SNUITE,ZIDDE SPRIJIN PEREURI ETC.MANUAL
-Tub: 8,40x1,00x0,40= 3,36
-timpane: 2x4,00x0,87x0,80= 5,57
-camera: 2,74x2,12x0,50= 2,90
-dren tub: 2x8,40x(0,40+0,90)/2x0,25= 2,73
-dren camera: (3,54+2x2,12)x0,40x0,25= 0,78
------------------------------
Total= 15,34
Cantitate= 15.400 M.C.
12 PB06A1
TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI,Z
ID,TIMPAN MANUAL
-timpane:2x(0,30+0,87)/2x1,50x4,00-2x3,14x0,50x0,50x0,68= 5,95
-camera : 2,74x2,12x1,62-1,62/3x(1,5x1,5+1,82x2,14+)= 4,49
----------------------------------------------------------------
Total= 10,44
Cantitate= 10.500 M.C.
13 PB14A1
TURN. BET.ARMAT B200 IN PARAPET SI COMPLETARI
-cap timpane: 2x4,00x0,40x0,40= 1,28
Cantitate= 1.300 M.C.
14 2100945
BETON DE CIMENT B 150 STAS 3622
(15,34+10,44)x1,008= 25,99
Cantitate= 26.000 M.C.
15 2100957
BETON DE CIMENT B 200 STAS 3622
1,28x1,008= 1,29
Cantitate= 1.300 M.C.
16 TRA06A
TRANSPORTUL RUTIER AL BETONULUI-MORTARUL
UI CU AUTOBETONIERA DE 5,5MC DIST. = KM
25,99x2,46 = 63,94
1,29x2,47 = 3,19
------------------
Total= 67,13
Cantitate= 67.000 TONA
17 PC02A1
COFRAJE PT.BETON ELEVATIE SI ZIDURI SPRI
J.DIN PANOURI CU PLACAJ P CU SUPRAFETE PLANE
-timpane: 2x(4,00x1,50+4,00x1,60+2x1/2(0,30+0,87)x1,50-
-2x3,14x0,50x0,50)= 25,17
-camera: 2x1/2x(1,50+1,82)x1,65+1/2x(1,50+2,14)x1,65+
+2,74x1,27+2x2,12x1,27= 17,35
-------------------------------------------------------------
Total= 42,52
Cantitate= 43.000 MP.
18 PC04A1
COFRAJE PANOU. PLACAJ P PT. B. A. SUPRA.
POD. CU GRINZI DREPTE,PLATELAJE B. A.,CHESOANE,PARAPET
-cap timpane: 2x2x(4,00x0,40+0,40x0,40)= 7,04
Cantitate= 7.000 MP.
19 CZ0302G1
CONFECT ARMAT PT PERETI GRINZI STILPI DI
AFRAGME LACONST OBIS IN ATELIERE SANTIER OB 37 D=6-8MM
-cap timpane: Ø 8 mm
2 timpane x17 buc./timpan x1,30 m/buc x0,396 kg/m= 17,50 kg
Cantitate= 18.000 KG
20 CZ0302H1
CONFECT ARMAT PT PERETI GRINZI STILPI DI
AFRAGME LACONST OBIS IN ATELIERE SANTIE
R OB 37 D=10-16M
-cap timpane: Ø 12 mm
2 timpane x 4,00 buc/timpan x 4,10 m/buc. x 0,888 kg/m= 29,13 kg
Cantitate= 29.000 KG
21 PD02A1
MONT.ARMATURI PT.BETON ARMAT IN SUPRASTR
UCTURA PODURILOR BOLTITE IN ARC SI PARAP
ET
17,50+29,13= 46,63
Cantitate= 47.000 KG
22 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM.
-armaturi furnizor-atelier: 46,63x1,015= 47,33 kg
Cantitate= .050 TONA
23 TRI1AC01E2
INCARCARE MAT.GR.C-AMBALATE,SUB 10KG,DEP
LAS.PRIN PURTARE PINA LA 10M,ASEZ..RAMPA,
TEREN-AUTO CTG.
-armaturi: 46,63 kg
Cantitate= .050 TONA
24 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM.
-armaturi atelier-lucrare: 46,63 kg
Cantitate= .050 TONA
25 TRI1AC12E2
DESCARCARE MAT.GR.C-AMBALATE,SUB 10KG DE
PLAS.PRIN PURTARE PINA LA 10M,ASEZ..AUTO
-RAMPA,TEREN CTG
-armaturi: 46,63 kg
Cantitate= .050 TONA
26 6420680
TUB CANAL.BUCOV D= 800 S 6315
3 buc.
Cantitate= 3.000 BUC.
27 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM.
-tuburi Ø 800 : 3 buc. x 2,16 t/buc.= 6,48
Cantitate= 6.500 TONA
28 PI06C1
MONTAREA ELEM.PREF.DIN BETON ARMAT CU MA
CARAUA PE PNEURI DE 20-29,9 TF
-incarcare teava metal= 1 buc.
-descarcare in depozit= 3 buc.
-montare = 3 buc.
--------------
Total= 7 buc.
Cantitate= 7.000 BUC.
29 AUT1106
ORA PR MACARA PE PNEURI CU BRAT CU ZABRE
LE 20,0-29,9 TF 1 SCHIMB
-deplasare macara:
-incarcare teava: 2x4 ore= 8 ore
-descare tuburi : 2x4 ore= 8 ore
-montare tuburi : 2x4 ore= 8 ore
----------------
Total= 24 ore
Cantitate= 24.000 ORA
30 PF05A1
HIDROIZOLATII LA LUCRARI DE ARTA DIN BIT
UM FILERIZAT APLICATA LA RECE IN DOUA ST
RATURI
-tub: 8,40x3,14x0,50+2x8,40x0,25= 17,39
-timpane: 2x(4,00x1,35-1/2x3,14x0,50x0,50-0,25x1,00)= 9,52
------------------
Total= 26,91
Cantitate= 27.000 MP.
31 SB16E1
TEAVA PVC-U NEPLASTIF.PT.CANALIZARE,MONT
.APARENT IN NISA,INGROP.PAMINT,SUSPEND.P
LANSEU,CU D=110
-barbacane:
timpane: 2 timpane x2 buc./timpan x 0,80 m/buc.= 3,20
camera: 4 buc x0,70 m/buc.= 2,80
------------------------
Total= 6,00
Cantitate= 6.000 M
32 PE01D1
ZIDARIE USCATA IN DREN.LA CULEI SI ZID.S
PRIJ.DIN BOLOVANI DE RIU
-dren tub: 8,40x1,80x0,50-1/2x3,14x0,5x0,50+2x8,40x0,40x0,25= 8,85
-dren camera: (3,54+2x2,12)x0,40x1,02= 3,17
-------------------------------------------------------------------
Total= 12,02
12,02x2/3= 8,01
Cantitate= 8.000 M.C.
33 PE02D1
UMPLUTURA DE PIATRA IN CHESOANE,CASOAIE SPARG.DIN BALAST
12,02x1/3= 4,01
Cantitate= 4.000 M.C.
34 DA06A1
STRAT AGREG NAT(BALAST)CILINDR CU FUNCT
REZIST FILTRANT IZOL AERISIRE ANTCAP CU ASTERNERE MANUAL
-umplutura peste tuburi: 9,64x1,80x0,50= 8,68
Cantitate= 9.000 M.C.
35 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM.
-bolovani de rau: 8,01x1,13x1,6= 14,48
Cantitate= 15.000 TONA
36 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM.
-balast: 4,01x1,145x1,7= 7,81
8,68x1,311x1,7= 19,35
----------------------
TOTAL = 27,16
Cantitate= 27.000 TONA
37 TRA05A
TRANSPORT RUTIER MATERIALE,SEMIFABRICATE
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON.ETC)PE DIST.DE
-apa: 4,75
Cantitate= 5.000 TONA
38 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM.
-materiale: 0,51
Cantitate= 0.500 TONA

Intocmit, Verificat,
A N T E M A S U R A T O A R E
CONSOLIDARE DRUM – DJ 100 H - JUGURENI
Km 9+040,00
REFACERE SISTEM RUTIER I-3
(RANFORSARE SISTEM RUTIER)
L = 120,00 m; l = 6,00 m; S = 120,00x6,00= 720,00 mp
AC3408 PAG: 1
===============================================================
=NR. SIMBOL ART. CANTITATE UM =
= D E N U M I R E =
= A R T I C O L =
= =
===============================================================
01 DH09XD1
CURATIREA MANUALA A SUPRAFETELOR DE ASFA
LT IN VEDEREA APLICARII IMBRACAMINTII AS
FALTICE
2x720,00= 1440,00
1440,00:10= 144,00
Cantitate= 144.000 10 MP.
02 DB02D1
AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST
IN VEDER APLIC STRAT UZ MIX ASF CU EMUL
SIE CATIONICA
2x720,00= 1440,00
1440,00:100= 14,40
Cantitate= 14.400 100 MP.
03 TRA05A
TRANSPORT RUTIER MATERIALE,SEMIFABRICATE
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON,ET
C) PE DIST DE
-emulsie cationica: 14,40x45,500 kg/100 mp= 655,20 kg
Cantitate= 0.700 TONA
04 TRA05A
TRANSPORT RUTIER MATERIALE,SEMIFABRICATE
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON.ET
C)PE DIST.DE
-apa: 14,40x0,045= 0,65
Cantitate= 0.700 TONA
05 DB12A1
STRAT LEGAT BINDER DE CRIB EXEC LA CALD
CU ASTERNERE MANUALA
720,00x0,06x2,37= 102,38
-spor: 720,00x0,010= 7,20
--------------------------
TOTAL = 109,58
Cantitate= 110.000 TONA
06 2600249
@BETON ASFALTIC (BINDER) BAD 25
109,58x1,003= 109,91
Cantitate= 110.000 TONA
07 DB16D1
IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA
CALD IN GROS DE 4,0CM ASTERN MANUALA
720,00
Cantitate= 720.000 MP.
08 2600246
@BETON ASFALTIC (BA 16)
720,00x0,094= 67,68
Cantitate= 68.000 TONA
09 2600248
@NISIP BITUMAT (DRESSING)
720,00x0,003= 2,16
Cantitate= 2.200 TONA
10 TRA01A
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF
ABRICATELOR CU AUTOBASCULANTA PE DIST.=
KM.
-beton asfaltic BA 16 = 68,00
-binder de cribl. BAD 25= 110,00
-dressing gras = 2,20
-------------------------------
TOTAL = 180,20
Cantitate= 180.000 TONA

Intocmit, Verificat,