Sunteți pe pagina 1din 2

DCCP Degassed Cation Conductivity Panel

DCCP
Degassed Cation Conductivity Panel
Simple and Compact Cycle Chemistry Validation

Features
 Capableof measuring specific  Sample cooler ensures CC and DCC
conductivity (SC), cation conductivity probes receive identical sample
(CC) and degassed cation conductivity temperatures, eliminating errors
(DCC)
 Compact wall mount design
Operates
 in accordance with ASTM
D4519
Sample Flow Diagram

(1)
The cooled sample flows
through the first conductivity cell
which measures specific
conductivity (SC).

(2)
The cation resin bed exchanges
positive ions in the sample for (4)
hydrogen ions. The digitally operated heater
removes volatiles, such as CO2, in
the sample. Turns of f automatically
on low sample flow.
(3)
The sample flows through
the second conductivity cell which
measures for cation conductivity (5)
(CC). The sample cooler returns
the sample temperature to inlet
conditions.

(6)
The sample flows through
the third conductivity cell which
measures the conductivity of the
degassed sample (DCC).

www.sentry-equip.com 1.43.1 Rev. 8 05/10


NEMA 4X ELECTRICAL ENCLOSURE WITH ON/OFF (OPTIONAL)
SWITCH & TEMPERATURE CONTROL DEGASSED CATION CONDUCTIVITY CELL

(OPTIONAL)
CELL HOLDER

SAMPLE OUTLET
1/4" TUBE COMP.

COOLING WATER
OUTLET, 3/8" FNPT

SAMPLE COOLER

HEATER w/ INTEGRAL COOLING WATER


THERMOCOUPLE INLET, 3/8" FNPT

SPECIFICATIONS
Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32" x 15" x 12" as shown
Weight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 pounds
Pressure Rating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100 psig (7 barg)
Temperature Rating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 130°F (55°C) with RC-100 before degas
Sample Flow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100-150 cc/min
Sample Inlet Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1/4" tube fitting
Sample Outlet Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1/4" tube fitting
Sample Cooler Type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TEB-4221
Cooler Cooling Water Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/8" FNPT
Cooling Water Consumption . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 gpm
Input Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110-120/220-240 VAC, 1 Phase, 50/60 Hz
Power Consumption . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.6 KVA
Cell Holders (optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4" FNPT, 316 SS
Resin Column (optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Sentry RC-100
DCCP Model Number Options
A B C D
Voltage Cell Holders Flow Indicator with valve Analyzers/Probes
1 = 110-120 VAC, 1 Ph., 50/60 Hz 0 = None 0 = None 0 = Customer Supplied
2 = 220-240 VAC, 1 Ph., 50/60 Hz 1 = DCC 1 = Yes 1 = Supplied by Sentry
2 = CC & DCC (with RC-100) (Customer to specify)
3 = SC, CC & DCC (with RC-100)

It is solely the responsibility of the end-user, through its own analysis and testing, to select products and materials suitable for
their specific application requirements, ensure they are properly installed, safely applied, properly maintained, and limit their
use to their intended purpose. Improper selection, installation, or use may result in personal injury or property damage.

SENTRY EQUIPMENT CORP For further information, contact:


PO Box 127
Oconomowoc, WI 53066 USA
Phone: 262-567-7256
Fa x: 262-567-4523
E-mail:
sales@sentry-equip.com
Website:
w w w.sentry-equip.com
ISO 9001:2008
© Sentry Equipment Corp 2006 1.43.1 Rev. 8 05/10

S-ar putea să vă placă și