International Journal of Trend in Scientific Research and Development (IJTSRD)

Volume 5 Issue 2, January-February 2021 Available Online: www.ijtsrd.com e-ISSN: 2456 – 6470

BIM Competencies for Minimizing the Construction Remnant of


Project Moving Forward from Linear to Circular Economy
Ms. K. Niranjana1, Mrs. G. Anbu Neema2
1Student, 2Assistant
Professor,
1,2Department of Civil, Meenakshi Sundararajan Engineering College, Kodambakkam, Chennai, India

ABSTRACT How to cite this paper: Ms. K. Niranjana |


A modern lifestyle, alongside the advancement of technology has led to an Mrs. G. Anbu Neema "BIM Competencies
increase in the type of waste and its amount and being generated, leading to a for Minimizing the Construction Remnant
waste disposal catastrophe. Therefore in the past decades, construction and of Project Moving Forward from Linear to
demolition (C&D) waste issues have received increasing attention from both Circular Economy"
practitioners and as well as from researchers around the world. An affordable Published in
waste management action to reduce waste at all phases of design and International Journal
construction with special consideration to the long-term environmental and of Trend in Scientific
economic impacts of continuous waste generation. Therefore, many studies on Research and
coherent C&D waste minimization and management have been conducted. Development (ijtsrd),
Although 21 process-related and 8 technology-related limitations in C&D ISSN: 2456-6470, IJTSRD38642
waste management and minimization have not yet been resolved. Building Volume-5 | Issue-2,
information modeling (BIM) helps project participants improve the processes February 2021, pp.1129-1135, URL:
involved and technologies in the planning, design, construction, and www.ijtsrd.com/papers/ijtsrd38642.pdf
demolition phases, thereby managing and minimizing C&D waste efficiently.
Therefore, this paper identifies for coherent C&D waste management and Copyright © 2021 by author (s) and
minimization, such as phase planning, site utilization planning, 3D International Journal of Trend in Scientific
coordination, design review, quantity take-off, construction system design, Research and Development Journal. This
digital fabrication, and 3D control and planning BIM has the potential is an Open Access article distributed
opportunities. The BIM based approaches would C&D waste management and under the terms of
minimization processes and technologies by addressing existing limitations the Creative
through in-depth literature review. Commons Attribution
License (CC BY 4.0)
KEYWORDS: Construction waste management, classification of CW, source of CW, (http://creativecommons.org/licenses/by/4.0)
sustainable waste management, BIM

INTRODUCTION Construction Waste


Construction industry provides one of basic requirement i.e. Construction industry plays a key role in socio-economic
shelter of the civilized population. On another hand with development of the country. Nowadays with rapid growth
increased living standard, infrastructure demand projects, construction industry has contributed significantly towards
changes in consumption habits, as well as natural increase in waste generation which has become serious problem for
population has become serious problem for every nation in every nation. The grievous problem is the significant amount
terms of acceptable amount waste generation. of construction activities on one hand and also the poor
construction waste management (CWM) on the other. Several
To overcome these gaps and to enable better management
researchers and practitioners indicate that waste emanates
level guidance over construction waste, during entire phase
that occur during planning, design, procurement, and also in
of project, a new modeling technique is proposed in this
construction stage. The waste also influences economical
paper
dynamics of society and also has an unenviable effect on the
Circular Economy Concept environment and surrounding.
Increased global attention towards the concept\ of the
Construction waste is one among the most harmful wastes
circular economy owing to the need for managing the finite
that has been generated. Further there is no lack of
resources efficiently. The concept of circular economy was
management level guidance in construction industry to
widely accepted and promoted by business and governments
manage wastage during construction execution level puts an
because it is regarded as the solution for reconciling the
additional pressure.
seemingly conflicting objectives of businesses and
environmental sustainability These include waste-to-energy, It is a common practice for construction waste to be used for
supply chain, waste-to- resource supply chain, eco-industrial landfill, leads to extensive amounts of soil, water, and air
park, cradle-to- cradle, industrial ecology, regenerative pollution due to production of CO2 and methane from
design product- service-system, blue economy, design-for- anaerobic degradation of the waste. It also brings
deconstruction All these concepts form the basis for what is tremendous pressure on valuable landfill space, particularly
known as today‘s Circular Economy and the common feature in compact urban spaces like as those in Hong Kong,
among them is the need to manage resources, minimize Singapore, and Japan. Researchers and practitioners of the
waste and to protect the environment. industry have thus endeavored to manage construction waste

@ IJTSRD | Unique Paper ID – IJTSRD38642 | Volume – 5 | Issue – 2 | January-February 2021 Page 1129
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
by devising engineering, economical, policy and managerial instead of virgin materials amongst the various management
approaches. and workforce in construction firms of India.
Globally Existing Condition of Construction Waste Data collection on construction waste management in India is
Debris from construction and demolition projects constitutes challenging and tedious due to lack of documentation on
about 35% of solid waste in the world; the majority ends up waste generation at construction sites. The Indian
in landfills, in uncontrolled sites or in other inappropriate construction industry can be fragmented into small, medium
places. and large constructions. Smaller construction sites do not
indent to employ waste management at their sites. The
A construction and demolition activity generates about 32%
practices encountered for handling waste at construction
landfill waste and 25% of all used raw materials in the United
sites include: dump onto the sides of the roads; disposal into
Kingdom (UK). The consumption increased from 420 million
water bodies and low lying areas making data collection
tons in 2003 to 470 million tons in2013. Currently, the UK
difficult. Large construction sites clear up the waste through
construction industry produces about 120 million tons of
conducting―pep talks‖ that addresses issues associated with
waste, of which 13million tons are materials that have been
housekeeping and adapting procedures such as implementing
delivered to the site but are never used.
―wall of fame‖ and wall of shame‖ at their construction sites.
In U.S., the estimated amount of building-related waste These companies reuse waste generated at site as the land
generated in 2003 was about 170 million tons. It has been filling and market waste through local vendors. It is stated by
reported that the amount of CW in China had reached 1.5 Hansen that the number of disposal sites is being
billion tons in 2014, with most of the waste disposed of considerably decreased worldwide and thus need for
through land filling and illegal dumping, a decline from peak alternative solutions are to be investigated.
C & D activity in the early 2010s.
Classification of Waste
Construction and demolition activities generate about 44% of Construction waste can be clustered into two categories
all waste generated within England. namely; physical and non-physical waste as shown in Fig. 1
The EC (European Commission) reported that construction Figure 1 Classification of construction waste.
waste is responsible for 25–30% of total waste generated in
the European Union.
Indian Scenario of Construction Waste
In India the annual investment in construction activities is
around 70 billion dollars and an additional investment of 50
billion dollars is expected for an annual growth rate of 15%.
It is estimated that 163 billion dollars are needed for
supporting infrastructure in the next 10 years. It stated that
there is a shortage of about 41 million housing units to
sustain the needs of the current population.
Estimated the material requirement for the housing sector
Physical wastes are generated in the form of material loss;
require 55,000 million m3 whereas the road sector requires
contribute to a significant part of landfill. On the other hand,
an additional quantity of 750 million m3.The rapid increase in
non-physical construction wastes mainly are nothing but
construction activities pollute the environment due to waste
time and cost overrun for construction projects; these
generation. According to the global statistical reports, it is
problems would become more critical when a stoppage of a
stated that the construction industry is considered as one of
particular construction work and this cause the abandoning
the bulk generators of waste. Annually of about 10–12 million
of the project.
tons of waste is being generated in the Indian construction
industry. However, this number is misleading since this only A. Materials Waste in form of Physical Construction
includes the waste that is properly disposed and accounted Waste
for; there is also the practice of dumping construction waste The major physical waste generated from construction
by the roadside or on an empty plot of land and these activity is identified in the form of material waste like
activities are never been documented. concrete leftover, steel scrap, demolished debris and others.
Studies show that material waste has significant impact to the
These kinds of waste disposal practices are quite prevalent
project cost as well as an adverse environment impact. One of
and make the waste estimation process impossible and
the implications created from huge material quantities of
challenging in Indian context.
waste is being illegal dumped. Illegal dumping is the unlawful
India has the relevant regulations for waste management but deposit activity of waste onto land area and this unethical
owing to their weak enforcement, construction firms place activity always cause problems to the public in general and to
enforcement of waste management and reduction at the the environment in many places around the world. Wrongly
bottom of their agenda due to the complexity of incorporating disposal of are increasing and this contributes to pollution
them within the existing system. India is one of the top ten globally. Various countries are bogged down by this issue of
countries utilizing natural resources to satisfy the illegal dumping of their waste.
construction needs. Recycled materials such as aggregate
Material waste significantly contributes additional cost to
originated from demolition reduce the demand for aggregates
construction because it usually involves new purchases to
in the construction industry nearly about 12.3 million tons of
replace wasted materials; rework costs, delays, and disposal
raw materials can be conserved with proper recycling. There
cause financial losses.
is considerable resistance to usage of recycled aggregates

@ IJTSRD | Unique Paper ID – IJTSRD38642 | Volume – 5 | Issue – 2 | January-February 2021 Page 1130
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
B. Cost and Time Overrun in form of Non-Physical Sustainable Construction Waste Management
Waste The numerous research works carried out on construction
Construction industries are extremely concerned about waste and the findings show several negative impacts to the
projects time and costs. Globally most of these projects are social, environment and economy of a country. These
having dilemma in cost and time overruns which normally impacts also contribute to reduced construction productivity
occurs during the construction process. In contrast to the and thus reduce the performance of the overall construction
material waste, non-physical waste occurs when materials project. These negative impacts are pushing the construction
are not physically lost but money and time overrun can lead industry to move toward sustainability by integration with
to majority projects failure i.e. the issue of time and cost sustainable approach. One of the effective ways to control
overrun in construction. Projects are becoming epidemic and CW is to adopt sustainable construction principles as
have led to abandonment of many projects across the world. sustainable construction is not only focused on
These problems are caused by poor financial management by environmental issues but also on economic and social
the developers, wrong construction specification, lack of aspects. Sustainability in CW can be seen as stepwise
supervision, construction delays and lack of enforcement on strategy to achieve desirable and most suited process
existing rules. This has caused dissatisfaction of the buyers of depending on the conditions and waste generated type. This
abandoned homes and a tensed social relationship among process can be converted into the waste management
developers and buyers have become prevalent which hierarchy, as shown in Fig. 2, which includes prevention,
indirectly resulted into unhealthy conditions and also in minimization, reuse, recycling, recovery and disposal of
declining purchasing power of new houses. In other words, construction wastes.
non-physical waste has its impact on economic growth and
social development of countries.
Sources of Waste Generation
Construction material waste arises from varied sources such
as design, logistics, and physical construction processes.
According to Sir Egan‘s Rethinking Construction report on the
state of UK construction industry, up to 30% of all
construction rework occurs, labour is used to half of its
potential efficiency, and at least 10% of building materials for
every construction project is wasted.
CW (Construction waste) generation occurs throughout the
project from the pre- construction stage, rough construction
stage and finishing stage. Generation of CW can be caused by Figure 2 Hierarchy of Sustainable waste management
various factors and it also very important to identify and
understand those causes for controlling waste generation at 1. Prevention - best way to manage waste
source. 2. Minimization /reduction - second most preferable way
3. Prevention & minimization- most used approach by
Extensive literature review was conducted to identify causes many countries
of construction waste in terms of their contributions and 4. Recycling of waste – but has good potential
impacts. These results identified 81 factors categorized 5. Recovery - ranked fifth priority.
broadly into seven groups of construction waste into six 6. Disposal -last option, lowest criterion
categories: Procurement, Design, Material handling,
Operations, External factor, Residual and Others as indicated Most recommended waste management principle is which
in following table. Identification of the causative factors can should be considered to apply from highest desirability step
help in awareness increment in construction practitioners to i.e. prevention to lower priority steps.
control construction waste. Strategy Framework for waste-efficient projects
Table 1 Table of Classification of Waste based on The strategies for delivering waste-efficient projects could
source be categorized under six different groups, as shown in Figure
Sources of 3 as per the literature review
Causes
waste
Ordering error, supplier‘s error resulting
Procurement
in excessive materials on site
Design Changes to design, documentation error
Material Transportation, off-loading, and in
handling appropriate storage
Tradesperson‘s error, for example,
Operations Installing wrong materials and having to
remove such materials
Weather -Humidity, temperature,
External
vandalism- Inadequate security,
factor
Inadequate security
Residual Cutting materials to sizes
Lack of waste management plan, Figure 3 six different Strategy Framework for waste-
Festival celebration, Difficulties efficient projects
Others
accessing construction site.

@ IJTSRD | Unique Paper ID – IJTSRD38642 | Volume – 5 | Issue – 2 | January-February 2021 Page 1131
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
BIM- Building information modeling 18. Better Collaboration BIM facilitates early participation
Building information modeling (BIM) can be utilized as a less of all the stakeholders and simultaneous work carried
expensive, virtual, and also as the computational out by them and there by shortening the design time and
environment to enable designers to ponder different design reducing errors and omissions. Thus helps to reduce
options, or contractors to evaluate different construction cost by doing simultaneous value engineering and not at
scheme with a view to minimizing construction waste the end of design process.
generation. 19. Generation of accurate and also consistent 2D drawings
BIM helps participants of the project to improve the at any stage and it can be extracted at any time in the
processes and technologies in the planning, design, project process. If any changes are incorporated in the
construction, and demolition phases, thereby managing and model, it is updated immediately and also accurately and
minimizing C&D waste efficiently. For coherent C&D waste hence generation of fully consistent drawing can be
management and minimization, such as design review, phase done as soon as design modifications are entered.
planning, 3D coordination, quantity take-off, site utilization 20. The design intent of a building both quantitatively and
planning, construction system design, digital fabrication, and qualitatively (3D visualization) can be checked early in
3D control and planning BIM has the potential opportunities. the process. Thus helps in accurate and early estimating
The BIM-based approaches would able to support C&D waste the cost.
management and minimization processes and technologies 21. More predictable and better understandable controlled
by addressing existing limitations through in-depth literature whole-life costs and environmental data Environmental
review. performance and life cycle costs can be estimated.
A. BIM Assistance in CWM 22. Detection of errors and omissions (Clash detection) is
BIM is likely to impinge on the complete process of building the most rated way of saving owners time and money
documentation to shift from architectural drawings into a using BIM. Clash detection: In traditional 2D drawings,
computerized model. BIM can already demonstrate all of the any changes in one drawing are not updated in other
individual elements as in below description. However it related drawings leading to many inconsistency and
cannot yet achieve all of these benefits incrementally without hence lots of errors and omissions. Lot of these errors is
separate dedicated interface. detected only after the execution of work at the site,
which might lead to many site conflicts, legal disputes
1. Provide project visualization.
and change orders. However, BIM usage eliminates
2. Build fundamental intelligence into 2D (drawings) these issues. Identification of conflicts can be done on
3. Provide a single database of information that meets the beforehand than they rather detected at site and hence
needs of all stakeholders involved. enhanced co-ordination between the designers and the
4. A beneficial project management tool contractors. Detection of errors speeds the construction
process; there by reduces costs, minimizes legal
5. Enhance issue tracking process
disputes and provides a better project process.
6. Provide seamless information flow
23. Reducing conflicts and modifications. The errors and
7. Yields automated bills of material (Reduce the bidding omissions are detected early in the design and results in
time and effort) fewer conflicts and changes. The reduced conflicts and
8. Provision of shop drawings automatically changes add maximum value to the project.
9. Off-site prefabrication Facility B. BIM in Waste Minimization.
10. Simplified material ordering and also ease site The challenge now is provision of a novel platform for the
management next generation of tools and techniques that would identify
11. Improve field coordination and there by significantly and resolve the fundamental causes and origins of
reducing interferences construction waste. The basis for such an approach could
utilize Building Information Modeling (BIM) and related
12. Change orders have been reduced
technologies, in particular Virtual Prototyping, in order to
13. Cost saving and time reduction at every phase of design provide a platform for ‘virtual’ waste evaluation which
and construction reviews and assesses the of waste generation though out all
14. Provide owner with live and also intelligent file records stages of the construction project lifecycle. Although BIM
(Provide electronic links for service) and maintenance design methods are not currently as fully utilized in the
Facilitate peak building performance throughout a life construction industry as in other industries, but there is
cycle general recognition that BIM adoption will become more
15. Faster and also more effective processes pronounced to demonstrate not only the entire building life
cycle but also aid an assess and evaluate the environmental
16. Better design models can be rigorously analyzed; performance an impacts of buildings
simulations can be performed quickly and
benchmarking can be performed. Better communication C. BIM expectations for CDW management
and understanding from 3D visualization by using BIM. Five major categories of BIM expectations for CDW
17. Reducing Rework, problems are fixed early in the design management, which are:
and hence resulting in fewer issues in the plans and 1. BIM-based collaboration for waste management,
hence fewer hassles. Any design changes entered to the 2. waste-driven design process and solutions,
building model gets automatically updated. Resulting in 3. innovative technology in waste intelligence and
less rework that can occurs due to possible drawing analytics,
errors or omissions. There by reducing rework is very 4. Waste analysis throughout building lifecycle and
important and BIM helps in achieving it. 5. Improved documentation for waste management.

@ IJTSRD | Unique Paper ID – IJTSRD38642 | Volume – 5 | Issue – 2 | January-February 2021 Page 1132
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
D. Constraints in BIM Applicability However, these integrated systems in the construction sector
Limitations in adopting C&D waste management and present information gaps and a set of unique challenges. BIM
minimization helps project participants improve the processes and
1. Avoidance conflict of long periods of on-site storage technologies in the planning, design, construction, and
demolition phases, thereby managing and minimizing C&D
2. Non-including of detailed cost in the budget about C&D
waste efficiently. There is a lively debate on the application of
waste management strategies (labor, auxiliary elements,
Building Information Modeling (BIM) to construction waste
transportation, taxes, etc.).
management (CWM). BIM can be utilized as a less expensive,
3. Non-estimating the types and quantities of generated virtual, and also as a computational environment to enable
C&D waste for each phase of work. designers to ponder different design options, or contractors
4. The limited quantity of C&D waste being reused and to evaluate different construction schemes with a view to
recycled. minimizing construction waste generation. The goal of the
5. Possibilities to utilization in construction activities that BIM implementation success model is to better evaluate, plan,
can admit reusable materials were not analyzed. and implement BIM projects and also help senior managers
make better decisions when considering
6. Design to reduce the amount of used materials was not
optimized. BIM systems in their organizations towards minimization of
7. Design changes frequent occurrence. waste, there by promoting a socio- economical project. To
attain the goal of a circular economy within the construction
8. During the design phase standardization and
industry, various CWM strategies aiming to reduce
dimensional coordination of building elements were not
construction waste to the barest minimum with proposed the
considered.
wide adoption of BIM. Circular economy in construction is
9. Frequent occurrence of unnecessary material handling generally associated with physical waste generated during
than can lead to fracture of materials on site. onsite executed construction activities.
10. Non-tracking of movement of generated C&D waste from
Reference
the moment it was generated right up to its final
[1] Alicia & co, Hongping Yuan (2013), ‘A SWOT analysis
destination.
of successful construction waste management‘,
11. Inadequate space on site for provision for correct C&D Journal of Cleaner Production.
waste management.
[2] Amal Bakchan; Beatriz C. Guerra, & co (2019), ‘BIM-
12. Non storage of materials in a protected area on site to
Based Estimation of Wood Waste Stream‘, The Case of
prevent premature damage.
an Institutional Building Project Computing in Civil
13. On-site waste sorting was not done at the event of C&D Engineering.
waste was generated.
[3] Amal Bakchana, Kasey M. Faustb, Fernanda Leiteb
14. Non-separating the hazardous waste and storing in
(2019), ‘Seven- dimensional automated construction
suitable containers clearly labeled and kept under cover.
waste quantification and management framework:
15. A coordinator for C&D WM (waste management) plan Integration with project and site planning Resources‘,
was not designated and responsible for ensuring that Conservation & Recycling 146 (2019) 462–474.
the plan was followed on site.
[4] Arif M, Bendi D, Sabbagh TT, et al. (2012),
16. All stakeholders were not involved in the coordination
‘Construction waste management in India: An
of the C&D WM during the planning and design phases.
exploratory study‘, Construction Innovation 12: 133–
17. Communication among project participants to improve 155.
C&D WM and minimization was poor
[5] Arif M, Egbu C, Haleem A, et al. (2009a), ‘Green
18. A C&D WM plan needs to be applied and compliance was
construction in India: Gaining a deeper
not ensured on site.
understanding‘, Journal of Architectural Engineering
19. The construction site should to be kept clean and also 15: 10–13.
well organized.
[6] Assem Al-Hajj KH (2011), ‘Material Waste in the UAE
20. Coordination and review meetings for C&D WM and
construction industry: Main causes and minimization
minimization were not planned appropriately and
practice‘, Architectural Engineering and Design
regularly.
Management 7: 37–41.
21. Non avoidance of conventional construction processes
that can lead to additional construction waste [7] Beatriz C. Guerra, Amal Bakchan a, Fernanda Leite, &
generation. (e.g., timber formwork, bamboo scaffold, co, (2019), ‘BIM- based automated construction waste
etc.). estimation algorithms: The case of concrete and
drywall waste streams‘, Waste Management.
Conclusion
The application and the potential use of building information [8] Binxin Yang , Xiangnan Song , Hongping Yuan , Jian
modeling (BIM) to drive out construction waste generation Zuo (2020), ‘A model for investigating construction
during all the phase of the construction was investigated workers‘ waste reduction behaviours‘, Journal of
through an extensive literature review. Recently, a significant Cleaner Production 265.
number of major construction companies embarked on the [9] Clyde Zhengdao Li , Yiyu Zhao, Bing Xiao , Bo Yu,
implementation of integrated information technology Vivian W. Y. Tam , Zhe Chen , Yingyi Ya (2020),
solutions such as BIM, Enterprise resource planning (ERP) ‘Research trend of the application of information
systems to better integrate various business functions. technologies in construction and demolition waste

@ IJTSRD | Unique Paper ID – IJTSRD38642 | Volume – 5 | Issue – 2 | January-February 2021 Page 1133
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
management‘, Journal of Cleaner Production 263 of Building Engineering.
(2020) 121458.
[23] Muhammad Fikri Hasmori, Ahmad Faizul Md Zin,
[10] Ektewan Manowong (2012), ‘Investigating factors Sasitharan Nagapan, Rafikullah Deraman1, &co.
influencing construction waste management efforts in (2020), ‘The on-site waste minimization practices for
developing countries: an experience from Thailand‘, construction waste‘, The 2nd Global Congress on
Waste Management & Research 30(1) 56–71. Construction, Material and Structural Engineering.
[11] Hongping Yuan, Abdol R. Chini, &co (2012), ‗A [24] Mullick A. K (2014), ‘Management of Construction and
dynamic model for assessing the effects of Demolition Waste- Current Status‘, Indian Building
management strategies on the reduction of Congress.
construction and demolition waste’, Waste
[25] Olugbenga O. Akinade, Lukumon O. Oyedele, Saheed
Management 32 (2012) 521– 531.
O. Ajayi (2018), Designing out construction waste
[12] Jaime Solís-Guzmán, Madelyn Marrero, & co (2009), ‘A using BIM technology: Stakeholders' expectations for
Spanish model for quantification and management of industry deployment‘, Journal of Cleaner Production
construction waste‘, Waste Management 29 (2009) 180 (2018) 375e385.
2542–2548.
[26] Olusanjo O. Fadiya, Panos Georgakis, and Ezekiel
[13] Jianli Hao, Hongping Yuan Jing Liu, Chee Seong Chin, Chinyio, (2014), Quantitative Analysis of the Sources
Weisheng Lu, (2019), a model for assessing the of Construction Waste‘, Journal of Construction
economic performance of construction waste Engineering Volume 2014.
reduction, Journal of Cleaner Production.
[27] Oyeshola Femi Kofoworola, Shabbir H. Gheewala
[14] Jiayuan Wang, Zhengdao Li, Vivian W. Y. Tam (2015), (2009), ‘Estimation of construction waste generation
Identifying best design strategies for construction and management in Thailand‘, Waste Management.
waste minimization‘, Journal of Cleaner Production.
[28] Paola Villoria Saeza, Mercedes del Río Merinoa(2013),
[15] Jiuping Xu, Yi Shi, S. and Siwei Zhao (2018), Reverse ‘Best practice measures assessment for construction
Logistics Network-Based Multi period Optimization and demolition waste Resources‘, Conservation and
for Construction and Demolition Waste Disposal‘, Recycling management in building constructions.
American Society of Civil.
[29] Ponnada MR and Kameswari P (2016), ‘ Construction
[16] Jongsung, Won, Jack C. P. Cheng (2017), ‘Identifying and demolition waste management – A review‘,
potential Opportunities of BIM for construction and International Journal of Advanced Science and
demolition waste Management and minimization‘, Technology 84: 19–46.
Automation in Construction.
[30] Rahman, & co, (2012), ‘Issues on Construction Waste:
[17] Kamyar Kabirifar, Mohammad Mojtahedi, Changxin The Need for Sustainable Waste Management‘. Saheed
Wang, Vivian W. Y. Tam, (2020), ‘Construction and O. Ajayia, Lukumon O. Oyedeleb(2018),
demolition waste management contributing factors
[31] ‗Critical design factors for minimising waste in
coupled with reduce, reuse, and recycle strategies for
construction projects: A structural equation modelling
effective waste management: A review‘, Journal of
approach‘, Resources , Conservation & Recycling 137
Cleaner Production 263 121265.
(2018) 302–313.
[18] Lei Dua, Yingbin Fengb, Wei Lua, Lingkai Konga, Zhi
[32] Saheed O. AjayiaLukumon O. Oyedele, (2018),
Yang (2020), Evolutionary game analysis of
‗Critical Design Factors for Minimising Waste in
stakeholders' decision-making behaviours in
Construction Projects: A Structural Equation
construction and demolition waste management, ‘
Modelling Approach‘, Resources Conservation and
Environmental Impact Assessment Review 84
Recycling 137(2018):302-313.
106408.
[33] Saheed O. AjayiaLukumon O. Oyedele, (2018), Waste-
[19] Li Yinga, Zhen Yin, Tingting Guo, Jing Zhoub (2011),
efficient materials procurement for construction
‘Analysis and Research of Management Policy of
projects: A structural equation modelling of critical
Construction Waste in Beijing, ‘Procedia
success factors‘, Pu.
Environmental Sciences.
[34] Shen LY and Tam VWY (2002), ‘Implementation of
[20] Lukman A. Akanbia, Lukumon O. Oyedelea, & co
environmental management in the Hong Kong
(2018), ’Salvaging building materials in a circular
construction industry‘, International Journal of
economy: A BIM-based whole-life performance
Project Management 20: 535–543. Swarna Swetha
estimator‘, Resources, Conservation & Recycling129.
Kolaventi , TP Tezeswi and MVN Siva Kumar(2019),
[21] M Mohammed, N Shafiq, N A W Abdallah, M Ayoub ‘An assessment of construction waste management in
and A Haruna (2010), ‘A review on achieving India: A statistical approach‘, Waste Management &
sustainable construction waste management: A Research 1– 16 © The Author(s).
lifecycle approach‘, 2nd International Conference on
[35] Swarna Swetha Kolaventi; T. P. Tezeswi; and M. V. N.
Civil & Environmental Engineering; Earth and
Siva Kumar(2018), ‘A Modelling Approach to
Environmental Science.
Construction Waste Management‘, Urbanization
[22] Muhammad Bilal; Lukumon O. Oyedele; & co (2016), Challenges in Emerging Economies, Columbia
‘BigData Architecture for Construction Waste University.
Analytics (CWA): A Conceptual Framework‘, Journal

@ IJTSRD | Unique Paper ID – IJTSRD38642 | Volume – 5 | Issue – 2 | January-February 2021 Page 1134
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
[36] Talyan V, Dahiya RP and Sreekrishnan TR (2008), Construction Waste Management Policies‘,
‘State of municipal solid waste management in Delhi, Construction Research Congress 2012 © ASCE 2012
the capital of India‘, Waste Management 28: 1276– 1672.
1287.
[41] Yashuai LI1 and Xueqing ZHANG2 (2012), 'Policy
[37] Weisheng Lua, Chris Websterb, Ke Chena, Xiaoling Imperatives for Diverting Construction Waste from
Zhangc, Xi Chena (2017), ‘Computational Building Landfill: Experts ‘recommendations for UK policy
Information Modelling for construction waste expansion‘, Journal of Cleaner Production.
management: Moving from rhetoric to reality‘,
[42] Zeyad S Khaled, Dr. Basil S. Alshathr, Ali Hasan
Renewable and Sustainable Energy Reviews 68.
Hadi(2015), ‘Development of Construction Material
[38] Weisheng, Lua, Hongping , Yuanb (2010), ‘Exploring Waste Management System‘, Eng. &Tech Journal, Vol.
critical success factors for waste management in 33, Part (A), No. 3, Part (A), No. 7.
construction projects of China Resources‘,
[43] Zezhou Wu; Hongqin Fan; and Guiwen Liu (2014),
Conservation and Recycling 55 (2010) 201–208.
’Forecasting Construction and Demolition Waste
[39] Xueqing ZHANG1 and Yashuai LI (2012), ‘Multi- Using Gene Expression Programming‘, American
Attribute Decision Making in Choosing Suitable Society of Civil Engineers.
Construction Waste Management Methods‘,
[44] Zhen Liu, Mohamed Osmani, Peter emian, Andrew
Construction Research Congress © ASCE 2012.
Baldwin. (2015), ‘A BIM-aided construction waste
[40] Yashuai LI1 and Xueqing ZHANG2 (2012), Minimisation framework‘, Automation in
‘Comparison and Analysis of International Construction 59 (2015) 1–2

@ IJTSRD | Unique Paper ID – IJTSRD38642 | Volume – 5 | Issue – 2 | January-February 2021 Page 1135