1. The document calculates the instrument and utility gas consumption for a blanket engineering services job.
2. It determines the maximum and normal demand for instrument gas consumption from various equipment items like pressure switches, control valves, and shutdown valves would be 0.48 MMSCFD and 0.08 MMSCFD respectively.
3. It also calculates the gas consumption for control panels and fussible loops, as well as chemical injection pumps and purge gas rates, totaling to a maximum total demand of 0.4817 MMSCFD.
1. The document calculates the instrument and utility gas consumption for a blanket engineering services job.
2. It determines the maximum and normal demand for instrument gas consumption from various equipment items like pressure switches, control valves, and shutdown valves would be 0.48 MMSCFD and 0.08 MMSCFD respectively.
3. It also calculates the gas consumption for control panels and fussible loops, as well as chemical injection pumps and purge gas rates, totaling to a maximum total demand of 0.4817 MMSCFD.
1. The document calculates the instrument and utility gas consumption for a blanket engineering services job.
2. It determines the maximum and normal demand for instrument gas consumption from various equipment items like pressure switches, control valves, and shutdown valves would be 0.48 MMSCFD and 0.08 MMSCFD respectively.
3. It also calculates the gas consumption for control panels and fussible loops, as well as chemical injection pumps and purge gas rates, totaling to a maximum total demand of 0.4817 MMSCFD.
JOB NAME : BLANKET ENGINEERING SERVICES - Work Order No.11
JOB NO. : 2524 SUBJECT : CALCULATION OF INSTRUMENT/ UTILITY GAS CONSUMPTION
A. CALCULATION OF INSTRUMENT GAS CONSUMPTION
No ITEM QUANTITY AIR CONSUMPTION GAS CONSUMPTION CONSUMPTION TOTAL REMARK
BASED ON CATALOGUE Qair *0.775/(Sggas)0.5 per each CONSUMPTION SCFH SCFH scfd scfd MAXIMUM DEMAND 1 Pressure Switch 9 ea 5 5.2 125 1,459 Fisher Catalogue 2 Level Switch 5 ea 42 43.7 1,048 6,810 Fisher Catalogue 3 Shutdown Valve 6 ea 2083 2164.6 51,950 405,206 Bettis Actuator Catalogue 4 Control Valve 2 ea 1000 1039.4 24,945 64,856 Fisher Catalogue 5 Level Controller 1 ea 42 43.7 1,048 1,362 Fisher Catalogue 6 Control Panel 1 ea 138 179.38 See table B 7 Fussible Loop 1 set 1,104 1,435.08 See table B
Maximum Demand 481,307.50 0.48 MMSCFD
NORMAL DEMAND 1 Pressure Switch 9 ea 5 5.2 125 1,459 Fisher Catalogue 2 Level Switch 5 ea 42 43.7 1,048 6,810 Fisher Catalogue 3 Shutdown Valve 6 ea 0 0 - - 4 Control Valve 2 ea 1039 1080.3 25,926 67,408 Fisher Catalogue 5 Level Controller 1 ea 42 43.7 1,048 1,362 Fisher Catalogue 6 Control Panel 1 ea 138 179.38 See table B 6 Fussible Loop 1 set 0 0 0
Normal Demand 77,218.75 0.08 MMSCFD
B. FUSIBLE LOOP AND CONTROL PANEL GAS CONSUMPTION
Area of tubing Estimated Length Time to fill in Gas Consumption
ft2 ft hour scfh Fussible Loop with 3/8" tubing 0.000767 2000 0.0014 1103.91 Control Panel with 1/4" and 3/8" tubing 0.000767 500 0.0028 137.99
C. CALCULATION OF UTILITY GAS CONSUMPTION
No ITEM QUANTITY CONSUMPTION TOTAL REMARK
per each CONSUMPTION scfd scfd
1 Chemical Injection Pump 2 ea 187.2 374.4 Estimated
2 Purge gas rate 360000 Non continuous (based on pipesim simulation)
D. INSTRUMENT/UTILITY GAS CONSUMPTION
No ITEM Instrument Chemical Injection Purge gas Total Demand
Demand Pump (MMSCFD) (MMSCFD) (MMSCFD) (MMSCFD) 1 Maximum Demand 0.4813 0.0004 - 0.4817 2 Normal Demand + purge gas 0.0772 0.0004 0.3600 0.4376 3 Normal Demand without purge gas 0.0772 0.0004 - 0.0776