-. Archive list not include the copy of student’s certificate (Ijazah), Klaper, Buku Mutasi, SKHUN as one
of the archives to be maintained.
-. Student’s Main Book for 2008 under the name of Moch. Ichsan (24593) and Moch. Hidayat (24594)
graduate was not filled out completely
-. Reports of Competence Development program were not completely filled out.
2. Evaluation to be filled in by the auditor
Minor nonconformity Major nonconformity
Required evidence for follow-up audit on site (date and duration to be defined, billable service)
effective closure: audit of records off site (date to be defined, billable service)
evidence of effective closure was presented during the audit
(all sections of this form to be completed at the end of the audit)
Date 16/12/2010 Lead Auditor Markus Dihanto
Customer response:
Acknowledgement of the finding and evaluation yes no
Date 16/12/2010 Management representative Mr. Joko Santoso,S.Pd. .
3. Containment action / immediate measures to be filled in by customer
Sudah Dilaksanakan Pengukuran
4. Root cause analysis (including what other processes can be impacted) to be filled in by customer
Petugas TU belum sempat melengkapi data dalam buku induk 2008 atas nama Moch. Ichsan (24593)
dan Moch. Hidayat (24594), (24593 yang betul Moch. Ilham bukan Moch Ichsan)
5. Corrective action taken to remove root cause to be filled in by customer
(include a description of any error-proofing that was implemented with steps and timeline for completion)
Sudah di lengkapi dalam buku induk 2008 atas nama Moch. Ichsan (24593) dan Moch. Hidayat (24594)
52477502.doc All aspects of the audit are considered confidential Rev. 6/08 1/5
Finding and corrective action plan
No. 2 of 4 Ref. No. Error: Reference source not
found
1. Finding to be filled in by the auditor
Standard ISO 9001:2008 Requirement (ref) 6.2
Process/subject Administration/ Competence, training and awareness
Statement and objective evidence : Training program is not effective
-. Some training has been conducted, however, training program hasn’t been established yet as
stipulated PM-TU-02
2. Evaluation to be filled in by the auditor
Minor nonconformity Major nonconformity
Required evidence for follow-up audit on site (date and duration to be defined, billable service)
effective closure: audit of records off site (date to be defined, billable service)
evidence of effective closure was presented during the audit
(all sections of this form to be completed at the end of the audit)
Date 16/12/2010 Lead Auditor Markus Dihanto
Customer response:
Acknowledgement of the finding and evaluation yes no
Date 16/12/2010 Management representative Mr. Joko Santoso,S.Pd. .
3. Containment action / immediate measures to be filled in by customer
Sudah dilaksanakan
4. Root cause analysis (including what other processes can be impacted) to be filled in by customer
Petugas TU banyak tugas sehingga terbengkalai
5. Corrective action taken to remove root cause to be filled in by customer
(include a description of any error-proofing that was implemented with steps and timeline for completion)
Sudah dibuat pogram pengembangan kompetensi pendidik dan kependidikan (PM-TU-02)
Corrective action will be deployed by (date)
Date 03 -01-2011 Management representative Mr. Joko Santoso,S.Pd. .
Planned action is suitable and acceptable yes no
Date 22-02-2011 Lead Auditor
6. Evidence of closure (reference attachments for any evidence submitted) to be filled in by the auditor
Ada Terlampir
Evaluation: Nonconformity has been closed effectively. yes no
Date 22-02-2011 Lead Auditor
52477502.doc All aspects of the audit are considered confidential Rev. 6/08 2/5
Finding and corrective action plan
No. 3 of 4 Ref. No. Error: Reference source not
found
1. Finding to be filled in by the auditor
Standard ISO 9001:2008 Requirement (ref) 6.3
Process/subject Infrastructure/ Infrastructure preventive and corrective maintenance
Statement and objective evidence : Infrastructure preventive and corrective maintenance is not effective
6.3 Infrastructure
The organization shall determine, provide and maintain the infrastructure needed to achieve conformity to
product requirements. Infrastructure includes, as applicable,
a) buildings, workspace and associated utilities,
b) process equipment (both hardware and software), and
c) supporting services (such as transport, communication or information systems).
52477502.doc All aspects of the audit are considered confidential Rev. 6/08 3/5
Finding and corrective action plan
No. 4 of 4 Ref. No. Error: Reference source not
found
1. Finding to be filled in by the auditor
Standard ISO 9001:2008 Requirement (ref) 7.5.2
Process/subject Teaching Process/ Validation of Lesson Plan
Statement and objective evidence : Validation of Lesson Plan is not effective
-. Lesson plan were not validate and revalidate when it was changed for some reason, for the subject of
Science (Biology) for Class VIII for the month of November 2010. Rincian minggu efektif : 2+2+2, Promes
: 2+2+2, actual (journal) : 2+1+1 (hours/week).
52477502.doc All aspects of the audit are considered confidential Rev. 6/08 4/5
\
52477502.doc All aspects of the audit are considered confidential Rev. 6/08 5/5