S. Sankaran [Monday, January 28, 2002 8:30 PM]
Krishnamurthy Pandurangan [Tuesday, January 29, 2002 12:03 PM]
Sunil Mahto [Tuesday, January 29, 2002 2:40 PM]
Ramakanth Ingle [Monday, January 28, 2002 3:24 PM]
Jitendra K Bothara [Tuesday, January 29, 2002 12:00 PM]
Subhamoy Kar [Tuesday, January 29, 2002 12:14 PM]
Vidyut Gandhi [Tuesday, January 29, 2002 6:53 PM]
C.V.R. Murty [Wednesday, January 30, 2002 12:32 AM]
Jitendra K Bothara [Wednesday, January 30, 2002 1:10 AM]
Jitendra K Bothara [Wednesday, January 30, 2002 3:19 AM]
R Rathi [Wednesday, January 30, 2002 11:09 AM]
Alpa Sheth [Wednesday, January 30, 2002 1:05 PM]
Alpa Sheth [Wednesday, January 30, 2002 4:36 PM]
C.V.R. Murty [Wednesday, January 30, 2002 7:29 PM]
Sunil Mahto [Thursday, January 31, 2002 9:41 AM]
Durgesh C. Rai [Thursday, January 31, 2002 2:55 PM]
T.K. Ghosh [Thursday, January 31, 2002 3:18 PM]
Prachee Dhavlikar [Thursday, January 31, 2002 7:16 PM]
Rupen Goswami [Thursday, January 31, 2002 8:04 PM]
Dipak Shah [Friday, February 01, 2002 8:31 AM]
Subhamoy Kar [Friday, February 01, 2002 6:06 PM]
Arvind Jaiswal [Friday, February 01, 2002 11:19 PM]
Arvind Jaiswal [Saturday, February 02, 2002 8:55 PM]
Ramesh P. Singh [Sunday, February 03, 2002 10:49 PM]
Prakash kadam [Sunday, February 03, 2002 4:28 PM]
Arvind Jaiswal [Sunday, February 03, 2002 10:22 PM]
S.P. Srinivasan [Sunday, February 03, 2002 9:02 PM]
T.K. Ghosh [Monday, February 04, 2002 12:01 PM]
D B Joshi [Monday, February 04, 2002 6:01 PM]
S.P. Srinivasan [Monday, February 04, 2002 9:30 PM]
S.P. Srinivasan [Monday, February 04, 2002 9:36 PM]
Chinmay Gorantiwar [Monday, February 04, 2002 10:24 PM]
Pramod Sahasrabuddhe [Tuesday, February 05, 2002 12:34 AM]
Arun Bhalaik [Monday, February 04, 2002 10:12 AM]
Durgesh Rai [Tuesday, February 05, 2002 11:53 AM]
M. Hariharan [Tuesday, February 05, 2002 8:40 PM]
C. Ravi Kumar [Tuesday, February 05, 2002 11:18 PM]
Arvind Jaiswal [Wednesday, February 06, 2002 10:04 AM]
Reji Zachariah [Wednesday, February 06, 2002 4:40 PM]
Gopal [Wednesday, February 06, 2002 6:34 PM]
Hiren Desai [Wednesday, February 06, 2002 9:29 PM]
S.P. Srinivasan [Thursday, February 07, 2002 8:42 AM]
Jitendra K Bothara [Thursday, February 07, 2002 11:31 AM]
S.P. Srinivasan [Thursday, February 07, 2002 12:45 PM]
Vinay Gupta [Thursday, February 07, 2002 4:40 PM]
Vinay Gupta [Thursday, February 07, 2002 4:41 PM]
Dear All
3. If we need only elastic response should we take R=1 irrespective of material and type of
construction? This needs clarity. The forces may be higher but the initial shape of the
stucture is recoverable. This may be important in some sensitive structures which are
deflection dependent. Regards. Good going indeed.
s.sankaran
dear organizers,
3.clause 3.12 says that the soil should not lose strength , but is not the actual situation and in
sandy soils liquification may occur and the code is silent in these situations
4.appendix clause F3.1 the damping factor given for materials is not specific and the ranges
given may generate wide range of seismic forces and hence we suggest that the damping
factor should be more specific.
5.clause 3.1 value of elastic modulus for dynamic analysis may not be correct
6.In figure 2, average acceleration spectra , max value of natural period of vibration in
seconds is maximum of 3.0 and in our view the natural period of buildings may go above 3.0 .
in this case the chart needs modifications
7.in article 5 for elevated buildings, the water tanks are assumed to be single degree of
freedom structures.
8.in article 5.2.4 full or empty conditions of checking of water tanks is specified. is that
sufficient
9. in the article 5.2.3 the explanation given for the calculation of defections is not clear
10.In clause 4.2.1 c> building height greater than 40 is given we suppose that it should be
greater than 90.
11. in figure 5A , the figure given is for the building and it would be better that a three
dimensional drawing is given or the title may be changed to building instead of frame to
avoid ambiguities.
Krishnamurthy
Sir,
Please accept my good wishes for this wonderful idea of an e-conference on earthquake
engineering/ codes.
1. As most of us are aware, the provisions of IS:13920 for ductile detailing are the same for
all Zones where ductile detailing is applicable. Would it not be more logical to have a less
stringent requirement for the zones with lesser seismic coefficient? Ductile detailing
increases reinforcement consumption by about 20 - 30 % which is considerable.
2. What is the ductility level (in terms of ratio) sought to be achieved by the specified
recommendations?
3. It is to be noted that the IS:1893-1984 is under revision. The draft itself, is constantly
undergoing revisions and difference of opinion between experts still persist. In such a
scenario, it is not advisable to adopt the draft for design purpose unless and until the
revisions are accepted and formally incorporated. Moreover designers will be facing the
problem of having to redesign everytime a draft code is revised. A distinction has to be made
and understood especially between research and actual project execution which have many
other constraints such as cost and time.
4. In my opinion, based on reports of the recent Bhuj earthquake, structures which were
designed as per the existing IS codes suffered minimal damage. Therefore more than
anything else, the engineering community should pressure the authorities for strict
compliance to and enforcement of Indian Standards wherever applicable. Any amount of
research and technical deliberations will not be fruitful unless allout effort is made for
ensuring that recommendations are not flouted.
SUNIL MAHTO
Sir,
I have following few querries:
1. The locations of the tie beams shall be specified in the code. In case of hard soil, the
distance between footing top nad plinth beam may not be more than 1.5m. Whether the
plinth beams can be considered as tie beams?
2. Draft code suggest number of modes to be used in the analysis should be such that sum of
total modal mass of all the modes considered is at least 90% of the total mass. What to do
with the balance mass? The balanced mass may be considered as static correction to total
response. Code is sailent about this.
3. The clause regarding to e = 1.5 esi +/- 0.05 bi is applicable to all buildings i.e. symmetric
and unsymmetric or not. In case of sym bldgs whether e = 0.05 bi shall be considered or not,
being 0.05bi as accidental eccentricity.
4. In many softwares, we can supply the actual mass centre and stiffness centre is evaluated
by software, whether torsion correction given in code is still required to do in this case or not?
Enough for today
Regards
Dr R K Ingle
Hi,
It is in response to quary from Dr. Ingle,
Of course, different code requires the addition (+/-) of accediantle eccentricity over the
calculated one. Even though we "calculate" mass centre and stiffness centre manually or by
computer there remains many uncertainties associated with these centers. Some are actual
stiffness distribution, different degree of stiffness degradation of laterl force resisting system
during the inelastic response of the building, variation in material property, distribution of
mass etc. There also remains uncertainty in tortional ground motion.
Jitendra K Bothara
Hello...
This is in continuation with the mail from Dr. R K Ingle included below. I have a humble
clarification about point no. 2 of the mail.
Also, it is to be noted that once 90% mass participation is achieved, the higher modes will
have appreciable effect on the response of the structure. For example, if the total mass
participation at 'n' th mode is 90% and at 'n+1' th mode is 95% (it is never so high!), then we
can say 5% mass participation is contribution of 'n+1' the mode. But as a result of this, the
combined response of the structure calculated by SRSS method is given by SQRT(90^2+5^2)
= 90.138. So, the increase in total structural response is marginal. This is occurring due the
reason that modal responses are not combined by absolute summation and instead a total
statistical response (SRSS or CQC) is determined and used in structural analysis.
Sir,
at the end of clause 7.8.1 ( IS-1893 ) there is a note that for irregular buildings lesser than
40meters in height Dynamic analysis is recommended.
It means that even in town where normal building does not go beyond 30 mt.
& irregularities exists both in plan & elevation ; Dynamic analysis should be preferred. is
there any way to design by static method by making some corrections? Dynamic anlysis in
underdeveloped region will be a costly affair.
what do you suggest?
vidyut gandhi
1. Would it not be more logical to have a less stringent requirement for the zones with lesser
seismic coefficient?
Yes... absolutely desirable!! But, the Indian seismic design scenario is still in its nascent stage.
We need to get comfortable with
(b) Good Basic Seismic Design (with Seismic Coefficient Method to begin with), in that order.
Then, we can have an Indian Code that will have more than one type of ductile detailing.
Ductile detailing increases reinforcement consumption by about 20 - 30 % which is
considerable.
Is this % of the "structure alone" or of the "structure plus finishes"? Some say the "structure
alone" costs only 30% of the whole. We need many consultants to speak up their numbers,
and only then we will know if the additional cost of providing seismic resistance is indeed
considerable!! Hope other consultants will also give their experiences.
2. What is the ductility level (in terms of ratio) sought to be achieved by the specified
recommendations?
An overall structure ductility of 4-6 will be the ideal situation. But, we need to do a large
number of experiments on prototype structures/subassemblages designed with Indian
seismic code and understand the ductility that can be achieved. The limited experience in
our laboratory at IIT Kanpur with RC beam-column joint sub-assemblages
designed with IS:13920 detail shows that it is around 6-8 (some details in ICJ, Vol.75, No.4,
April 2001).
But, the "overall structure ductility" with this "subassemblage ductility" will be smaller. More
work needs to be done to know how much "overall structure ductility" will be available.....
An addition::
The structures are being built by the "engineering community" and not the "authorities". So,
why pressure authorities....., why not itself first? ....... The issue is not "engineering
community" VERSUS "authorities"....!!
which may not be safe. Thus, owners with the assistance of authorities
must ask for safe structures first and economical ones later.......
c.v.r.murty
Dear Friends,
1. I agree with Prof. Murty about the nascent stage of aseismic design and construction so
major thrust should e on consolidation of it.
Jitendra K Bothara
Dear friends, let me do some more clarification that I missed in last mail. According to my
experience, additional cost for eathquake resistance of up to 3 storey RC framed building
comes out something like 10% over the normal construction cost. In case of masonry
building with brick in cement mortar and RC floor and roof slab it comes around 5-6% if
detailed according to Indian Standard. Of course I am talking of structural costs only
(excluding finishing cost) and ordinary residential buildings with span in the range of 3-5m.
Jitendra K Bothara
Congratulations to NICEE (IIT Kanpur) and every body for this very educative e-conference.
I have a query on the Parameter for Soil Profile Type SA to SF as defined in UBC 97 - Table
16 J. A similar parameter Sa/g is being suggested in 1893 draft code to account for the Soil
profile type. Are these parameters totally independent of the foundation system? If so, is
there any other parameter to account for the different foundation systems like isolated
footings, raft , pile foundations etc in calculating Design Base Shear for the structure?
Regards
R Rathi
Murty,
>1. Would it not be more logical to have a less stringent requirement for the zones with
lesser seismic coefficient?
> Yes... absolutely desirable!! But, the Indian seismic design scenario is still in its nascent
stage. We need to get comfortable with
> (b) Good Basic Seismic Design (with Seismic Coefficient Method to begin with), in that
order. Then, we can have an Indian Code that will have more than one type of ductile
detailing.
Murty, I tend to agree with you. ACI, UBC which presumably are not in the nascent
stage do not have different types of ductile detailing for their zones 3 and 4. But they have
diff criteria for their Zone 2. The Zone 2 requirements are similar to IS 4326
ductility requirements ie Intermmediate Moment Resisting Frames. The IS 13920
requirements of capacity design, Clauses 6.3.3 and 7.3.4, are not applicable to UBC Zone 2.
These clauses are not quite the same but seem to be derived from the philosophy of
those for UBC Zone 3 and 4.
But our Zone III requirements of IS 13920 for 5 storeys and higher continue to flummox me!
Take a 6 storey building, resting on v hard strata, regular etc. Let's compare the UBC Zone
2A with our IS 1893 Zone III
As per UBC, Zone 2A, An intermemediate MRF of 6 storeys (20m) will have a seismic coeff
factor =0.15*1*1.6/8 =0.03W (I'm skipping the steps)
For a 6 storey frame structure as per IS 1893, in ZONE III, T=0.6, seismic coeff for such a case
= 1.0*0.75*0.04=0.03W
Thus I.S. Zone III and UBC ZOne 2A have a similar seismic coeff for the same structure.
(This ofcourse is a gross simplification!)
Would it not be more logical then, to accept ductility requirements of IS 4326 for Zone III
without those backbreaking clauses 6.3.3 and 7.3.4 of IS 13920?
In Zones I and II, I suppose there is little seismic risk and the overstrength factors and the
factors of safety (besides inherent nominal ductility) can themselves take care of the larger
demand during the earthqauke and hence additional ductility provisions are not called upon.
I would agree about this increase. The increase of 15-25% steel in numbers works to about
8%- 15% of the RC cost and varies from 3% to 8% increase on the structure plus finishes cost-
depending on which part of the country you are working.
I would want to know from designers, how much is the increase in cost due to conformance
to IS 13920 CLauses 6.3.3 and 7.3.4. assuming the ducitlity criteria of IS 4326 are being
provided in any case?
> >2. What is the ductility level (in terms of ratio) sought to be achieved by
> > the specified recommendations?
> An overall structure ductility of 4-6 will be the ideal situation.
> But, we need to do a large number of experiments on
> prototype structures/subassemblages designed with
> Indian seismic code and understand the ductility that
> can be achieved. The limited experience in our laboratory
> at IIT Kanpur with RC beam-column joint sub-assemblages
> designed with IS:13920 detail shows that it is around 6-8
> (some details in ICJ, Vol.75, No.4, April 2001).
> But, the "overall structure ductility" with this "subassemblage ductility"
> will be smaller. More work needs to be done to know
> how much "overall structure ductility" will be available.....
Have you done any tests for only IS 4326 ductile detailing? WHat kind of ductility ratios do
you come up with?
Thanks,
Alpa
Alpa::
Thanks for your note.
> Would it not be more logical then, to accept ductility requirements of IS 4326 for Zone III
without those backbreaking clauses 6.3.3 and 7.3.4 of IS 13920?
Wonderful thought!!
I agree with you that it is desirable to have::
(a) Zones I and II:: No special ductility provisions
(b) Zone III:: No back-breaking provisions of IS13920-1993; and simple IS4326-1976 type
provisions should do.
(c) Zones IV and V:: Major ductility provisions of IS13920-1993.
The basic concern is the seismic zone map. We are not yet sure that zone III means moderate
level risk in FUTURE EQs. We may say, zone III means MSK VII level shaking in PAST EQs.
So, once we have a consistent seismic zone map, considering possible future events on
known faults also, we can have the 1976 provisions for zone III...!!
¾ Have you done any tests for only IS 4326 ductile detailing? WHat kind of ductility
ratios do you come up with?
We did these experiments in around 1995, so we were concentrating on the "new" IS:13920-
1993 only. As I said, we tested only RC exterior subassemblages and they gave ductility
around 6-8. Of course, the ductility values will reduce at the overall structure level!!
warm regards...
murty
2. As per Park & Paulay (reference), the ductility ratio in normal buildings without ductile
detailing is approx. 5. Considering this to be O.K. one would expect that with ductile
detailing provisions, this ratio would be considerably higher than 6-8 mentioned by you.
3. The help of authorities (with some biting teeth) within or without the engineering
community is essential to take care of the black sheep in our engineering fraternity. For this
administrators have to be given teeth to bite. I dont think our bureaucrats will want to give
any such power to the engineers. Hence it is they who will have to look after the enforcement
part- ofcourse with the help of the engineering committee.
Regards
SUNIL MAHTO
Replying to Ramanuj Rathi on Soil factors In the draft 1893 the soil site effects are treated in
the same fashion as in the UBC-97. However, it has only three soil types: hard (rock),
medium and soft, with three different relations of Sa/g w.r.t. natural time period
(T), one for each soil type.
The factor Sa/g is not new: in the current 1984 code, there is only one relation for Sa/g which
is modified by multiplying a soil-foundation factor (beta) which is constant for all natural
periods of the spectrum and its minimum value is unity (i.e. no increase in design base
shear). In other words, its independency with T means that shape of design spectrum
remains same. This beta is explicit function of a foundation system, i.e., isolated footings vs.
raft foundation. A closer look at the table for beta suggests that larger values are endowed to
footings which are more vulnerable to differential settlement.
However, the observed strong ground motion data on various soil sites indicates that local
soils tend to change the shape of spectrum from that of at bedrock/rock sites. That is, their
influence (usually amplification of spectral values) is predominant over a certain period
range which usually lies in the velocity sensitive region of the spectrum. Large spectral
velocities have been observed on deep alluvium sites in comparison to rock sites.
Thus, the current thinking is to de-link the soil types from the foundation types, while
specifying the design base shear (i.e. design spectrum). The settlement vulnerability of the
structure has insignificant effect on the earthquake-induced inertia forces. The effect of
foundation structure may be treated separately as a part of soil-structure interaction.
Also refer to paper by Sudhir Jain on proposed 1893 draft code and commentary, which is
available among the conference's resource materials at the NICEE web site
Durgesh Rai
1. As per Cl 7.3.4 of IS 13920, the design shear force for col shall be max. of that as
per analysis or the elastic col shear based on the moment of resistance of the joining beams
framing into the col.
Logic of considering moment resistance of the joining beam is not understood since the
maximum shear to which the col can be subjected even during plastic hinge formation at top
and bottom ends is the sum of moment of resistances of the two ends of the col divided by its
length. This shear may be more than that as per codal provision if the col is stiffer than the
joining beams and vice versa.
2. As per 7.3.4 of SP-34:- when a column at a particular floor level is smaller in crossection
than the col immediately below it and the offset is more than 75 mm, the longitudinal bars
are to be terminated at the floor slab and separate dowels to be used whereas as per cl. 7.2.1,
lap shall be provided only in the central half of member length which is contradictory.
This can be avoided by restricting the reduction of col section within 75 mm offset which
may lead to provision of a much higher section than required in the upper floor, specially
when bottom floor col section requirement is high because of some specific requrement like
movement of crane or similar.
tk ghosh
I would like to make a suggestion: The recent earthquake at gujrat made me ponder over
many points. Malpractices and igorance of earthquake detailing were among the main
factors responsible for the disaster. Which could have been avoided. But an important point
which I want to mention is that of soil structure. I live in Pune city,which comes under the
zone III as well as Ahemdebad. Though the zoning has been done with respect to the
earthquake intensity, it does not at any time consider the soil characteristics.
To elaborate it further, Pune lies on the Deccan Plateau which has Basalt underlying.
Whereas Ahemedebad sandy soil underlying it. If we consider liquefaction of soil, the effect
of similar magnitude earthquake in Pune and Ahemedebad will have different implications
on the behaviour of superstructure. Zoning therefore needs to be based also on the soil
characteristics. Or while doing analysis, ie IS1893 or IS 13920 should mention an
additional check to account for this effect. I have mentioned this points in one of my papers
published in an journal in Pune. Unfortunately I have never had the time to investigate or
study this matter in detail. It would be interesting if someone does this study, so as to
quantify or rather qualify the suggestion I have done. Information would be most welcome
Regards
Prachee Dhavlikar
Mr. K. Pandurangan,
The responses to your queries on some of the clauses in IS: 1893 - 1984 are as follows::
>1. clause 3.11 gives that the predominant direction of earthquake force is horizontal - is it
always true?
No, it is always not true! There may be a vertical component of it also. However, the
additional (+/-) vertical force (along gravity) is generally taken care of by the factor of safety
against gravity loads that are already accounted for in the design. Here, our main intension
is lateral load resistant design, and hence, vibration in horizontal direction
is considered.
>2. clause 3.15 says that vertical component of earth quake forces need to be considered
under specific situations and is not precise to in which type of structure such forces need to
be considered
>3.clause 3.12 says that the soil should not lose strength , but is not the actual situation and
in sandy soils liquification may occur and the code is silent in these situations
No, the Code is not silent on this issue. Please refer to Note 3, Table 1 of the Code.
>4.appendix clause F3.1 the damping factor given for materials is not specific and the ranges
given may generate wide range of seismic forces and hence we suggest that the damping
factor should be more specific.
Yes, it results in a wide range of force values if Response Spectrum Method is used, but the
exact damping in a structure is also difficult to ascertain. However, 5% of critical is the
damping in most of the general concrete structures, and the new draft Code gives the
spectrum for 5% damping to be used for such structures.
>5.clause 3.1 value of elastic modulus for dynamic analysis may not be correct
I think you are refering to the elastic modulus of concrete which is usually taken as that
given in IS: 456. However, in my understanding, a lower value accounting for cracked
concrete should be used.
>6.In figure 2, average acceleration spectra , max value of natural period of vibration in
seconds is maximum of 3.0 and in our view the natural period of buildings may go above 3.0 .
in this case the chart needs modifications
Yes, in some special cases, the period may go above 3.0, and the new dreaft Code has it upto
4.0 sec.
>7.in article 5 for elevated buildings, the water tanks are assumed to be single degree of
freedom structures.
The water tanks when not "full" will definitely not behave as SDOF. The sloshing of the
liquid should also be accounted for, and the sloshing mode of vibration will also play a
role in the overall response of the structure. However, the two periods are generally well
apart, and the problem may be considered as that of two uncoupled SDOFs.
>8.in article 5.2.4 full or empty conditions of checking of water tanks is specified. is that
sufficient .
In full condition, maximum restoring force is obtained, while in empty condition, restoring
force is minimum, and a check against tension can be done. It seems to be
sufficient.
>9. in the article 5.2.3 the explanation given for the calculation of defections is not clear
I think, all we need here is the stiffness (k=F/delta) of the system. The period is
2*pi*sqrt(m/k), and this reduces to the formula given in the Code, if a lateral load (F=m*g)
equal to the weight of the system is applied.
>10.In clause 4.2.1 c> building height greater than 40 >is given we suppose that it should be
greater than 90.
>11. in figure 5A , the figure given is for the building and it would be better that a three
dimensional drawing is given or the title may be changed to building instead of frame to
avoid ambiguities.
rupen goswami.
Hello Friends,
Namskar & Good Morning,
Dear Mr. Rai,
The Final Draft Code defined soil profile as > "The soils which have shear wave velocity
greater than 750 m/s and where the soil depth is less than 50 m and the overlying rocks are
stable deposits of sand, gravel or stiffer clay is considered rocky site. The soils which have
shear velocity less than 750 m/s including sites where the soil depth exceeds 50 m and the
overlying soil types are stable deposits of sands, gravels or clays is considered soil site" [As I
know this statment is removed from code !]
How to determine the soil profile? What should be the depth of soil investigation?
Dipak Shah
Hi Gentlemen...
This refers to point no. 1 of Mr. T.K.Ghosh's mail (included below). I guess, this aspect of
seismic detailing has been tabled by many others in the past few days.
Clause no. 7.3.4 of IS:13920 stipulates that for RCC columns, apart from the shear force
obtained from structural analysis, the same shall also be determined on the basis of beam
moment capacities and compared with the former one. The higher value out of these two
shear forces shall be considered in design. To my understanding this codal provision stems
from the requirement that building columns should stand upright even after formation of
plastic hinges at the beam-ends. If we consider free body diagram of the beam column joints,
moments developed at the beam-ends will induce a total unbalanced moment on the joint.
To have a joint equilibrium, this unbalanced moment is to be resisted by the upper and lower
segment of the column. This phenomenon have been explained in Figure * 8 of IS:13920.
This idea should be understood in the light of CAPACITY DESIGN and not as the design
under working loads due to earthquake. To explain it further, a shear capacity is being built
into the column section so that it does to fail (in shear) even when the beams have reached
their limiting moments. This genesis of this capacity design is logical, because the actual
seismic force in reality may be much higher than the calculated seismic force.
I appreciate the Design Engineers' concern to follow this stipulation, as the project schedule
and sequence of work hardly permits to exercise this option. But the engineering justification
of this work can not be ignored. I think the project Owner's are also required to be
considerate to the Engineers (in terms of time) if they really want safe, sound and healthy
structures.
Dear friends,
For ductile failure of a multistorey building due to an earthquake, it is necessary to design
the structure to have strong column and weak girder concept. This concept ensures that a
plastic hinge is formed in a beam rather than column and column remains elastic as for as
possible. (This also calls for the importance of splicing of longitudinal reinforcemnt.)
Such a provision of strong column and weak girder was present in the draft of IS: 13920, but
it had been removed from the final 1993 version.
Any particular reason for not including at that time? Is it not desirable to have the clause?
What is contained in the proposed final code?
"1. As most of us are aware, the provisions of IS: 13920 for ductile detailing are the same for
all Zones where ductile detailing is applicable. Would it not be more logical to have a less
stringent requirement for the zones with lesser seismic coefficient? Ductile detailing
increases reinforcement consumption by about 20 - 30 % which is considerable"
Arvind's response:
I would be very cautious with our experience of Latur, the earthquake struck in the zone
which was not an active zone as per seismic zoning map.
Secondly The cost of normal frame with reinforcement works out to say approximately Rs.
1000 per Sqm. (Where frame consists of foundation, plinth beams, columns, roof slab, beams
and staircase etc.) Now this is with consumption of steel of approximately 32 to 37 Kgs /
Sqm. Now if this has to go up by say 20 % then the steel consumption will be 38.5 Kgs to
44.5 Kgs. This increase in cost of 44.5 Kgs-37.) Kgs works out to Rs. 7.5 x 23 = Rs.
172.50. This is an increase of about 17.25 % above the basic frame cost of Rs. 1000 per Sqm
and if we take basic cost of construction with finishes, electrical, sanitary etc. to Say Rs.
4900.00 per Sqm then it works out to be an increase of only 3.5 % of the total cost of
construction on account of ductile detailing and extra consumption of reinforcement. Hence
I feel we professionals should not make a hue and cry on this small increase for additional
safety and gauranteed performance in future shaking. The clients have to be convinced
about very marginal cost increase upto maximum say 5% only and assured benefits will
outplay the extra cost incurred!
Mr Mahto wrote:
" 3. It is to be noted that the IS: 1893-1984 is under revision. The draft itself is constantly
undergoing revisions and difference of opinion between experts still persists. In such a
scenario, it is not advisable to adopt the draft for design purpose unless and until the
revisions are accepted and formally incorporated. Moreover designers will be facing the
problem of having to redesign every time a draft code is revised. A distinction has to be
made and understood especially between research and actual project execution which have
many other constraints such as cost and time."
Arvind's response:
The word "change" brings natural resistance from human reflex action. But this does not
mean we should stop thinking, stop adopting new ideas, stop improving. This is a never
ending process.
But I agree with you on one point that there will always be difficulty in certification of
structures built with the previous codal requirements once the code is revised. This needs
more attention from our friends.
One of the crude methods is to make a borehole and study the soil characteristics along the
borehole. Depending upon the construction project (in terms of size), one may carry out
seismic refraction or resistivity soundings for soil
information.
It all depends on the size of the project. The maximum depth of the soil investigation should
be upto 500 m for a mega project. However, a broad geological/geophysical knowledge of
the area should be known before a project and its site is decided.
Ramesh P. Singh
Prakash Kadam [Sunday, February 03, 2002 4:28 PM]
hi,
Reduced live load during seismic-
In industrial structures, %live load considered for seismic analysis should be for entire
floor .For a floor normally designed for a generalised live load of 7.5 kn/sqm say 50% load
considered for seismic analysis means total load of 1350 kn for total
floor area of say 360 sqm of area which is ridiculously high.
prakash kadam
Reduce live load during seismic-In industrial structures, %live load considered for seismic
analysis should be for entire floor .For a floor normally designed for a generalized live load
of 7.5 kn/sqm, say 50% load considered for seismic analysis means total load of 1350 kn for
total floor area of say 360 sqm of area which is ridiculously high.
Arvind's comment:
It is required to investigate the provisions in codes of other countries. Our friends from NZ,
US, UK please offer your comments.
Also I would like to bring to the notice Note 2 in IS: 1893 after Clause 4.1.1 Design Live
Loads which says "The proportions of live load indicated above for calculating the horizontal
seismic forces are applicable to average conditions. Where the probable loads at the time of
an earthquake are more accurately assessed, the designer may alter the proportions indicated
or even replace the entire live load proportions by the actual assessed load."
This means designers have been given some flexibility. But how to accurately assess
probable loads at the time of an earthquake?
Please clarify.
Hello everybody,
Effect of similar earthquakes on cities and villages are different, both in terms of lost human
lives and in terms of shattering of economy. Should we not have a factor to take these into
account? Why don't we introduce an additional factor for seismic coefficient? This factor
could be 1.3 for the four cities of Delhi, Mumbai, Kolkatta and Chennai, 1.2 for other major
cities like Bangalore, Hyderabad, Pune etc, 1.1 for smaller cities and towns and 1.0 for
villages and wilderness?
Regards,
S.P.Srinivasan
Sir,
1. Referred expressions for shear forces are based on the assumption of weaker beams and
stronger col philosophy. But in practice, for a multi storey frame, beams normally have more
ultimate moment carrying capacity than the cols. Reasons being:-
a) Under elastic analysis with earthquake forces, the moment in the beams & cols are almost
of the same magnitude under EQ load With DL & LL.
b) Cols are subjected to compressive force in addition to moments thereby requiring les
reinforcement area per face compared to that of beams.
Thus it is felt that either there should be a specific codal provision to ensure more ultimate
moment carrying capacity of cols than that of beams in each joint to keep the expression
under referred clauses valid or else these clauses need to be modified.
Regards
tk ghosh
I understand that 'E', Seismic Forces as determined by Codal Procedures, is of the nature of
Limit State. Meaning that no load Factor has to be applied to 'E'. Similarly for Allowable
Stress Design Method 'E' has to be divided by 1.4 in the load combination. This provision
will reduce Design Seismic Forces and help in achieving economy.
As I understand that revised IS Code Procedures are in line with UBC. How do we draw
parallel? I request author of Revised IS Code to throw light on this matter.
Hello everybody,
The Draft IS 1893 deals with liquefaction of soil under the clause on 'Increase in Permissible
Stresses'. I hope it has been moved to a separate section in the final printing of the code.
Note 3 under Table 1 contains a table indicating desirable minimum N values (in liquefiable
strata) for various seismic zones and at various depths.
In this table, Zone V is not mentioned. I would like to know whether Zone V has been
included in the final version of the code. And what are the relevant details for Zone V?
Also there is no mention about normal structures in Zone II. Now, as I understand, when
liquefaction occurs below founding level, no analysis or design or detailing is going to save
the building. It appears as if the code is almost implying, 'do not worry about liquefiable
layers below residential buildings in Zone II; if soil liquefies, let them collapse'. I think that
the Zone II parameters given in the table should be made applicable both to normal
buildings and important buildings. Any comments?
Regards
S.P.Srinivasan
S.P. Srinivasan [Monday, February 04, 2002 9:36 PM]
Hello everybody,
All engineers know that when a rebar has a bent shape and is stressed, it imparts local
bearing stresses on the concrete at the location of the bend. IS 456 contains a clause for
calculating this stress and checking for safety. If the bend is as per the provisions of IS:2502,
the stresses will be within permissible values. However, when we give full anchorage to
reinforcement at discontinuous ends, the bars have to be extended well beyond the bend.
This results in high stresses in the bars at the bend. This in turn increases the bearing stress
in concrete at the location of the bend. The only way to solve this problem is to increase the
radius of curvature of the bar such that the calculated bearing stress is less than the allowable
value. This is a simple calculation, but is not done by many engineers. This aspect has to be
highlighted in IS 13920 since integrity of the beam-column junction is important. Figures 1, 5,
and 9 of the above code should show the bars bent with a large radius.
Regards
S.P.Srinivasan
dear sirs,
Sir in second draft copy of is-1893 also doesn't include any method for calculating the time
period infill frame with brick masonry with opening Door/window. V. Thiruvengadam in
1984 gives the multiple strust anology method. But results are to much differ than
experimental results.Then is these method is able to use for analysis purpose.
Chinmay Gorantiwar
2. Is there any move to publicise data of recent earthquakes? Data on earthquakes is kept in
closed garbs. Currently you have to approach Mausam Bhavan of Delhi to get any data and
it is not easy to get it (I have tried it without success). At any time there is more data
available on USGS site than any other Indian site. Does any one have seismograph of Bhuj
Earthquake? Have we tried simulation of this earthquake on existing buildings?
3. Soil parameters (no more questions than what has been discussed) in the draft code seem
to be inadequate (only two classifications).
4. Time period: The basic time period of any structure depends on its stiffness and mass
(matrices in complex system). The new code seems to have only one factor height which
poorly represents stiffness (as there is no width consideration) and no mass
considerations. Although infilled frame structures are stiffer (than open structures) these are
also heavier (thereby increasing the time period). Can't we have a better time period formula
than what is proposed? The formula which is being proposed is similar (nearly same) to
UBC. Can we put in same logic (where light partition wall is a practice than heavier infilled
walls) and formula?
5. Should this time period be made compulsory requirement? If one takes into account both
stiffness and weight of infills should it not be taken as better approximation?
6. I fail to understand the load factors given in code. As I understand the load factors
represent the probability of occurrence of any load. Currently we have 1.2 factor for
combination of dead+live+earthquake loads and 1.5 factor for combination of dead
+earthquake load. Does it mean that the probability of occurrence of earthquake is much
higher when all live load is gone? Or does it mean that buildings should survive when
everyone has vacated the premises?
1. Ductility criterion: If one tries to economize the structural cost (as it is one of the prime
objective of structural engineers) one must reduce grade of concrete. (as you have to provide
higher percentage of reinforcement in higher grade of concretes). Does this make sense?
Generally one specifies a grade of concrete however what you get (thanks to better
technology) is higher grade concrete than specified. Should one ask contractor to demolish a
part of building if one gets higher strength? (as the resultant building will not be ductile!).
2. 135 degree hook: Can't there be better alternatives to this? These hooks create nuisance
for vibrators. There should be alternatives like a) welded links b) links with higher laps
which are tied by designed binding wire.
3. Cross tie: This forms third layer in the reinforcement. Does one increase cover to take
care of this? Or should one sacrifice fire criterion at these little points? The cross tie is
required to prevent buckling of main column link. Can one have improvements in the
detailing of the cross tie? (such as welded or better tied normal tie link). If one calculates
axial load carrying capacity of main column link and adopt 2.5% criterion (as in steel design)
to fulfill this requirement, one can design a strong binding wire to take the load.
C) On Bhuj Earthquake: (since many of the contributors are from the region my questions
are addressed to them and other researchers).
"In storage and warehouse occupancies, a minimium of 25 percent of the floor live load shall
be applicable" UBC 1630.1.1 (1997).
Alltough I have used higher percentage of Live Load in consultation with the Owner.
Arun Bhalaik
> The Final Draft Code defined soil profile as > "The soils which have shear wave
velocity greater than 750 m/s and where the soil depth is less than 50 m and the overlying
rocks are stable deposits of sand, gravel or stiffer clay is considered rocky site. The soils
which have shear velocity less than 750 m/s including sites where the soil depth exceeds 50
m and the overlying soil types are stable deposits of sands, gravels or clays is considered soil
site" [As I know this statment is removed from code !]
> How to determine the soil profile ? What should be the depth of soil investigation ?
You are referring to the 2000 draft. The 2001 draft has 3 soil types -- rock or hard soil,
medium soils and soft soils -- characterized according to N values of SPT at the founding
level. N is greater than 30 for hard soils, between 10 and 30 for medium soils, and less than
10 for soft soils. In fact, it is following the same definition of soils as given in the Table 1 of
the current code for allowable bearing pressure. The characterization based on shear wave
velocity is dropped in the subsequent revision!
Durgesh Rai
M. Hariharan
Dear Sir,
is clause 3.3.1 (permissible increase in material stress) & clause 3.3.3 (permissible increase in
allowable bearing pressure of soil) applicable when seismic forces are combined with dead
load only or is it applicable only when it is combined with both dead & live loads.
Regads
C. Ravi kumar
"I fail to understand the load factors given in code. As I understand the load factors
represent the probability of occurrence of any load. Currently we have 1.2 factor for
combination of dead+live+earthquake loads and 1.5 factor for combination of dead
+earthquake load. Does it mean that the probability of occurrence of earthquake is much
higher when all live load is gone? Or does it mean that buildings should survive when
everyone has vacated the premises?"
Arvind's comment:
1. The code specifies the use of elastic design (working stress method) permitting an
increase of 33 1/3 percent in the normal working stress in materials (concrete, steel, wood
etc.) when the effects of earthquake load are combined with other normal dead and live
loads.
2. Since the increase of permissible stresses cuts into factor of safety, it is natural that load
factor should be reduced proportionately as compared with normal dead and live loads by
dividing 1.33
Sir,
As per code we have to use load combination of 1.5 DL + 1.5 EQ load. Why this is required?
When earth quake load acts there is a load P and Moment M
Hence stress = P/A + M/Z
with safety of 1.5 = (P/A + M/Z ) * 1.5
We get the same from 1.5 EQ which is the 1.5 times the actual load condition with out any LL.
With 1.5 DL, we are adding another P/A unnecessarily. as below
Suppose we are simulating with a software package 1.5 of EQ is only what we need.
That means 50% safety over actual stresses.
Please comment.
Can we also reduce the factor of safety considering the increase of material strength by 33%?
(As commented by Mr Aravind), I would like to get more comments on this.
Please comment.
Regards,
Reji Zachariah
Hi Folks !
The Base shear reduction due to ductility (mu) is not uniform throughout the frequency
range of structures.
(a) For low frequency structures the force reduction is 1/mu (Displacement equality)
(b) For Intermediate frequency structures it is, 1/sqrt(2.0 mu-1) (Energy equality)
(c) For high frequency structures it is, 1.0 (No force reduction)
If that be the case, why we provide a uniform reduction of 1/mu, irrespective of the
frequency of the structure vis-a-vis the peak frequency content in the spectrum. (Both UBC
as well as Indian Draft codes)
Gopal
Hiren Desai [Wednesday, February 06, 2002 9:29 PM]
According to IS 13920., Shortest dimension of the column shouldn't be less then 300 mm if
C/C span of beam framing into it is more than 5.0 meter or unsupported length of column is
more than 4.0 meter.
I would like to know basic reasons behind this provision, as well as if one has to provide
lesser dimension of the column, what extra precautions in design as well as detailing is
required?
Hiren Desai
Hello everybody
A) In an earlier mail I had indicated that the proposed IS 1893 is silent about Zone V
parameters regarding liquefaction. While the table does not mention about Zone V, the
paragraph under clause 6.3.4.2 treats Zones III, IV and V together. Hence probably, whatever
is given for Zones III & IV in the table are applicable to Zone V also.
B) From the 2000 version of the draft 1893 code, I find the following information regarding
occurrence of liquefaction of soils:
(i) Soil classification SP (as given in IS 1498) does not match the requirements for liquefaction
given in published literature. The requirements indicated in literature are (a) The 10% size of
the soil particles generally are reported to be between 0.01mm and 0.25mm (b) The
coefficient of uniformity is reported to be between 2 and 10. Should IS 1893 give independent
requirements for liquefaction instead of indicating SP type of soils?
(ii) The code is silent about non-liquefaction settlement of soils. If dry loose sand is subject to
seismic vibrations, it can settle considerably. This can lead to unacceptable differential
settlements and impair the resistance of the building to seismic forces. Should IS 1893 give
guidelines to be adopted under such conditions?
Hi friends,
The NZS4203 (Loading Standard), gives "area reduction factor" and "live load combination
factor for ultimate limt state" for calculation of seismic live load rather than live load
reduction percentage for ultimate limit state. The seismic live load is product of basic live
load (similar to IS875 (Part II)), area reduction factor and live load combination factor for
ultimate limit state (0.4-0.6 depending upon occupancy). Area reduction factor is function of
area under question and occupancy and two formula are given.
Regards,
Jitendra K Bothara
Hello everybody
1) A very thin liquefiable layer cannot create structural problems. What is the minimum
thickness of liquefiable layer which can create problems?
2) The N-values indicated in IS 1893 are uncorrected or corrected values? If they are
corrected N-values, what corrections are to be applied?
Regards
S.P.Srinivasan
In response to yr mail dated 6th Feb, 2002 please note that the minimum column dimension
giveg in IS:13920-1993 is based on the international practices. For example cl 21.4.1.1 of
ACI:318-95 has the same provision. Moreover, as per good engineering practices
where longitudinal beam reinforcement extends through a beam-column
junction, the column dimension parallel to the beam reinforcement should
be a minimum of 20xdia of the largest beam longitudinal reinforcement (see cl 21.5.1.4).
The 300mm dimension of column will barely satisfy a 16mm dia bar, which is usual for
5.0m span beams.
VINAY GUPTA
Vinay Gupta [Thursday, February 07, 2002 4:41 PM]
Dear Mr S P Srinivasan
With reference to your mail dated 7th feb, 2002 please note that Liquefaction is a very vital
problem, which requires a combination of Seismic shakings, poorly graded cohensionless
soin and water table.
Both present code as well as the new draft code indicate the parameterscausing liquefaction
very briefly and are mostly not adequate to assess the liquefaction potential. A better
estimate of the same can be using the book Ground Motions and Soil Liquefaction During
Earthquakes by Seed H Bolton and Idriss I M wherin D-50 value of the soil is considered for
the purpose.
As a consultant I would like to advise that in the cases of liquefiable substrata it ideal to
provide deep foundation such as pile or well foundation.
VINAY GUPTA