2019 IEEE PES Innovative Smart Grid Technologies Asia

Analysis of Influence Factors on the Transmission


Capability of the Yu-e Back-to-back VSC-HVDC
South Channel
Xiaodong Yu, Tangze Yang, Kan Cao, Defu Cai, Li Wan, Kunpeng Zhou, Ying Wang, Raoyu Ze
Electric Power Research Institute
State Grid Hubei Electric Power Co,Ltd
Wuhan, Chian
a921125@126.com

Abstract—Yu-e back-to-back VSC-HVDC networking project is the connection between Central China and Southwest power
the first VSC-HVDC networking project whose voltage and grid is going to change from synchronous to asynchronous,
capacity is up to±420kV and 5000MW. Currently, it is the which would weaken the electrical link between Hubei power
VSC-HVDC project of highest voltage and largest capacity in grid and other three Central China power grid , and inertia of
the world which realizes the asynchronous networking between Central China power grid will decrease. Thus, this project will
Southwest and Central China power grid and guarantees the
have a great impact on stability characteristics of Hubei power
safety of hydropower delivery between these two power grids.
However, it may cause the units of Enshi and Three Georges grid. When Southwest grid transfers power to Central China
power plant unstable when power is transmitted from Southwest grid through the south channel, it may cause the Enshi
power grid to Central China power grid through Yu-E back to hydropower unit and the Three Gorges power plant to lose
back VSC-HVDC project. In view of the problems above, this transient stability which would endanger the security and
paper studies the influence of the nearby Yihua HVDC stability of the power grid。
transmission power, the up-delivery power of 500kV Enshi main
transformer and output of the adjacent hydropower plant on At present, researches at home and abroad mainly focus
transmission capability of Yu-E back-to-back VSC-HVDC on the theoretical study of grid stability with a single VSC-
system. HVDC project. For example, in reference [2] the modal
analysis and sensitivity analysis methods are used to study the
Index Terms—VSC-HVDC, Networking project, Transient system stability, and the small signal model of VSC-HVDC is
stability, Up-delivery power delivery, Hydropower output adopted to solve the problem. In reference [3], the detailed
transient model of the DC cable in VSC-HVDC system and
I. INTRODUCTION the converter station’s decoupling control models are
established. At the same time, the influence of the control
The Yu-E back-to-back VSC-HVDC project connecting
parameters on the system stability is verified by simulation in
Southwest and Central China power grid is planned to put into
this article. In references [4-5], the VSC-HVDC input
operation in 2018 by State Grid Corporation of China
admittance model and the grid impedance model are
(SGCC). It is the first ±420kV VSC-HVDC project in China,
established, and the impedance stability analysis method is
whose transmission power capacity is 5000MW[1]. This
applied to analyze the system stability. The control strategies
project has the highest voltage level and the largest
to improve stability are proposed in these references, too. In
transmission power capacity in the world, containing north
all of the references above, the mathematical model of the
and south channel in Yichang and Enshi, respectively. The VSC-HVDC system is adopted to study the system stability.
south channel is built in 500kV Shizhou station which is However, as the scale of the AC system near VSC-HVDC
accessed to Hubei power gird in the middle of 500kV
inreases, the complexity of mathematical modeling also
Zhangjiaba-Enshi AC line and located in XianFeng County,
increases exponentially, which may give a rise to the difficulty
Enshi Prefecture, Hubei Province. It is adjacent to 500kV
in solving this problem.
Enshi main transformer, Yihua HVDC and Shuibuya power
plant. However, the applecation scenery of Yu-E back-to-back
VSC-HVDC networking project is complicated in the actual
Hubei power grid will be subjected to 5000MW power power grid. The power transmission stability is coupled with
after the operation of back-to-back VSC-HVDC project. The the up-delivery power of 500kV Enshi main transformer, the
pressure of power flow evacuation in the Three Gorges area
Yihua HVDC transmission power and the output of the
will increase when power flow of West to East power
adjacent Shuibuya hydropower plant. Thus, the model
transmission section in Hubei power grid increase. In addition,

Project Supported by State Grid Corporation of China(52200018001)


Project Supported by State Grid Corporation of Hubei(5215321700W)

978-1-7281-3520-5/19/$31.00 ©2019 IEEE 291

Authorized licensed use limited to: Intel Corporation via the Virtual Library. Downloaded on December 22,2020 at 07:06:49 UTC from IEEE Xplore. Restrictions apply.
complexity is too high to adopt theoretical analysis method to The 500kV Enshi station is connected with the 220kV
solve the system stability by establishing its mathematical power grid through the 500kV/220kV transformer. Since a
model. In this article, the influencing factors of the power large number of small hydropower units are set in 220kV
transmission capacity of Yu-e back-to-back VSC-HVDC Enshi power grid, hydropower would be up-delivered to
networking project is studies based on the PSASP, using time 500kV power grid through the main transformer during the
domain simulation methhod. flood season.
II. BASIC INFORMATION OF YU-E BACK- TO-BACK VSC- The 500kV Enshi Station is connected to the 500kV
HVDC PROJECT Yuxia Station through three 500kV AC lines, and the
Shuibuya Power Plant (4×460MW) delivers power to the
A. The VSC-HVDC Yuxia Station through the 500kV two 500kV AC lines.
It is necessary to implement Southwest power grid and The 500kV Yidu Station is connected to Yuxia Station
Central China power grid asynchronous networking. The through a short single 500kV AC line. It is connected to the
asynchronous networking can bring many advantages, such as Three Gorges Right Second Power Plant through three 500kV
achieving the reasonable consumption of seasonal hydropower AC lines, and sent hydropower to the Shanghai Power Grid
in Chongqing and Sichuan province, giving full play to the through ±500kV Yihua DC (3000MW).
power transmission line capacity, optimizing AC power
system structure, improving the controllability of power grid
operation and reducing the risk of security and stability
operation of power grid.
The construction of Yu-E back-to-back VSC-HVDC
project can build Southwest synchronous power system, which
covers Sichuan, Chongqing and Tibet power grid. This project
can realize asynchronous networking between Southwest and
Central China power grid, as shown in Figure.1. This project
can also reduce the short-circuit current in Three Gorges area.

Figure 2. The AC power grid adjacent to the south channel of the Yu-E
back-to-back VSC-HVDC

III. INITIAL VOLTAGES AND POWER FLOW


Considering that the up-delivery power of Enshi main
transformer is 100MW, the units of Shuibuya hydropower
plants is of full power functon (4×460MW), the power of
VSC-HVDC south channel is 800MW (the control mode is
fixed reactive power control), and the power of Yihua HVDC
is 2500MW, the voltages of nearby 500kV stations and the
power flow of nearby 500kV AC lines is as shown in Table1
and 2.

TABLE I. THE VOLTAGES OF NEARBY 500KV STATIONS

Station 1 2 3 4

Voltage 524kV 517kV 519kV 502kV


Figure 1. The Southwest and Central China power grid
Station Three Gorges plant Shuibuya plant
The converter unit of this project adopts symmetrical Voltage 524kV 519kV
unipolar connection. Each station has 2 converter units. The
capacity of converter unit is 1250MW, and its DC voltage is ± TABLE II. THE POWER FLOW OF NEARBY 500KV AC LINES
420kV, which are the first in the world. The converter valve
uses half-bridge modular multi-level scheme and adopts water Station 2-3 Shuibuya plant-3
cooling. The valve tower installs by grounding support way.
Power flow 1892MW-j369Mvar 1840MW+398Mvar
B. The adjacent AC power grid
Station Yidu-4 3-4
The AC power grid adjacent to the south channel of the
Yu-E back-to-back VSC-HVDC system is shown as Figure 2. Voltage 2329MW+j11Mvar 3245MW+j40Mvar

292

Authorized licensed use limited to: Intel Corporation via the Virtual Library. Downloaded on December 22,2020 at 07:06:49 UTC from IEEE Xplore. Restrictions apply.
It can be seen from Table I and II above that the voltage Considering that the up-delivery power of Enshi main
of Xinglong station is nearly 500kV, and the power emerging transformer is 100MW, the units of Shuibuya hydropower
in Xinglong station is very heavy, which means the N-1 and plants is of full power functon (4×460MW), the power of
N-2 faults occurring around Xinglong station may cause VSC-HVDC south channel is 800MW (the control mode is
instabilities in power system. fixed reactive power control). When the power of Yihua
HVDC is 3000MW and 2500MW, the voltages of 500kV
IV. ANALYSIS OF INFLUENCE ON POWER TRANSMISSION
stations and the power angle curves of the Enshi and Three
CAPACITY OF YU-E BACK-TO-BACK VSC-HVDC SOUTH
Gorges units after the N-1 faults in Yuxia-Xinglong lines are
CHANNEL
shown in the Figure.3-4 above. Because the curves of 500kV
The Yuxia power transmission channel consists of the buses and power angle have the similar characteristics, the
three Yuxia-Xinglong AC lines and the short single Yuxia- specific names are not marked in the figures.
Yidu AC line. The heavy power flow of Yuxia power It can be seen from Figure. 3-4, when the power of Yihua
transmission channel will cause the voltage of nearby 500kV HVDC reduces, the reduced power will be transferred to the
stations low. At this time, if the N-1 and N-2 faults occur in Yuxia power transmission channel, which will increase the
Yuxia-Xinglong AC lines, the voltage of nearby 500kV system stability risk. It is necessary to reduce the power
stations will further reduce, which may cause the transient transmission of Yu-E back-to-back VSC-HVDC south
stability of Enshi and the Three Gorges units to the main channel or take other measures to reduce the power flow of
network to be lost. Yuxia power transmission channel to improve the safety and
A. The influence of Yihua HVDC power stability of the system.
When the power of Yihua HVDC reduces, the reduced
power will be transferred to the Yuxia power transmission 1.200

channel, which will increase power flow evacuation pressure, 1.000


resulting in a decrease in the voltage of the 500skV station in
the near area. When the N-1 and N-2 faults in Yuxia-Xinglong 0.800

lines occur, it may give a rise to transient problems of Enshi


0.600
and Three Gorges units.
1.200
0.400

1.000 0.200

0.000
0.800 0.00 5.00 10.00 15.00 20.00
Time(s)

0.600
(a) Voltages of 500kV stations near the Yu-e Back-to-back VSC- HVDC
South Channel
100000.000
0.400

80000.000
0.200

60000.000
0.000
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
Time(s)
40000.000
(a)Voltages of 500kV stations near the Yu-e Back-to-back VSC- HVDC
South Channel
20000.000
100.000

80.000
0.000

60.000

-20000.000
40.000 0.00 5.00 10.00 15.00 20.00
Time(s)
20.000
(b)Power angle of the Enshi and Three Gorges units
0.000
Figure 4. The voltages and the power angle curves with 2500MW Yihua
-20.000 HVDC
-40.000
B. The influence of up-delivery power of 500kV Enshi main
-60.000
transformer
-80.000
0.00 2.00 4.00 6.00 8.00 10.00
Time(s)
12.00 14.00 16.00 18.00
During the flood season, the increase of the up-delivery
(b)Power angle of the Enshi and Three Gorges units power of 500kV Enshi main transformer will bring difficulty
in power flow evacuation of the Yuxia power transmission
Figure 3. The voltages and the power angle curves with 3000MW Yihua
HVDC channel. When up-delivery power of 500kV Enshi main

293

Authorized licensed use limited to: Intel Corporation via the Virtual Library. Downloaded on December 22,2020 at 07:06:49 UTC from IEEE Xplore. Restrictions apply.
transformer is heavy, the N-1 and N-2 faults in Yuxia- is 2500MW, when the Shuibuya hydropower plant only has
Xinglong lines will cause the transient stability problems of one unit operating (1×460MW), the voltages of 500kV
the Three Gorges and Enshi units. stations in the near area and the power angle curves of the
Enshi and Three Gorges units after the N-1 faults in Yuxia-
Considering that the up-delivery power of Enshi main Xinglong lines are shown in the Figure.6 below.
transformer is 50MW, the units of Shuibuya hydropower
plants is of full power functon (4×460MW), the power of It can be seen from Figure. 4 and 6 that when the up-
VSC-HVDC south channel is 800MW (the control mode is delivery power of 500kV Enshi main transformer increases,
fixed reactive power control), and the power of Yihua HVDC the pressure of power flow evacuation in the near area
is 2500MW, the voltages of 500kV stations and the power increases, too. The power of Yu-E back-to-back VSC-HVDC
angle curves of the Enshi and Three Gorges units after the N-1 should be reduced to keep the grid safe and stable.
faults in Yuxia-Xinglong lines are shown in the Fig.5 below. Furthermore, when the output of Shuibuya hydropower
1.200
plant is less than 460MW or the up-delivery power of 500kV
Enshi main transformer is less than 0 MW, the transmission
1.000
capacity of Yu-E back-to-back VSC-HVDC is not limited by
transient stability when N-1 and N-2 faults occur in Yuxia-
0.800
Xinglong line.
1.200
0.600

1.000
0.400

0.800
0.200

0.600
0.000
0.00 5.00 10.00 15.00 20.00
Time(s)
0.400
(a) Voltages of 500kV stations near the Yu-e Back-to-back VSC- HVDC
South Channel
80.000 0.200

60.000
0.000
0.00 5.00 10.00 15.00 20.00
Time(s)
40.000

(a) Voltages of 500kV stations near the Yu-e Back-to-back VSC- HVDC
20.000
South Channel
100.000
0.000

80.000
-20.000
60.000
-40.000
40.000

-60.000
20.000

-80.000
0.00 5.00 10.00 15.00 20.00 0.000
Time(s)
-20.000
(b)Power angle of the Enshi and Three Gorges units
-40.000
Figure 5. The voltages and the power angle curves with 50MW up-delivery
power of Enshi main transformer -60.000

-80.000
It can be seen from Figure. 4-5 that when up-delivery 0.00 5.00 10.00
Time(s)
15.00 20.00

power of 500kV Enshi main transformer is 50MW increases, (b)Power angle of the Enshi and Three Gorges units
the pressure of power flow evacuation in the near area
Figure 6. The voltages and the power angle curves with 1×460MW
increases, too. The power of Yu-E back-to-back VSC-HVDC Shuibuya hydropower output
should be reduced to keep the grid safe and stable.
C. The influence of Shuibuya Hydropower output V. CONCLUSION
As the Shuibuya hydropower output will occupy the Yuxia It can be seen from the simulation results above that when
power transmission channel, when the Shuibuya Hydropower the power flow evacuation pressure of Yuxia power
output increases, the grid security and stability risks will transmission channel increases, the voltages of the 500kV
increase, too. stations in the near area become lower, which will easily cause
Considering that the up-delivery power of Enshi main Enshi and the Three Gorges units unstable to the main grid
transformer is 100MW, the power of Yu-E back-to-back after the N-1 and N-2 faults in Yuxia-Xinglong lines.
VSC-HVDC south channel is 800MW (the control mode is
fixed reactive power control), and the power of Yihua HVDC

294

Authorized licensed use limited to: Intel Corporation via the Virtual Library. Downloaded on December 22,2020 at 07:06:49 UTC from IEEE Xplore. Restrictions apply.
Thus, the reduction of Yihua's HVDC power, the increase
of the up-delivery power of 500kV Enshi main transformer [1] Panxiaojie,etc, Operation characteristic analysis of Central China
and the increase of Shuibuya hydropower output, which will Power Grid in unsynchronized interconnection of Chongqing and
Hubei Power Grid. Power System Protection and Control.
increase the difficulty of the power flow evacuation in Yuxia Vol.44,No.19, Oct.1.2016, Pp157-162.
power transmission channel, will make the grid’s safety and [2] Li G, Sun Y, Wu X. VSC-HVDC Stability Analysis and Control
stability greatly reduced. Parameter Setting[J]. Transactions of China Electrotechnical Society,
2017, 32(6):231-239.
In order to ensure the supporting role of Yu-E back-to- [3] Chaudhuri N R, Majumder R, Chaudhuri B, et al. Stability Analysis of
back VSC-HVDC networking project in the asynchronous VSC MTDC Grids Connected to Multimachine AC Systems[J]. IEEE
networking between Central China and Southwest power grid, Transactions on Power Delivery, 2011, 26(4):2774-2784.
[4] Jian S. Impedance-Based Stability Criterion for Grid-Connected
measures should be taken to control the power flow of Yuxia Inverters[J]. IEEE Transactions on Power Electronics, 2011,
power transmission channel to improve the grid’s safety and 26(11):3075-3078.
stability. [5] Turner R, Walton S, Duke R. A Case Study on the Application of the
Nyquist Stability Criterion as Applied to Interconnected Loads and
REFERENCES Sources on Grids[J]. IEEE Transactions on Industrial Electronics, 2013,
60(7):2740-2749.

295

Authorized licensed use limited to: Intel Corporation via the Virtual Library. Downloaded on December 22,2020 at 07:06:49 UTC from IEEE Xplore. Restrictions apply.

S-ar putea să vă placă și