Item Submission Reconciliation Submitted Resubmitted


No. VO No. Location Date Date Amount Amount

BATCH 1
1.0 VO-E-01 BASEMENT 3 - AREA A, B, & C 16-Dec-09 14,898.51 14,898.51
2.0 VO-E-02 BASEMENT 2 - AREA A, B, & C 16-Dec-09 67,614.43 67,614.43
3.0 VO-E-03 BASEMENT 1 - AREA A, B, & C 16-Dec-09 1,176,024.05 (292,145.96)
4.0 VO-E-04 GROUND FLOOR - All Areas & Area A, B, & C 16-Dec-09 1,496,640.72
GROUND FLOOR - All Areas & Area A, B, & C (POWER) 114,627.17
GROUND FLOOR - All Areas & Area A, B, & C (LIGHTING)
5.0 VO-E-05 LEVEL 2 Area A and Area C1 & Area A,B & C 16-Dec-09 2,263,544.79
LEVEL 2 Area A and Area C1 & Area A,B & C (POWER) 22,779.83
LEVEL 2 Area A and Area C1 & Area A,B & C (LIGHTING)
6.0 VO-E-06 LEVEL 3 - Admin Offices G.L. A-L / 2-4 16-Dec-09 203,595.82 203,595.82
7.0 VO-E-07 LEVEL 4 Power Layout (GYM/ FITNESS CENTER) 16-Dec-09 332,895.44 332,895.44
8.0 VO-E-08 LEVEL 5 to LEVEL 8 Hotel Rooms/ Suites (circuit homerun) 16-Dec-09 1,135,647.30 543,809.73
SUBTOTAL 6,690,861.06 1,008,074.97

BATCH 2
9.0 VO-E-11 GROUND FLOOR - Area A and C 21-May-10 19,581.53 6,836.53
10.0 VO-E-12 LEVEL 2 - Area A and C 21-May-10 28,240.50 28,240.50
11.0 VO-E-13 LEVEL 4 - Area B and C (Willow Spa) 21-May-10 965,730.39 (705,196.14)
12.0 VO-E-14 LEVEL 7 - Area C 21-May-10 313,924.15 75,430.34
13.0 VO-E-15 LEVEL 9 - Japanese Restaurant 21-May-10 417,647.92 233,409.99
14.0 VO-E-16 LEVEL 9 - Japanese Restaurant 21-May-10 17,909.40 17,909.40
15.0 VO-E-17 LEVEL 9 - Raffles Lounge and Business Center 21-May-10 172,059.32 59,594.04
16.0 VO-E-18 Additional and Deleted Panel Boards 21-May-10 51,408.95 51,408.95
17.0 VO-E-19 VARIATION OF WIRING SCHEDULE 21-May-10 1,339,175.28 877,765.25
18.0 VO-E-20 GOLD LOUNGE 21-May-10 421,194.38 271,483.96
19.0 VO-E-21 LEVEL 14, 15, 16, 17, 19 and 21 - Hallway 21-May-10 392,806.14 392,806.14
20.0 VO-E-22 LEVEL 18, 20, 22 and 23 - Hallway 21-May-10 49,663.28 (268,727.88)
21.0 VO-E-23 LEVEL 24, 25, 26-28 - Hallway 21-May-10 158,751.20 (172,326.93)
22.0 VO-E-24 LEVEL 29-30 - Hallway 21-May-10 1,305.66 (73,818.46)
23.0 VO-E-25 Fairmont Presidential Suite 21-May-10 304,311.73 241,166.82
24.0 VO-E-26 Raffles Presidential Suite 21-May-10 81,704.45 79,779.93
25.0 VO-E-27 Level 2 Outdoor Garden 21-May-10 27,788.91 27,788.91
26.0 VO-E-28 Level 10 Outdoor Garden 21-May-10 53,483.83 53,483.83
SUBTOTAL 4,816,687.02 1,197,035.18
BATCH 3

27.0 VO-E-29 Willow Spa 8-Jun-10 177,713.39 177,713.39


28.0 VO-E-30 Additional Dupelx Convenience Outlet for A-1 Left (Level 14-17, 19, 20) 8-Jun-10 81,528.48 81,528.48
SUBTOTAL 259,241.87 259,241.87
BATCH 4
Item Submission Reconciliation Submitted Resubmitted
No. VO No. Location Date Date Amount Amount

29.00 VO-E-31 Level 9 Raffles Lounge, Business Center and Public Toilet 16-Jul-10 99,683.60 3,310.78
30.00 VO-E-32 DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE 16-Jul-10 14,640,661.74
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -A (1,192,164.56)
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -B 1,529,514.54
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -C (8,319,635.52)
SUBTOTAL 99,683.60 (7,978,974.76)
BATCH 5

31.00 Lighting system and power system at Level 12 (GD K-L/5-8) 25-May-10 179,677.99
SUBTOTAL 179,677.99 -
Other Cost Proposal
32.0 Basement 1 Mezzanine 21-May-10 310,530.71 310,530.71
33.0 Deletion of Dumbwaiter 8-Jun-10 -10,827.01
34.0 Deletion of GFCI for Fairmont Hotel and Raffles Suites 8-Jun-10 -144,329.01
35.0 Relocation of Uninterruptible Power Supply (UPS) 8-Jun-10 1,603,846.22 1,603,846.22
36.0 Relocation of Panelboard from Ceiling to wardrobe 11-Jan-10 901,099.62 901,099.62
37.0 FCD vs. Mock-up Setting out 2,286,423.39
38.0 Free standing 795,937.03
39.0 Deletion of BCP, KTH/RCP (1,966,180.96)
40.0 Back of the house Lighting 409,845.42
SUBTOTAL 4,186,345.41 2,815,476.55

TOTAL AMOUNT OF V.O. 4,724,948.87 6,603,291.74


(6,603,291.74)
37.0 CORRIDOR MOCK UP BOQ 27,653.29 27,653.29
38.0 RAFFLES STANDARD ROOM TYPE "A6" MOCK UP BOQ 258,812.73 258,812.73
39.0 FAIRMONT STANDARD ROOM TYPE "B" MOCK UP BOQ 190,899.30 190,899.30
R
e
Reconciled / m
Approved Amount a
Local (P) r
k
s

14,898.51
45,494.23
(292,145.96)

114,627.17
Qty Reconciled

22,779.83
Qty Reconciled
195,002.12
226,660.18
543,809.73
871,125.81

6,836.53
28,240.50
(705,196.14)
75,430.34
233,409.99
8,276.95
59,594.04
41,388.94
877,765.25
271,483.96
421,525.10
(268,727.88)
(172,326.93)
(73,818.46)
241,166.82
79,779.93
20,002.04
53,483.83
1,198,314.81

115,226.60
81,528.48
196,755.08
e
Reconciled / m
Approved Amount a
Local (P) r
k
3,310.78 s

(1,192,164.56)
1,529,514.54
(8,319,635.52)
(7,978,974.76)

269,330.42
-10,827.01
-144,329.01
1,408,675.41
825,722.64
2,286,423.39
795,937.03
(1,966,180.96)
409,845.42
3,874,597.34

(1,702,512.19)
1,702,512.19
29,596.35
213,026.64
168,134.55
BETA ELECTRIC CORPORATION
FAIRMONT HOTEL, RAFFLE SUITES AND RESIDENCES

Item Submission Reconciliation Approval of Variation


No. VO No. Location Date Date Order / PMI issuance

BATCH 1
1.0 VO-E-01 BASEMENT 3 - AREA A, B, & C 16-Dec-09 21-Apr-10 Awaiting
2.0 VO-E-02 BASEMENT 2 - AREA A, B, & C 16-Dec-09 21-Apr-10 Awaiting
3.0 VO-E-03 BASEMENT 1 - AREA A, B, & C 16-Dec-09 21-Jul-10 Awaiting
4.0 VO-E-04 GROUND FLOOR - All Areas & Area A, B, & C 16-Dec-09 26-May-10 Awaiting
GROUND FLOOR - All Areas & Area A, B, & C (POWER)
GROUND FLOOR - All Areas & Area A, B, & C (LIGHTING)
5.0 VO-E-05 LEVEL 2 Area A and Area C1 & Area A,B & C 16-Dec-09 26-Aug-10 Awaiting
LEVEL 2 Area A and Area C1 & Area A,B & C (POWER)
LEVEL 2 Area A and Area C1 & Area A,B & C (LIGHTING)
6.0 VO-E-06 LEVEL 3 - Admin Offices G.L. A-L / 2-4 16-Dec-09 7-May-10 Awaiting
7.0 VO-E-07 LEVEL 4 Power Layout (GYM/ FITNESS CENTER) 16-Dec-09 9-Aug-10 Awaiting
8.0 VO-E-08 LEVEL 5 to LEVEL 8 Hotel Rooms/ Suites (circuit homerun) 16-Dec-09 13-Aug-10 Awaiting
BETA ELECTRIC CORPORATION
FAIRMONT HOTEL, RAFFLE SUITES AND RESIDENCES

Item Submission Reconciliation Approval of Variation


No. VO No. Location Date Date Order / PMI issuance

BATCH 2
9.0 VO-E-11 GROUND FLOOR - Area A and C 21-May-10 9-Aug-10 Awaiting
10.0 VO-E-12 LEVEL 2 - Area A and C 21-May-10 30-Jul-10 Awaiting
11.0 VO-E-13 LEVEL 4 - Area B and C (Willow Spa) 21-May-10 24-Aug-10 Awaiting
12.0 VO-E-14 LEVEL 7 - Area C 21-May-10 9-Aug-10 Awaiting
13.0 VO-E-15 LEVEL 9 - Japanese Restaurant 21-May-10 16-Aug-10 Awaiting
14.0 VO-E-16 LEVEL 9 - Japanese Restaurant 21-May-10 9-Aug-10 Awaiting
15.0 VO-E-17 LEVEL 9 - Raffles Lounge and Business Center 21-May-10 24-Aug-10 Awaiting
16.0 VO-E-18 Additional and Deleted Panel Boards 21-May-10 24-Aug-10 Awaiting
17.0 VO-E-19 VARIATION OF WIRING SCHEDULE 21-May-10 27-Aug-10 Awaiting
18.0 VO-E-20 GOLD LOUNGE 21-May-10 24-Aug-10 Awaiting
19.0 VO-E-21 LEVEL 14, 15, 16, 17, 19 and 21 - Hallway 21-May-10 2-Aug-10 Awaiting
20.0 VO-E-22 LEVEL 18, 20, 22 and 23 - Hallway 21-May-10 2-Aug-10 Awaiting
21.0 VO-E-23 LEVEL 24, 25, 26-28 - Hallway 21-May-10 16-Aug-10 Awaiting
22.0 VO-E-24 LEVEL 29-30 - Hallway 21-May-10 9-Aug-10 Awaiting
23.0 VO-E-25 Fairmont Presidential Suite 21-May-10 24-Aug-10 Awaiting
24.0 VO-E-26 Raffles Presidential Suite 21-May-10 9-Aug-10 Awaiting
25.0 VO-E-27 Level 2 Outdoor Garden 21-May-10 30-Jul-10 Awaiting
26.0 VO-E-28 Level 10 Outdoor Garden 21-May-10 16-Aug-10 Awaiting

BATCH 3

27.0 VO-E-29 Willow Spa 8-Jun-10 24-Aug-10 Awaiting


28.0 VO-E-30 Additional Dupelx Convenience Outlet for A-1 Left (Level 14-17, 19, 20) 8-Jun-10 24-Aug-10 Awaiting
SUBTOTAL
BATCH 4

29.00 VO-E-31 Level 9 Raffles Lounge, Business Center and Public Toilet 16-Jul-10 24-Aug-10 Awaiting
30.00 VO-E-32 DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE 16-Jul-10 4-Aug-10 Awaiting
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -A
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -B
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -C
SUBTOTAL
BATCH 5

31.00 Lighting system and power system at Level 12 (GD K-L/5-8) 25-May-10
SUBTOTAL
Other Cost Proposal
32.0 Basement 1 Mezzanine 21-May-10 24-Aug-10 Awaiting
33.0 Deletion of Dumbwaiter 8-Jun-10 9-Nov-10 Awaiting
34.0 Deletion of GFCI for Fairmont Hotel and Raffles Suites 8-Jun-10 9-Nov-10 Awaiting
35.0 Relocation of Uninterruptible Power Supply (UPS) 8-Jun-10 5-Aug-10 Awaiting
36.0 Relocation of Panelboard from Ceiling to wardrobe 11-Jan-10 16-Aug-10 Awaiting
37.0 FCD vs. Mock-up Setting out 9-Nov-10 Awaiting
38.0 Free standing 9-Nov-10 Awaiting
Item Submission Reconciliation Approval of Variation
No. VO No. Location Date Date Order / PMI issuance

39.0 Deletion of BCP, KTH/RCP 9-Nov-10 Awaiting


40.0 Back of the house Lighting 13-Nov-10 Awaiting
SUBTOTAL

TOTAL AMOUNT OF V.O.

37.0 CORRIDOR MOCK UP BOQ


38.0 RAFFLES STANDARD ROOM TYPE "A6" MOCK UP BOQ
39.0 FAIRMONT STANDARD ROOM TYPE "B" MOCK UP BOQ
BETA ELECTRIC CORPORATION
FAIRMONT HOTEL, RAFFLE SUITES AND RESIDENCES

Item Submission Reconciliation Approval of Variation


No. VO No. Location Date Date Order / PMI issuance

BATCH 3

27.0 VO-E-29 Willow Spa 8-Jun-10 24-Aug-10 Awaiting


28.0 VO-E-30 Additional Dupelx Convenience Outlet for A-1 Left (Level 14-17, 19, 20) 8-Jun-10 24-Aug-10 Awaiting

BATCH 4

29.00 VO-E-31 Level 9 Raffles Lounge, Business Center and Public Toilet 16-Jul-10 24-Aug-10 Awaiting
30.00 VO-E-32 DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE 16-Jul-10 4-Aug-10 Awaiting
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -A
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -B
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -C

BATCH 5

31.00 Lighting system and power system at Level 12 (GD K-L/5-8) 25-May-10

Other Cost Proposal


32.0 Basement 1 Mezzanine 21-May-10 24-Aug-10 Awaiting
33.0 Deletion of Dumbwaiter 8-Jun-10 9-Nov-10 Awaiting
34.0 Deletion of GFCI for Fairmont Hotel and Raffles Suites 8-Jun-10 9-Nov-10 Awaiting
35.0 Relocation of Uninterruptible Power Supply (UPS) 8-Jun-10 5-Aug-10 Awaiting
36.0 Relocation of Panelboard from Ceiling to wardrobe 11-Jan-10 16-Aug-10 Awaiting
37.0 FCD vs. Mock-up Setting out 9-Nov-10 Awaiting
38.0 Free standing 9-Nov-10 Awaiting
39.0 Deletion of BCP, KTH/RCP 9-Nov-10 Awaiting
40.0 Back of the house Lighting 13-Nov-10 Awaiting

37.0 CORRIDOR MOCK UP BOQ


38.0 RAFFLES STANDARD ROOM TYPE "A6" MOCK UP BOQ
39.0 FAIRMONT STANDARD ROOM TYPE "B" MOCK UP BOQ
BETA ELECTRIC CORPORATION
FAIRMONT HOTEL, RAFFLE SUITES AND RESIDENCES

Item Date Submitted Submitted Approval of Variation


No. Description to DMCI Amount Order / PMI issuance

1.0 Cost proposal for audio/video system 9-Sep-10 332,726.70 for reconciliation
2.0 Cost proposal for additional works for Meralco Service Entrance 8-Nov-10 49,490.35 for reconciliation
3.0 Cost proposal for Power Supply for Garbage, Linen, and Kitchen Chute 10-Dec-10 242,515.57 for reconciliation
4.0 Cost proposal for Power Supply for Luggage Screening and Body Scanner 10-Jan-11 59,682.36 for reconciliation
5.0 Additional power and lighting layout at Level 3 Admin Offices 20-Jan-11 663,598.18 for reconciliation
Total 1,348,013.16
BETA ELECTRIC CORPORATION
FAIRMONT HOTEL, RAFFLE SUITES AND RESIDENCES

Item Submitted Resubmitted Reconciled /


VO No. Location Approved Amount
No. Amount Amount Local (P)

BATCH 1
1.0 VO-E-01 BASEMENT 3 - AREA A, B, & C 14,898.51 14,898.51 14,898.51
2.0 VO-E-02 BASEMENT 2 - AREA A, B, & C 67,614.43 67,614.43 45,494.23
3.0 VO-E-03 BASEMENT 1 - AREA A, B, & C 1,176,024.05 (292,145.96) (434,246.06) -434246.06
4.0 VO-E-04 GROUND FLOOR - All Areas & Area A, B, & C 1,496,640.72
GROUND FLOOR - All Areas & Area A, B, & C (POWER) 114,627.17 114,627.17
GROUND FLOOR - All Areas & Area A, B, & C (LIGHTING)
5.0 VO-E-05 LEVEL 2 Area A and Area C1 & Area A,B & C 2,263,544.79
LEVEL 2 Area A and Area C1 & Area A,B & C (POWER) 22,779.83 22,779.83
LEVEL 2 Area A and Area C1 & Area A,B & C (LIGHTING)
6.0 VO-E-06 LEVEL 3 - Admin Offices G.L. A-L / 2-4 203,595.82 203,595.82 195,002.12
7.0 VO-E-07 LEVEL 4 Power Layout (GYM/ FITNESS CENTER) 332,895.44 332,895.44 226,660.18
8.0 VO-E-08 LEVEL 5 to LEVEL 8 Hotel Rooms/ Suites (circuit homerun) 1,135,647.30 543,809.73 543,809.73
SUBTOTAL 6,690,861.06 1,008,074.97 729,025.71
TOTAL AMOUNT OF V.O. 16,232,496.95 (2,077,642.05) (2,071,355.40)
2,077,642.05 2,071,355.40
37.0 CORRIDOR MOCK UP BOQ 27,653.29 27,653.29 29,596.35
38.0 RAFFLES STANDARD ROOM TYPE "A6" MOCK UP BOQ 258,812.73 258,812.73 213,026.64
BETA ELECTRIC CORPORATION
FAIRMONT HOTEL, RAFFLE SUITES AND RESIDENCES

Reconciled /
Item VO No. Location Submitted Resubmitted Approved Amount
No. Amount Amount Local (P)

BATCH 2
9.0 VO-E-11 GROUND FLOOR - Area A and C 19,581.53 19,581.53 6,836.53
10.0 VO-E-12 LEVEL 2 - Area A and C 28,240.50 28,240.50 28,240.50
11.0 VO-E-13 LEVEL 4 - Area B and C (Willow Spa) 965,730.39 (705,196.14) (705,196.14)
12.0 VO-E-14 LEVEL 7 - Area C 313,924.15 313,924.15 64,788.26
13.0 VO-E-15 LEVEL 9 - Japanese Restaurant 417,647.92 417,647.92 233,409.99
14.0 VO-E-16 LEVEL 9 - Japanese Restaurant 17,909.40 17,909.40 8,276.95
15.0 VO-E-17 LEVEL 9 - Raffles Lounge and Business Center 172,059.32 59,594.04 59,594.04
16.0 VO-E-18 Additional and Deleted Panel Boards 51,408.95 51,408.95 41,388.94
17.0 VO-E-19 VARIATION OF WIRING SCHEDULE 1,339,175.28 849,012.80 797,333.76
18.0 VO-E-20 GOLD LOUNGE 421,194.38 421,194.38 271,483.96
19.0 VO-E-21 LEVEL 14, 15, 16, 17, 19 and 21 - Hallway 392,806.14 392,806.14 421,525.10
20.0 VO-E-22 LEVEL 18, 20, 22 and 23 - Hallway 49,663.28 (268,727.88) (268,727.88)
21.0 VO-E-23 LEVEL 24, 25, 26-28 - Hallway 158,751.20 (172,326.93) (172,326.93)
22.0 VO-E-24 LEVEL 29-30 - Hallway 1,305.66 (73,818.46) (73,818.46)
23.0 VO-E-25 Fairmont Presidential Suite 304,311.73 304,311.73 241,166.82
24.0 VO-E-26 Raffles Presidential Suite 81,704.45 81,704.45 79,779.93
25.0 VO-E-27 Level 2 Outdoor Garden 27,788.91 27,788.91 20,002.04
26.0 VO-E-28 Level 10 Outdoor Garden 53,483.83 53,483.83 53,483.83
SUBTOTAL 4,816,687.02 1,818,539.32 1,107,241.24
2,077,642.05 2,071,355.40
37.0 CORRIDOR MOCK UP BOQ 27,653.29 27,653.29 29,596.35
38.0 RAFFLES STANDARD ROOM TYPE "A6" MOCK UP BOQ 258,812.73 258,812.73 213,026.64
39.0 FAIRMONT STANDARD ROOM TYPE "B" MOCK UP BOQ 190,899.30 190,899.30 168,134.55
BETA ELECTRIC CORPORATION
FAIRMONT HOTEL, RAFFLE SUITES AND RESIDENCES
VO No. Reconciled /
Item Submitted Resubmitted Approved Amount
No. Location Amount Amount Local (P)

BATCH 3

27.0 VO-E-29 Willow Spa 177,713.39 177,713.39 115,226.60


28.0 VO-E-30 Additional Dupelx Convenience Outlet for A-1 Left (Level 14-17, 19, 20) 81,528.48 81,528.48 81,528.48
SUBTOTAL 259,241.87 259,241.87 196,755.08
BATCH 4

29.00 VO-E-31 Level 9 Raffles Lounge, Business Center and Public Toilet 99,683.60 3,310.78 3,310.78
30.00 VO-E-32 DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE 14,640,661.74
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -A (1,192,164.56) (1,192,164.56)
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -B 1,529,514.54 1,529,514.54
DISCREPANCY BETWEEN IFC REV. 1 VS. IFC REV. 2 OF LOAD SCHEDULE -C (8,319,635.52) (8,319,635.52)
SUBTOTAL 99,683.60 (7,978,974.76) (7,978,974.76)
BATCH 5

31.00 Lighting system and power system at Level 12 (GD K-L/5-8) 179,677.99
SUBTOTAL 179,677.99 - -
Other Cost Proposal
32.0 Basement 1 Mezzanine 310,530.71 310,530.71 269,330.42
33.0 Deletion of Dumbwaiter -10,827.01 -10,827.01
34.0 Deletion of GFCI for Fairmont Hotel and Raffles Suites -144,329.01 -144,329.01
35.0 Relocation of Uninterruptible Power Supply (UPS) 1,603,846.22 1,603,846.22 1,408,675.41
36.0 Relocation of Panelboard from Ceiling to wardrobe 901,099.62 901,099.62 825,722.64
37.0 FCD vs. Mock-up Setting out 2,286,423.39 2,286,423.39
38.0 Free standing 795,937.03 795,937.03
39.0 Deletion of BCP, KTH/RCP (1,966,180.96) (1,966,180.96)
40.0 Back of the house Lighting 409,845.42 409,845.42
SUBTOTAL 4,186,345.41 2,815,476.55 3,874,597.34

TOTAL AMOUNT OF V.O. 16,232,496.95 (2,077,642.05) (2,071,355.40)


2,077,642.05 2,071,355.40
37.0 CORRIDOR MOCK UP BOQ 27,653.29 27,653.29 29,596.35
38.0 RAFFLES STANDARD ROOM TYPE "A6" MOCK UP BOQ 258,812.73 258,812.73 213,026.64
39.0 FAIRMONT STANDARD ROOM TYPE "B" MOCK UP BOQ 190,899.30 190,899.30 168,134.55